Ccm Finish Carpentry & Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2012 to Jul 2020
- Last 24 months
- 0 permits filed
16 permits since 2000: 16 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 17, 2020 | Completed final sign-off Aug 2020 | 590 Steiner St | in kind repair of existing 3rd floor balcony. plywood decking needs to be replaced and re waterproofed. no work to the visible part of the balcony from the street. repair work less than 50% of balcony.Details
in kind repair of existing 3rd floor balcony. plywood decking needs to be replaced and re waterproofed. no work to the visible part of the balcony from the street. repair work less than 50% of balcony. | $2,800 |
| Sep 16, 2019 | Completed final sign-off Sep 2020 | 446 Missouri St | window replacement with all wood ,double hung windows with ogee lugs. siding repair and replacement to match original construction. street side only per plans.Details
window replacement with all wood ,double hung windows with ogee lugs. siding repair and replacement to match original construction. street side only per plans. | $30,000 |
| Nov 13, 2015 | Completed final sign-off May 2018 | 446 Missouri St | demo 3 int walls to accomodate bath relocation. structural beam/posts w/spread footings req'd . demo (e) chimney, relocate water heater. new plywood shear wall w/footing at rear of bldg. new bath addition to 3rd flr, window reconfiguration at rear of bldg as shown.light tubes on upper flr as shown.Details
demo 3 int walls to accomodate bath relocation. structural beam/posts w/spread footings req'd . demo (e) chimney, relocate water heater. new plywood shear wall w/footing at rear of bldg. new bath addition to 3rd flr, window reconfiguration at rear of bldg as shown.light tubes on upper flr as shown. | $52,500 |
| Nov 13, 2015 | Completed final sign-off May 2018 | 448 Missouri St | demo 3 int walls to accomodate bath relocation. structural beam/posts w/spread footings req'd. demo (e) chimney, relocate water heater. new plywood shear wall w/footing at rear of bldg. new bath addition to 2nd flr, window reconfiguration at rear of bldg as shown.Details
demo 3 int walls to accomodate bath relocation. structural beam/posts w/spread footings req'd. demo (e) chimney, relocate water heater. new plywood shear wall w/footing at rear of bldg. new bath addition to 2nd flr, window reconfiguration at rear of bldg as shown. | $52,500 |
| May 8, 2015 | Completed final sign-off May 2016 | 937 Cole St | front facade repair: replace windows, doors, siding. vault ceiling under skylight; some new & replaced lights; accessibility upgrades: relcoate toilets, replace sinks, new atm.Details
front facade repair: replace windows, doors, siding. vault ceiling under skylight; some new & replaced lights; accessibility upgrades: relcoate toilets, replace sinks, new atm. | $42,000 |
| Jan 12, 2015 | Completed final sign-off Apr 2015 | 1268 Treat Av | the existing kitchen at upper level will be remodeled as shown.the existing kitchen pantry will be expanded for new bathrm, relocate washer/dryer & water will be relocated as shown. (e)bedrm door will be relocated & widened as shown.Details
the existing kitchen at upper level will be remodeled as shown.the existing kitchen pantry will be expanded for new bathrm, relocate washer/dryer & water will be relocated as shown. (e)bedrm door will be relocated & widened as shown. | $35,000 |
| Feb 27, 2014 | Completed final sign-off Jul 2014 | 700 Cabrillo St | replace vinyl windows with double-hung wood or aluminum clad wood windows with ogee lugsDetails
replace vinyl windows with double-hung wood or aluminum clad wood windows with ogee lugs | $30,000 |
| Jan 23, 2014 | Completed final sign-off Jun 2015 | 592 Pennsylvania Av | replace back stairs going to 3rd floor, add a small deck to the back of 3rd floor.Details
replace back stairs going to 3rd floor, add a small deck to the back of 3rd floor. | $15,000 |
| Dec 10, 2013 | Completed final sign-off Sep 2014 | 105 Midcrest Wy | revision to pa# 201311192304. replace in kind rotted beams joists framing, hold downs etc. ref as built drawings approved plan 9507792Details
revision to pa# 201311192304. replace in kind rotted beams joists framing, hold downs etc. ref as built drawings approved plan 9507792 | $2,500 |
| Nov 19, 2013 | Completed final sign-off Sep 2014 | 105 Midcrest Wy | remove existing finish on 3 balconies. re waterproof, flash; refinish balconies. replace existing metal railings with wood.Details
remove existing finish on 3 balconies. re waterproof, flash; refinish balconies. replace existing metal railings with wood. | $17,500 |
| Jul 23, 2013 | Completed final sign-off Oct 2013 | 446 Missouri St | to comply with physical inspection report cc7258Details
to comply with physical inspection report cc7258 | $1,000 |
| Jun 10, 2013 | Completed final sign-off Aug 2013 | 719 Anderson St | remodel kitchen, remove 2 walls, add structural beams & posts.Details
remodel kitchen, remove 2 walls, add structural beams & posts. | $15,000 |
| Nov 21, 2012 | Completed final sign-off Jan 2013 | 855 Lincoln Wy | unit #1: bathroom remodel. move (e) drain. shorten 2 feet. install tub. retile shower area. install vinity and sink. new floor tile. drywal.Details
unit #1: bathroom remodel. move (e) drain. shorten 2 feet. install tub. retile shower area. install vinity and sink. new floor tile. drywal. | $7,500 |
| Aug 29, 2012 | Completed final sign-off Nov 2012 | 1590 Golden Gate Av | unit b & c - rear bldg: rebuild stairs to conform to the cbc 2010 stair construction requirements for rise & run. work to be doen in a common area.Details
unit b & c - rear bldg: rebuild stairs to conform to the cbc 2010 stair construction requirements for rise & run. work to be doen in a common area. | $12,000 |
| Aug 29, 2012 | Completed final sign-off Oct 2012 | 1590 Golden Gate Av | unit a - front bldg: replace stairs in kind as required to properly repair existing damage. work to be doen in a common area.Details
unit a - front bldg: replace stairs in kind as required to properly repair existing damage. work to be doen in a common area. | $8,000 |
| Mar 20, 2012 | Completed final sign-off May 2012 | 855 Lincoln Wy | kitchen remodel. no change to floor plan or walls. rewire kitchen, move sub panel from closet to hallway. add recessed lighting to living room use existing plumbing (n) kitchen lighting shall comply with cec 150(k)8Details
kitchen remodel. no change to floor plan or walls. rewire kitchen, move sub panel from closet to hallway. add recessed lighting to living room use existing plumbing (n) kitchen lighting shall comply with cec 150(k)8 | $18,000 |