Cedis Constructoin

Contractor license
902489
State license record
Based in
San Francisco
On San Francisco permits
Nov 2016 to Jan 2024
Last 24 months
0 permits filed

2 permits since 2000: 2 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Jan 25, 2024Completed
final sign-off Feb 2024
225 San Jose Avthird floor 1) 60 ft of dry wall and patch holes and painting. install new door(closet in house) 2) tapping into gas line and run about 12 ft of y2" pipe to supply a heater. 3) run 10ft of electrical conduit for heater switch on third flr.
Details
Permit
202401254664
Status
complete
Filed
Jan 25, 2024
Permit issued
Jan 25, 2024
Final sign-off
Feb 23, 2024
Declared cost
$2,500
Address
225 San Jose Av

third floor 1) 60 ft of dry wall and patch holes and painting. install new door(closet in house) 2) tapping into gas line and run about 12 ft of y2" pipe to supply a heater. 3) run 10ft of electrical conduit for heater switch on third flr.

Open the permit page

$2,500
Nov 17, 2016Completed
final sign-off Feb 2020
257 14th Stsoft story retrofit per sfbc 34b 2012 iebc appendix a-4. ** maher: n/a **
Details
Permit
201611173057
Status
complete
Filed
Nov 17, 2016
Permit issued
Feb 27, 2018
Final sign-off
Feb 25, 2020
Declared cost
$65,000
Address
257 14th St

soft story retrofit per sfbc 34b 2012 iebc appendix a-4. ** maher: n/a **

Open the permit page

$65,000