Ceap Construction Inc.
- Based in
- Danville
- On San Francisco permits
- Aug 2021 to Jul 2026
- Last 24 months
- 2 permits filed
5 permits since 2000: 3 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2026 | In progress issued Jul 2026 | 433 Oak Park Dr | revision to permit number 202511240274 to relocate the laundry door and closet door. revise the electrical service for 200a main panel upgrade and add two new wall opening. no other change.Details
revision to permit number 202511240274 to relocate the laundry door and closet door. revise the electrical service for 200a main panel upgrade and add two new wall opening. no other change. | $30,000 |
| Dec 15, 2025 | In progress issued Jun 2026 | 433 Oak Park Dr | comply nov#202545166. interior remodel includes kitchen renovation, bathroom remodeling, garage conversion to habitable space, recessed lighting upgrades, replacement of windows, electrical panel upgrade to 125amp. no structural work, no wall removal, no roof modification. legalize 1st flr bathroom.Details
comply nov#202545166. interior remodel includes kitchen renovation, bathroom remodeling, garage conversion to habitable space, recessed lighting upgrades, replacement of windows, electrical panel upgrade to 125amp. no structural work, no wall removal, no roof modification. legalize 1st flr bathroom. | $92,000 |
| Jun 5, 2023 | Completed final sign-off Aug 2023 | 88 Saturn St | adding bathroom at ground level, converting storage area into media room.Details
adding bathroom at ground level, converting storage area into media room. | $35,000 |
| Feb 2, 2022 | Completed final sign-off Apr 2023 | 38 Aztec St | add walls and doorways in garage space to create hallway and add square footage to home. add plumbing in large storage room to create a full bathroom, update electrical in storage room.Details
add walls and doorways in garage space to create hallway and add square footage to home. add plumbing in large storage room to create a full bathroom, update electrical in storage room. | $35,000 |
| Aug 19, 2021 | Completed final sign-off Oct 2021 | 38 Aztec St | remodel kitchen, guest bath and master bath with walls, floor plan with changes to walls and floor plans, reface gas fire place, replace recessed light fixturesDetails
remodel kitchen, guest bath and master bath with walls, floor plan with changes to walls and floor plans, reface gas fire place, replace recessed light fixtures | $40,000 |