Cedar Lane Construction
- Based in
- Pacifica
- On San Francisco permits
- Aug 2023 to Jan 2025
- Last 24 months
- 1 permit filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 22, 2025 | Completed final sign-off Jun 2025 | 735 Peralta Av | seismic residential retrofit. - fema bracing program.this permit is for work to be performed in general conformance with the california existing building code, apeendix a3. provide specification for size, embedment and spacing of anchor bolts:5/8" diameter x10" at 4' o.c.Details
seismic residential retrofit. - fema bracing program.this permit is for work to be performed in general conformance with the california existing building code, apeendix a3. provide specification for size, embedment and spacing of anchor bolts:5/8" diameter x10" at 4' o.c. | $8,800 |
| Aug 29, 2023 | Completed final sign-off Dec 2023 | 931 Delano Av | flat roof installation: repair broken pplumbing vents: rpace skylights: repair recessed lightingDetails
flat roof installation: repair broken pplumbing vents: rpace skylights: repair recessed lighting | $35,000 |