Cccs, Inc
- Based in
- Sacramento
- On San Francisco permits
- Jul 2006 to Feb 2023
- Last 24 months
- 0 permits filed
61 permits since 2000: 49 completed, 5 never finaled, 7 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 17, 2023 | Completed final sign-off Sep 2023 | 101 Montgomery St | install auto door opener @ bank entranceDetails
install auto door opener @ bank entrance | $25,000 |
| Dec 22, 2022 | Completed final sign-off Apr 2025 | 1811 19th Av | to comply with accessible businness program abe# 202201273052. alteration to an (e) accessible ramp, sidewalk, stairs and storefront at the main entry to bring it into compliance with current aoa standards. the entire scope of work is soley for the purpose of removing barriers.Details
to comply with accessible businness program abe# 202201273052. alteration to an (e) accessible ramp, sidewalk, stairs and storefront at the main entry to bring it into compliance with current aoa standards. the entire scope of work is soley for the purpose of removing barriers. | $174,000 |
| Dec 22, 2022 | Completed final sign-off Oct 2023 | 401 California St | installing of automatic door operators at both bank entrances. the project is solely for the purpose of removing barriers.Details
installing of automatic door operators at both bank entrances. the project is solely for the purpose of removing barriers. | $65,000 |
| Nov 29, 2022 | Completed final sign-off May 2024 | 500 Van Ness Av | chase bank: replacement of interior chair lift with platform lift.Details
chase bank: replacement of interior chair lift with platform lift. | $90,000 |
| Oct 24, 2022 | Completed final sign-off Dec 2024 | 2 Embarcadero Center | to comply with access business entrnace, abe #201811072374. replacement of entry door for ada compliance.Details
to comply with access business entrnace, abe #201811072374. replacement of entry door for ada compliance. | $15,000 |
| May 29, 2014 | Completed final sign-off Jun 2014 | 2696 Geary Bl | to obtain final inspection for work approved under pa# 201208137214. all work is complete.Details
to obtain final inspection for work approved under pa# 201208137214. all work is complete. | |
| Aug 6, 2013 | Completed final sign-off Aug 2013 | 1100 Divisadero St | revision to 201206152723. reduction in scope of work. work in area marked equipment area plan b. no oinstallation of new att 2106 rbs cabinets and 2 new purcell cabinets with 2 new 6661 rbs units stacked 1 6661 lte 1 tt01 umtsDetails
revision to 201206152723. reduction in scope of work. work in area marked equipment area plan b. no oinstallation of new att 2106 rbs cabinets and 2 new purcell cabinets with 2 new 6661 rbs units stacked 1 6661 lte 1 tt01 umts | |
| May 6, 2013 | Completed final sign-off Jun 2013 | 2198 Chestnut St | demolish extg 2"curb and flatwork within. pour 4" concrete slab on grade to match adjacent walk, add new bollards at extg gas meter and add pipe rails at extg landing.Details
demolish extg 2"curb and flatwork within. pour 4" concrete slab on grade to match adjacent walk, add new bollards at extg gas meter and add pipe rails at extg landing. | $7,600 |
| Apr 16, 2013 | Completed final sign-off Aug 2014 | 3110 Octavia St | at&t mobility is proposing to install unmanned wireless facility. 12 panel antennas are proposed on roof. equipment is on ground.Details
at&t mobility is proposing to install unmanned wireless facility. 12 panel antennas are proposed on roof. equipment is on ground. | $150,000 |
| Jan 3, 2013 | Completed final sign-off Apr 2013 | 845 Market St | 7th floor-revision to app#201208086821 to change anchor bolt detail on page s-1Details
7th floor-revision to app#201208086821 to change anchor bolt detail on page s-1 | |
| Oct 30, 2012 | Completed final sign-off Apr 2014 | 890 Taraval St | install 2 new condensors on roof & install 7 new 6201 r135 cabinets in new 652 sq ft. lease area & add new 200 amp sub panel on 2nd floor. remove 100 amp sub panel & replace with new 200 amp sub panel on 1st floor electrical room. non wtf site, internal server room, no antennas transmitting at site.Details
install 2 new condensors on roof & install 7 new 6201 r135 cabinets in new 652 sq ft. lease area & add new 200 amp sub panel on 2nd floor. remove 100 amp sub panel & replace with new 200 amp sub panel on 1st floor electrical room. non wtf site, internal server room, no antennas transmitting at site. | $45,000 |
| Aug 30, 2012 | Expired or cancelled expired Mar 2014 | 2895 Diamond St | relocate existing atm. remove existing partion door and exterior light fixture. add new partition store front ot create interior atm vestibule.Details
relocate existing atm. remove existing partion door and exterior light fixture. add new partition store front ot create interior atm vestibule. | $8,000 |
| Aug 13, 2012 | Completed final sign-off Jun 2014 | 2696 Geary Bl | add 3 (n) rrus and 3 (n) dtmas. install one (n) 6601 dvw unit inside an (e) prucell equipment cabinet on roof.Details
add 3 (n) rrus and 3 (n) dtmas. install one (n) 6601 dvw unit inside an (e) prucell equipment cabinet on roof. | $10,000 |
| Aug 8, 2012 | Completed final sign-off Apr 2013 | 845 Market St | 7th fl-modification of existing telecommunication facility consisting of adding a misc cabinet, 2 radio cabinets, a 6101 lte cabinet, a power bay, a ciena cabinet, a uam cabinet, a 100a subpanel, 4 new coax cable ladder segments, & 2 new gps antennas.Details
7th fl-modification of existing telecommunication facility consisting of adding a misc cabinet, 2 radio cabinets, a 6101 lte cabinet, a power bay, a ciena cabinet, a uam cabinet, a 100a subpanel, 4 new coax cable ladder segments, & 2 new gps antennas. | $30,000 |
| Jul 23, 2012 | Expired or cancelled cancelled Mar 2016 | 260 Golden Gate Av | remove & relocate 1 (e) antenna at sector b. install 3 new prus at antennas. remove & replace 2 (e) antennas at sector a & c (like for like). install (n) 6601 umt in (e) 19" rack.Details
remove & relocate 1 (e) antenna at sector b. install 3 new prus at antennas. remove & replace 2 (e) antennas at sector a & c (like for like). install (n) 6601 umt in (e) 19" rack. | $15,000 |
| Jul 19, 2012 | Expired or cancelled expired Nov 2015 | 490 Jamestown Av | installation of wireless equipment cabinets & supporting cables in a 160sq.ft. lease area to support vzw's participation in the existing nuetral das site with associated utitilies & fiber cable lines. no new exterior antennas to be added.Details
installation of wireless equipment cabinets & supporting cables in a 160sq.ft. lease area to support vzw's participation in the existing nuetral das site with associated utitilies & fiber cable lines. no new exterior antennas to be added. | $30,000 |
| Jun 15, 2012 | Completed final sign-off Aug 2013 | 1100 Divisadero St | a(n)unmanned telecommunication facility consisting of add (2)(n) att rbs cabinets,(1)(n)rba a72 cabinets&(6)(n)purcell cabinets to a (n)494 ft 2/ease area, (6)(n) rrh's,(18)(n) rru's,(3)(n) dc-surge suppressor&(12)(n)att antennas inside a (n)10'2" frp steeple extension,paint&texture to match(e)bldg.Details
a(n)unmanned telecommunication facility consisting of add (2)(n) att rbs cabinets,(1)(n)rba a72 cabinets&(6)(n)purcell cabinets to a (n)494 ft 2/ease area, (6)(n) rrh's,(18)(n) rru's,(3)(n) dc-surge suppressor&(12)(n)att antennas inside a (n)10'2" frp steeple extension,paint&texture to match(e)bldg. | $145,000 |
| Apr 18, 2012 | Completed final sign-off Jun 2013 | 5630 Mission St | per case #20110418c. installiation of (9) panel type antennas and associated equipment.Details
per case #20110418c. installiation of (9) panel type antennas and associated equipment. | $50,000 |
| Feb 27, 2012 | Completed final sign-off Mar 2012 | 6221 Geary Bl | new layout for installation of lte cabinet per pa#201004089881Details
new layout for installation of lte cabinet per pa#201004089881 | $3,000 |
| Aug 4, 2011 | Completed final sign-off Feb 2013 | 562 Market St | installation of an unmanned wireless telecommunication facility for at & t consisting of 12 panel antennas located on the (e) penthouse of the roof. associated equipment will be located on the roof screen from view.Details
installation of an unmanned wireless telecommunication facility for at & t consisting of 12 panel antennas located on the (e) penthouse of the roof. associated equipment will be located on the roof screen from view. | $154,918 |
| Aug 2, 2011 | Completed final sign-off Sep 2011 | 602 The Embarcadero | revision to pa# 2010-0714-6615-a/8 conduit shroud detail changeDetails
revision to pa# 2010-0714-6615-a/8 conduit shroud detail change | |
| May 4, 2011 | Never finaled issued May 2011, no final | 124 02nd St | roof, mezz., and ground floors mep's. reference drawings app #201104144101Details
roof, mezz., and ground floors mep's. reference drawings app #201104144101 | $90,000 |
| May 4, 2011 | Never finaled issued Jul 2011, no final | 124 02nd St | ground floor-t.i includes demo of non structural exteior wall & glass storefront. all new & revised hvac, electrical, plumbing, life safety work will be fully engineered as required & submitted seperately. building is not fully sprinklered (structural included)Details
ground floor-t.i includes demo of non structural exteior wall & glass storefront. all new & revised hvac, electrical, plumbing, life safety work will be fully engineered as required & submitted seperately. building is not fully sprinklered (structural included) | $11,000 |
| Apr 14, 2011 | Never finaled issued Apr 2011, no final | 124 02nd St | ground floor: t.i. demolition of non structural partitions and building, new non structural partition; all new or revised hvac, electrical, plmg; lifesafty will be fully engineered as required and submitted for permit separately. building is not fully sprinklered.Details
ground floor: t.i. demolition of non structural partitions and building, new non structural partition; all new or revised hvac, electrical, plmg; lifesafty will be fully engineered as required and submitted for permit separately. building is not fully sprinklered. | $352,153 |
| Mar 21, 2011 | Completed final sign-off Jul 2011 | 833 Mission St | install new atm machine for chase bank.Details
install new atm machine for chase bank. | $8,000 |
| Dec 13, 2010 | Never finaled issued Jan 2011, no final | 444 Presidio Av | rooftop wireless facitlity: install 1 equipment cabinets, 3 panel antennas, 1 gps antenna. approved by planning/sf planning commision 9/30/10 per motion 18187Details
rooftop wireless facitlity: install 1 equipment cabinets, 3 panel antennas, 1 gps antenna. approved by planning/sf planning commision 9/30/10 per motion 18187 | $45,000 |
| Sep 30, 2010 | Completed final sign-off Aug 2011 | 647 Mission St | installation of an unmanned wireless communication facility (at & t mobility) consisting of 6 new antennas & 6 new equipment cabinets plus 16 new rru cabinets on roofDetails
installation of an unmanned wireless communication facility (at & t mobility) consisting of 6 new antennas & 6 new equipment cabinets plus 16 new rru cabinets on roof | $150,000 |
| Aug 6, 2010 | Completed final sign-off Aug 2011 | 555 Market St | installation of an unmanned telecommunications facility, consisting of equipment cabinets installed within an (e) room on the 21st floor, and antennas mounted on the roof.Details
installation of an unmanned telecommunications facility, consisting of equipment cabinets installed within an (e) room on the 21st floor, and antennas mounted on the roof. | $65,000 |
| Jul 21, 2010 | Expired or cancelled withdrawn May 2016 | 451 Montgomery St | modification to an (e) unmanned telecommunication facility consising of add (1)(n) 3206 cabinet, (3)(n) dtma's & (6)(n) rums of coax. swap (3)(n) antenna w/(3)(n) antennas w/ret's (remote elections tilt). ret powered by low voltage signaled through (e) coax cable.Details
modification to an (e) unmanned telecommunication facility consising of add (1)(n) 3206 cabinet, (3)(n) dtma's & (6)(n) rums of coax. swap (3)(n) antenna w/(3)(n) antennas w/ret's (remote elections tilt). ret powered by low voltage signaled through (e) coax cable. | $60,000 |
| Jul 14, 2010 | Completed final sign-off Nov 2011 | 602 The Embarcadero | modification to an (e) unmanned telecom facility consisting of remodeling (e) at & t equipment & adding 3 new 2106rbs cabinets, 2 new 3106 rbs cabinets on the roof. also removing 3 (e) at & t antennas, replacing with 12 new antennas on the (e) penthouse, paint to match (e) buildingDetails
modification to an (e) unmanned telecom facility consisting of remodeling (e) at & t equipment & adding 3 new 2106rbs cabinets, 2 new 3106 rbs cabinets on the roof. also removing 3 (e) at & t antennas, replacing with 12 new antennas on the (e) penthouse, paint to match (e) building | $193,045 |
| Jun 23, 2010 | Never finaled issued Jun 2010, no final | 3550 Geary Bl | remove and replace sidewalk on geary st. and on palm av. due to trip hazards. also replace concrete @ entry on geary st. and around atmDetails
remove and replace sidewalk on geary st. and on palm av. due to trip hazards. also replace concrete @ entry on geary st. and around atm | $65,700 |
| May 14, 2010 | Completed final sign-off Feb 2019 | 470 Columbus Av | mod. to approved appl.#200702053389 to add a faux vent pipe to conceal antenna & to add 2'-2 1/2"x2'-5 7/8" lmu box for e-911 capability.Details
mod. to approved appl.#200702053389 to add a faux vent pipe to conceal antenna & to add 2'-2 1/2"x2'-5 7/8" lmu box for e-911 capability. | $6,500 |
| Mar 12, 2010 | Expired or cancelled withdrawn Feb 2016 | 201 Spear St | modification of (e) unmanned telecommunication facility consisting of adding (n) antenna with (n) ret's (remote electronicly) to antennas. ret powered by low volatage signed through (e) coax cable. also adding a (n) dtma & (2) (n) rvns of coax.Details
modification of (e) unmanned telecommunication facility consisting of adding (n) antenna with (n) ret's (remote electronicly) to antennas. ret powered by low volatage signed through (e) coax cable. also adding a (n) dtma & (2) (n) rvns of coax. | $25,000 |
| Mar 5, 2010 | Expired or cancelled expired Feb 2012 | 633 Folsom St | wireless facility: install 1-equipment cabinet; 1-internet services exchange antenna; 1-gps antenna; 3-rf panel antennas. located on roof.Details
wireless facility: install 1-equipment cabinet; 1-internet services exchange antenna; 1-gps antenna; 3-rf panel antennas. located on roof. | $45,000 |
| Jan 29, 2010 | Completed final sign-off Oct 2010 | 200 Sansome St | clearwire. wireless facility: install 1 equipment rack in basement, 2 internet services exchange antennas, 3 panel antennas and 1 gps antenna on roof.Details
clearwire. wireless facility: install 1 equipment rack in basement, 2 internet services exchange antennas, 3 panel antennas and 1 gps antenna on roof. | $45,000 |
| Jan 29, 2010 | Completed final sign-off Dec 2010 | 101 California St | clearwire. internet backhaul installation. install 1 equipment cabinet, 4 internet services exchange switch antennas and 1 gps antenna on roof on (e) open pole mounts.Details
clearwire. internet backhaul installation. install 1 equipment cabinet, 4 internet services exchange switch antennas and 1 gps antenna on roof on (e) open pole mounts. | $45,000 |
| Jan 29, 2010 | Completed final sign-off Aug 2010 | 333 Ofarrell St | clearwire. internet backhaul installation. install 1 equipment rack, 6 internet services exchange switch antenna and 1 gps antenna on roof.Details
clearwire. internet backhaul installation. install 1 equipment rack, 6 internet services exchange switch antenna and 1 gps antenna on roof. | $45,000 |
| Dec 23, 2009 | Completed final sign-off Oct 2010 | 340 Stockton St | wireless intallation. 1 equipment cabinet on roof. 3 panel antennas, 3 internet services exchange antennas. 1 gps antenna mounted on penthouse facade.Details
wireless intallation. 1 equipment cabinet on roof. 3 panel antennas, 3 internet services exchange antennas. 1 gps antenna mounted on penthouse facade. | $45,000 |
| Dec 22, 2009 | Completed final sign-off Jun 2010 | 380 Clementina St | installation of 1 equipment cabinets, 4 internet services exchange antennas, 3 panel antennas & 1 gps antenna on rooftop & penthouseDetails
installation of 1 equipment cabinets, 4 internet services exchange antennas, 3 panel antennas & 1 gps antenna on rooftop & penthouse | $45,000 |
| Nov 20, 2009 | Completed final sign-off May 2012 | 221 Main St | clearwire. installation of 1 equipment cabinet, 2 internet services exchange antennas, 3 panel antennas and 1 gps antennas located on the roof.Details
clearwire. installation of 1 equipment cabinet, 2 internet services exchange antennas, 3 panel antennas and 1 gps antennas located on the roof. | $45,000 |
| Nov 13, 2009 | Completed final sign-off Dec 2010 | 510 Frederick St | modification in design per case 20060797c. installation of 1 equipment rack in existing sprint shelter in basement. 3 rf panel antennas on penthouse on roof and 1 gps antennaDetails
modification in design per case 20060797c. installation of 1 equipment rack in existing sprint shelter in basement. 3 rf panel antennas on penthouse on roof and 1 gps antenna | $45,000 |
| Oct 2, 2009 | Completed final sign-off Dec 2010 | 2601 Mission St | wireless modification. add (3) rf panel antennas on roof; (1) gps antenna; (1) equipment cabinet on 7th fl.on (e) sprint shelter on 7th fl. utilizing previously approved entitlements.Details
wireless modification. add (3) rf panel antennas on roof; (1) gps antenna; (1) equipment cabinet on 7th fl.on (e) sprint shelter on 7th fl. utilizing previously approved entitlements. | $45,000 |
| Sep 25, 2009 | Completed final sign-off Jun 2010 | 401 Keith St | wts facility: installation of (3) rf panel antennas, 2 internet services exchange antennas, 1 gps antenna, located on the roof. (1) equipment cabinet outside on the ground floor.Details
wts facility: installation of (3) rf panel antennas, 2 internet services exchange antennas, 1 gps antenna, located on the roof. (1) equipment cabinet outside on the ground floor. | $45,000 |
| Aug 28, 2009 | Completed final sign-off Jun 2010 | 965 Mission St | wts facility installation. 1-bts equipment cabinet in basement: (3) rf panel antennas, (1) internet service exchange switch antenna and (1) gps antenna on the roof top.Details
wts facility installation. 1-bts equipment cabinet in basement: (3) rf panel antennas, (1) internet service exchange switch antenna and (1) gps antenna on the roof top. | $45,000 |
| Aug 19, 2009 | Completed final sign-off Oct 2010 | 100 Powell St | wts facility installation of 1 bts equipment cabinet, 3 rf panel antennas concealed within 2 frp radomes, 1 gps andtenna on rooftop.Details
wts facility installation of 1 bts equipment cabinet, 3 rf panel antennas concealed within 2 frp radomes, 1 gps andtenna on rooftop. | $45,000 |
| Aug 14, 2009 | Completed final sign-off Dec 2010 | 888 Brannan St | installation of 1 bts equipment rack inside (e) nextel shelter on roof. 3 panel antennas ( 1 inside screened struc, existing nextel area, 2 on (e) penthouse. 1 internet services exchange antenna. 1 gps antenna wireless telecom site. (clearwire)Details
installation of 1 bts equipment rack inside (e) nextel shelter on roof. 3 panel antennas ( 1 inside screened struc, existing nextel area, 2 on (e) penthouse. 1 internet services exchange antenna. 1 gps antenna wireless telecom site. (clearwire) | $45,000 |
| Jul 23, 2009 | Completed final sign-off Oct 2010 | 810 Battery St | installation of umanned wireless telecom. facility including 4 base station equip. cabs within sheet metal screen wall exposure, and 3 antennas enclosed w'in rf friendly screening material. installation will be on roof topDetails
installation of umanned wireless telecom. facility including 4 base station equip. cabs within sheet metal screen wall exposure, and 3 antennas enclosed w'in rf friendly screening material. installation will be on roof top | $90,000 |
| Jul 14, 2009 | Completed final sign-off Aug 2009 | 2001 37th Av | remove (e) 3206 cabinet and install 3418 cabinet for units 850/1900. add optical fiber for 3418 cabinet. install remote electronic tilts on umts antenna.Details
remove (e) 3206 cabinet and install 3418 cabinet for units 850/1900. add optical fiber for 3418 cabinet. install remote electronic tilts on umts antenna. | $5,000 |
| Jun 29, 2009 | Completed final sign-off Jul 2010 | 500 Beach St | installation of an unmanned telecomunication facility ( t mobile) including 4 bts cabinets and 5 cellular antennas on the top floor of the parking garage within (n) chain link fence ( 6' high)Details
installation of an unmanned telecomunication facility ( t mobile) including 4 bts cabinets and 5 cellular antennas on the top floor of the parking garage within (n) chain link fence ( 6' high) | $95,000 |
| Jun 12, 2009 | Completed final sign-off Oct 2009 | 1000 Grant Av | install new exterior tile over (e) tile on columns around facility (7 columns) approx 2' x 10'.Details
install new exterior tile over (e) tile on columns around facility (7 columns) approx 2' x 10'. | $8,200 |
| May 11, 2009 | Expired or cancelled expired Apr 2011 | 2201 Irving St | modificatio of an (e) unmanned telecommunication facility consisting of removing an (e) rbs 3303 radio cabient & replacing it with a (n) rbs 3518 radio cabient & adding (2) new remote radio units (rru's),(1) new pbc-02 battery backup cabinet.Details
modificatio of an (e) unmanned telecommunication facility consisting of removing an (e) rbs 3303 radio cabient & replacing it with a (n) rbs 3518 radio cabient & adding (2) new remote radio units (rru's),(1) new pbc-02 battery backup cabinet. | $5,000 |
| Apr 8, 2009 | Completed final sign-off Jun 2009 | 988 Howard St | renew pa# 2007/09/12/2502 to complete work & obtain final inspection.Details
renew pa# 2007/09/12/2502 to complete work & obtain final inspection. | $2,200 |
| Jan 7, 2009 | Completed final sign-off Aug 2009 | 2450 17th St | at & t wireless propoe to modify (e) telecom facility. modifications to facility will consist of 6 tma's to 3 of the (e) antennas. installation of 6 coax cables that run from equipment cabinets to (e) antennas. install 3 (rets) to back of (e) antennas & reconfigure (adding internal radios) and (e)Details
at & t wireless propoe to modify (e) telecom facility. modifications to facility will consist of 6 tma's to 3 of the (e) antennas. installation of 6 coax cables that run from equipment cabinets to (e) antennas. install 3 (rets) to back of (e) antennas & reconfigure (adding internal radios) and (e) | $5,000 |
| Oct 31, 2008 | Completed final sign-off Jun 2009 | 988 Howard St | revision to appl #200709122502 to relocate atm machine to be at the exteropr wall setback 3'-0" from the property line. also mechanical electrical & plumbing tenant improvements are included.Details
revision to appl #200709122502 to relocate atm machine to be at the exteropr wall setback 3'-0" from the property line. also mechanical electrical & plumbing tenant improvements are included. | $20,000 |
| Feb 5, 2007 | Completed final sign-off Sep 2010 | 470 Columbus Av | installation of a new microcell panel antenna within a faux vent. installation of associatied equipment, cabling, and cable trays no batteries.Details
installation of a new microcell panel antenna within a faux vent. installation of associatied equipment, cabling, and cable trays no batteries. | $55,000 |
| Sep 21, 2006 | Completed final sign-off Apr 2007 | 201 Mission St | oti-1 revision, 11th floor, sp, meDetails
oti-1 revision, 11th floor, sp, me | |
| Sep 21, 2006 | Completed final sign-off Apr 2007 | 201 Mission St | oti-1 revision, 10th floor, sp, meDetails
oti-1 revision, 10th floor, sp, me | |
| Sep 13, 2006 | Completed final sign-off Apr 2007 | 201 Mission St | oti-2, 11th floor, me, ls.Details
oti-2, 11th floor, me, ls. | $60,000 |
| Sep 13, 2006 | Completed final sign-off Apr 2007 | 201 Mission St | oti-2 el me 10th floorDetails
oti-2 el me 10th floor | $70,000 |
| Jul 21, 2006 | Completed final sign-off Apr 2007 | 201 Mission St | oti-1, 10th floor, elDetails
oti-1, 10th floor, el | $130,000 |
| Jul 21, 2006 | Completed final sign-off Apr 2007 | 201 Mission St | oti-1 11th floor, el, ls.Details
oti-1 11th floor, el, ls. | $70,050 |