Castle Builder Co
- Based in
- San Francisco
- On San Francisco permits
- Aug 2002 to May 2022
- Last 24 months
- 0 permits filed
33 permits since 2000: 14 completed, 12 never finaled, 7 expired or cancelled.
Of the 12 never-finaled permits, 3 are 3 to 5 years old, 6 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 25, 2022 | Never finaled issued May 2022, no final | 402 Broadway | to obtain final inspection for work approved under pa# 202001151985 all work is completeDetails
to obtain final inspection for work approved under pa# 202001151985 all work is complete | |
| Feb 1, 2022 | Never finaled issued Feb 2022, no final | 402 Broadway | to comply with nov #202185151 #2, #5, #7, #4. 2nd floor shower at the rear of the building. repair exposed pipes, wires and build up ceiling. framed for new drywall. prime & paint. work in residential area.Details
to comply with nov #202185151 #2, #5, #7, #4. 2nd floor shower at the rear of the building. repair exposed pipes, wires and build up ceiling. framed for new drywall. prime & paint. work in residential area. | $2,500 |
| Apr 29, 2021 | Completed final sign-off Jul 2021 | 2263 Sacramento St | install evacuation maps for floors 1-3.Details
install evacuation maps for floors 1-3. | $11,000 |
| Mar 17, 2021 | Completed final sign-off Oct 2021 | 2263 Sacramento St | in place alteration of extg kitchens at floors 2 and 3, remove island cabinets at 3rd floor apartment kitchen, converting common use facilities to common use lounge at other areas. [ref 2018-1113-5638 & 2018-0404-5454]Details
in place alteration of extg kitchens at floors 2 and 3, remove island cabinets at 3rd floor apartment kitchen, converting common use facilities to common use lounge at other areas. [ref 2018-1113-5638 & 2018-0404-5454] | $15,000 |
| Nov 17, 2020 | Expired or cancelled expired Nov 2025 | 3625 Ortega St | rev pa 201810022005. added (n) skylt in office, rev flr datum/elevation, adu now has same flr level thru-out. revised ceiling ht, changed bathrm #1 layout, bathrm #2 flipped wc & shower, added utility sink, relocated (e) furnace, changed heating system of adu to heating systems. rev framing planDetails
rev pa 201810022005. added (n) skylt in office, rev flr datum/elevation, adu now has same flr level thru-out. revised ceiling ht, changed bathrm #1 layout, bathrm #2 flipped wc & shower, added utility sink, relocated (e) furnace, changed heating system of adu to heating systems. rev framing plan | $5,000 |
| Sep 3, 2020 | Completed final sign-off Sep 2021 | 2263 Sacramento St | repair in-kind front entry stairDetails
repair in-kind front entry stair | $10,000 |
| Jan 15, 2020 | Never finaled issued Jan 2020, no final | 402 Broadway | repair existing dryrot damage at the back side of the building. install new floor drain at laundry 5/8 drywall. dryer line, tile at the same location. electrical and plumbing upgrade along with other repairs, non-structural sub-floor & finish floor in the hallways. remodel in kindDetails
repair existing dryrot damage at the back side of the building. install new floor drain at laundry 5/8 drywall. dryer line, tile at the same location. electrical and plumbing upgrade along with other repairs, non-structural sub-floor & finish floor in the hallways. remodel in kind | $19,000 |
| Jan 14, 2020 | Expired or cancelled cancelled Oct 2020 | 2263 Sacramento St | install new fire sprinkler per nfpa 13r/ throughout the building new stand pipe. total 209 heads. (w/2" underground fire service)Details
install new fire sprinkler per nfpa 13r/ throughout the building new stand pipe. total 209 heads. (w/2" underground fire service) | $110,000 |
| Dec 20, 2019 | Never finaled issued Nov 2021, no final | 3627 Ortega St | revision to existing building pa #201810022005, adding elevation study per planning request identifying areas of the dwelling to be legalized. legalizing 190 sq ft addition at ground fl.Details
revision to existing building pa #201810022005, adding elevation study per planning request identifying areas of the dwelling to be legalized. legalizing 190 sq ft addition at ground fl. | |
| Nov 5, 2019 | Completed final sign-off Mar 2022 | 2263 Sacramento St | revision to 201810304558; mep upgrades, additional mep scope of work at 1st and 2nd fl, under arch permit 2018-1113-5638 & 2018-0404-5454. arch details for fire preotection of ducts and shafts.Details
revision to 201810304558; mep upgrades, additional mep scope of work at 1st and 2nd fl, under arch permit 2018-1113-5638 & 2018-0404-5454. arch details for fire preotection of ducts and shafts. | $30,000 |
| Oct 30, 2019 | Never finaled issued Oct 2019, no final | 2263 Sacramento St | dry rot repair at rear decks/stairs. add galv metal flashing/waterproofing. less than 50% of deck/stairs to be repaired in kindDetails
dry rot repair at rear decks/stairs. add galv metal flashing/waterproofing. less than 50% of deck/stairs to be repaired in kind | $5,000 |
| Oct 16, 2019 | Expired or cancelled cancelled Jan 2026 | 875 Post St | rev to pa# 201903014132: reconfiguration of proposed bathrooms, due to (e) conditions uncovered (colums), adding unit 102 to scope of work, change number of closets to be altered from 16 to 17 to include unit 102 workDetails
rev to pa# 201903014132: reconfiguration of proposed bathrooms, due to (e) conditions uncovered (colums), adding unit 102 to scope of work, change number of closets to be altered from 16 to 17 to include unit 102 work | |
| Sep 17, 2019 | Never finaled issued Sep 2019, no final | 3627 Ortega St | foundation repair and upgrade to comply with nov 201980781: rpelace foundating at pl (east) from grib line j to h as shown on drawings (9'-2.5").Details
foundation repair and upgrade to comply with nov 201980781: rpelace foundating at pl (east) from grib line j to h as shown on drawings (9'-2.5"). | $5,000 |
| May 17, 2019 | Completed final sign-off Mar 2022 | 2263 Sacramento St | remodel of extg blding. revision to app#201811135638 & 2019-0412-7847. for partition wall relocation. introduction of additional sheerwalls.Details
remodel of extg blding. revision to app#201811135638 & 2019-0412-7847. for partition wall relocation. introduction of additional sheerwalls. | $50,000 |
| Apr 12, 2019 | Completed final sign-off Mar 2022 | 2263 Sacramento St | revision to 201811135638 to include new slab to replace e crawl space framing at gr fl rear unit apt 2Details
revision to 201811135638 to include new slab to replace e crawl space framing at gr fl rear unit apt 2 | $10,000 |
| Mar 1, 2019 | Never finaled issued Oct 2019, no final | 875 Post St | conversion of closets into private bathrooms in 16 units (210, 211, 301, 302, 303, 304, 305, 315, 316, 401, 402, 403, 404, 405, 415, & 416). removal of 3 (e) public restrooms. no kitchens in guest rooms.Details
conversion of closets into private bathrooms in 16 units (210, 211, 301, 302, 303, 304, 305, 315, 316, 401, 402, 403, 404, 405, 415, & 416). removal of 3 (e) public restrooms. no kitchens in guest rooms. | $80,000 |
| Feb 19, 2019 | Completed final sign-off Sep 2021 | 2263 Sacramento St | window replacement in (e) openingsDetails
window replacement in (e) openings | $20,000 |
| Feb 8, 2019 | Never finaled issued Mar 2019, no final | 875 Post St | maintenance, alteration and rehabilitation of common floor restrooms. conversion of (e) closets into private restooms-rooms 207/208/209/312/313/314/412/413/414. maher n/a.Details
maintenance, alteration and rehabilitation of common floor restrooms. conversion of (e) closets into private restooms-rooms 207/208/209/312/313/314/412/413/414. maher n/a. | $70,000 |
| Nov 13, 2018 | Never finaled issued Dec 2018, no final | 2263 Sacramento St | 1st and 2nd flr interior remodel of 5 group housing sleeping rms and 1 apartment. add 1 kitchen, 1 common kitchen, 5 kitchenettes, 6 bathrooms.Details
1st and 2nd flr interior remodel of 5 group housing sleeping rms and 1 apartment. add 1 kitchen, 1 common kitchen, 5 kitchenettes, 6 bathrooms. | $150,000 |
| Oct 30, 2018 | Completed final sign-off Mar 2022 | 2263 Sacramento St | mep upgrade plans: mechanical, electrical and plumbing upgrades to entire building. ref pa #201804045454. maher naDetails
mep upgrade plans: mechanical, electrical and plumbing upgrades to entire building. ref pa #201804045454. maher na | $75,000 |
| Oct 2, 2018 | Expired or cancelled expired Nov 2025 | 3625 Ortega St | main floor unit legalization per ordinance 43-14. comply with notice of violation #201881531 and #201881031, items #6,7,8,9 and 10Details
main floor unit legalization per ordinance 43-14. comply with notice of violation #201881531 and #201881031, items #6,7,8,9 and 10 | $60,000 |
| Aug 8, 2018 | Completed final sign-off Jan 2019 | 2094 29th Av | cut and remove portion of (e) floor joists at 2nd flr balcony and replace with new. replace dryrot decorative railing at 2nd & 3rd flr balconyDetails
cut and remove portion of (e) floor joists at 2nd flr balcony and replace with new. replace dryrot decorative railing at 2nd & 3rd flr balcony | $3,000 |
| Jun 6, 2018 | Completed final sign-off Nov 2018 | 2094 29th Av | repair dryrot at overhang in front corner of house. remove and replace trim and frame around e windows. install new waterproof materials, 12 sq ft repair in kindDetails
repair dryrot at overhang in front corner of house. remove and replace trim and frame around e windows. install new waterproof materials, 12 sq ft repair in kind | $3,000 |
| Apr 19, 2018 | Completed final sign-off Mar 2022 | 2263 Sacramento St | foundation replacement and upgradeDetails
foundation replacement and upgrade | $50,000 |
| Apr 4, 2018 | Expired or cancelled expired Dec 2023 | 2263 Sacramento St | general remodel of 2 apartments (#1 & #2) and 10 group housing sleeping rooms. remodel 3 kitchens. add kitchenettes at 10 group housing sleeping rooms, add 19 bathrooms. alarm, sprinkler (nfpa-13), standpipe deferred.Details
general remodel of 2 apartments (#1 & #2) and 10 group housing sleeping rooms. remodel 3 kitchens. add kitchenettes at 10 group housing sleeping rooms, add 19 bathrooms. alarm, sprinkler (nfpa-13), standpipe deferred. | $350,000 |
| Dec 21, 2017 | Completed final sign-off Apr 2022 | 2263 Sacramento St | g/f -add 2 new group housing dwelling units and common kitchen to replace 2 garages. separate sprinkler permit. maher n/aDetails
g/f -add 2 new group housing dwelling units and common kitchen to replace 2 garages. separate sprinkler permit. maher n/a | $115,000 |
| Apr 23, 2015 | Completed final sign-off Aug 2015 | 732 Noriega St | remodeling of existing kitchen, remodeling of (e) master bathroom & bathroom/powder room.Details
remodeling of existing kitchen, remodeling of (e) master bathroom & bathroom/powder room. | $100,000 |
| Jul 7, 2006 | Expired or cancelled expired Dec 2010 | 1870 16th Av | r-chanal & h chanel installation for sound proof 1000 sqft. aprox. of floor area.Details
r-chanal & h chanel installation for sound proof 1000 sqft. aprox. of floor area. | $2,500 |
| Jul 7, 2006 | Never finaled issued Jul 2006, no final | 363 Arlington St | renew pa#200502246198 for final inspection.Details
renew pa#200502246198 for final inspection. | |
| Jan 19, 2006 | Completed final sign-off Feb 2006 | 62 Valley St | renew 200408171723 for final insp. replace shower to bath tub add 2 windows, replace all fixtures to new ones, door.Details
renew 200408171723 for final insp. replace shower to bath tub add 2 windows, replace all fixtures to new ones, door. | |
| Aug 17, 2004 | Expired or cancelled expired Oct 2005 | 62 Valley St | repl shower.add 2 windows.repl all fixtures,tile,door.block 1 dr to bedrooms.Details
repl shower.add 2 windows.repl all fixtures,tile,door.block 1 dr to bedrooms. | $6,000 |
| Sep 5, 2002 | Never finaled issued Sep 2002, no final | 96 Berkeley Wy | repair 2nd & 3rd deck floor & rainforce joists.inst new rails.Details
repair 2nd & 3rd deck floor & rainforce joists.inst new rails. | $3,500 |
| Aug 28, 2002 | Never finaled issued Aug 2002, no final | 916 Laguna St | apply feder pt filling on (e) structure, install new copper siding (plain)Details
apply feder pt filling on (e) structure, install new copper siding (plain) | $8,500 |