Ccsf-Dept. Public Works
- Based in
- San Francisco
- On San Francisco permits
- May 2018 to Sep 2026
- Last 24 months
- 1 permit filed
Also written on permits as: Lam's Construction Co.
3 permits since 2000: 1 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 461 06th Av | replace existing slate roofing ar rear building only with new simulated slate. 3,500 sf new roofing. remove existing roofing down to (e) wod roof deck per cbc 1512.2. (n) roofing to meet cool roof rqmnts, be class a roofing assembly and comply with all mfr reqmts per cbc 1512.3. davinci slate,Details
replace existing slate roofing ar rear building only with new simulated slate. 3,500 sf new roofing. remove existing roofing down to (e) wod roof deck per cbc 1512.2. (n) roofing to meet cool roof rqmnts, be class a roofing assembly and comply with all mfr reqmts per cbc 1512.3. davinci slate, | $200,000 |
| Apr 28, 2021 | Completed final sign-off Mar 2024 | 1 11th Av | remove extg asphalt pathway and landing. replace with wooden walkway. separate permit required for helical piers/piles.Details
remove extg asphalt pathway and landing. replace with wooden walkway. separate permit required for helical piers/piles. | $198,000 |
| May 1, 2018 | Never finaled issued Jun 2018, no final | 762 Fulton St | no construction. verifying occupant load calculations per 3 assembly rooms. revision to pa 2018-0226-2272 establish occupancy for assembly permit only to include a-2.Details
no construction. verifying occupant load calculations per 3 assembly rooms. revision to pa 2018-0226-2272 establish occupancy for assembly permit only to include a-2. |