Cedis Constructoin
- Based in
- San Francisco
- On San Francisco permits
- Nov 2016 to Jan 2024
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 25, 2024 | Completed final sign-off Feb 2024 | 225 San Jose Av | third floor 1) 60 ft of dry wall and patch holes and painting. install new door(closet in house) 2) tapping into gas line and run about 12 ft of y2" pipe to supply a heater. 3) run 10ft of electrical conduit for heater switch on third flr.Details
third floor 1) 60 ft of dry wall and patch holes and painting. install new door(closet in house) 2) tapping into gas line and run about 12 ft of y2" pipe to supply a heater. 3) run 10ft of electrical conduit for heater switch on third flr. | $2,500 |
| Nov 17, 2016 | Completed final sign-off Feb 2020 | 257 14th St | soft story retrofit per sfbc 34b 2012 iebc appendix a-4. ** maher: n/a **Details
soft story retrofit per sfbc 34b 2012 iebc appendix a-4. ** maher: n/a ** | $65,000 |