Ccsf-Dept. Public Works

Contractor license
8
State license record
Based in
San Francisco
On San Francisco permits
May 2018 to Sep 2026
Last 24 months
1 permit filed

Also written on permits as: Lam's Construction Co.

3 permits since 2000: 1 completed, 1 in progress, 1 never finaled.

Of the 1 never-finaled permit, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Sep 15, 2026In progress
filed Sep 2026, not yet issued
461 06th Avreplace existing slate roofing ar rear building only with new simulated slate. 3,500 sf new roofing. remove existing roofing down to (e) wod roof deck per cbc 1512.2. (n) roofing to meet cool roof rqmnts, be class a roofing assembly and comply with all mfr reqmts per cbc 1512.3. davinci slate,
Details
Permit
202609158150
Status
filed
Filed
Sep 15, 2026
Declared cost
$200,000
Address
461 06th Av

replace existing slate roofing ar rear building only with new simulated slate. 3,500 sf new roofing. remove existing roofing down to (e) wod roof deck per cbc 1512.2. (n) roofing to meet cool roof rqmnts, be class a roofing assembly and comply with all mfr reqmts per cbc 1512.3. davinci slate,

Open the permit page

$200,000
Apr 28, 2021Completed
final sign-off Mar 2024
1 11th Avremove extg asphalt pathway and landing. replace with wooden walkway. separate permit required for helical piers/piles.
Details
Permit
202104289493
Status
complete
Filed
Apr 28, 2021
Permit issued
May 19, 2022
Final sign-off
Mar 13, 2024
Declared cost
$198,000
Address
1 11th Av

remove extg asphalt pathway and landing. replace with wooden walkway. separate permit required for helical piers/piles.

Open the permit page

$198,000
May 1, 2018Never finaled
issued Jun 2018, no final
762 Fulton Stno construction. verifying occupant load calculations per 3 assembly rooms. revision to pa 2018-0226-2272 establish occupancy for assembly permit only to include a-2.
Details
Permit
201805017873
Status
issued
Filed
May 1, 2018
Permit issued
Jun 7, 2018
Address
762 Fulton St

no construction. verifying occupant load calculations per 3 assembly rooms. revision to pa 2018-0226-2272 establish occupancy for assembly permit only to include a-2.

Open the permit page