Carroll Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2016 to Aug 2026
- Last 24 months
- 5 permits filed
56 permits since 2000: 42 completed, 6 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2026 | Completed final sign-off Aug 2026 | 734 22nd Av | to comply with nov# 202535028: repair charred siding. replace broken window sash. repair and paint damaged dry wall.Details
to comply with nov# 202535028: repair charred siding. replace broken window sash. repair and paint damaged dry wall. | $1,500 |
| Mar 15, 2026 | In progress issued Sep 2026 | 51 Lopez Av | construct new exterior rear yard 2nd and 3rd floor balcony decks.Details
construct new exterior rear yard 2nd and 3rd floor balcony decks. | $35,000 |
| Dec 4, 2025 | In progress issued May 2026 | 198 Cresta Vista Dr | convert basement platform w/in (e) envelope (approved under pa 2021806293451) to be occupied as living basement - (n) stair to 2nd floor (interior), add bath; bar sink & fireplace (n) windows in (e) street; new 2nd floor closet & relocate w/d to 2nd floorDetails
convert basement platform w/in (e) envelope (approved under pa 2021806293451) to be occupied as living basement - (n) stair to 2nd floor (interior), add bath; bar sink & fireplace (n) windows in (e) street; new 2nd floor closet & relocate w/d to 2nd floor | $100,000 |
| Jan 22, 2025 | Completed final sign-off Dec 2025 | 45 Walnut St | revision 202408078157-voluntary seismic upgrade. new 129 sq ft theater room, converted from partial garage space. new windows, infill 3 windows at rear. new sliding door and windows at 3rd fl. all (n) work as a revision and in addition to permit 202408078157Details
revision 202408078157-voluntary seismic upgrade. new 129 sq ft theater room, converted from partial garage space. new windows, infill 3 windows at rear. new sliding door and windows at 3rd fl. all (n) work as a revision and in addition to permit 202408078157 | $48,000 |
| Nov 15, 2024 | In progress issued Jan 2025 | 20 Broadmoor Dr | removal of (e) enclosed rear stair and convert (e) window in dining room into french doors. (n) deck and stairs in rear.Details
removal of (e) enclosed rear stair and convert (e) window in dining room into french doors. (n) deck and stairs in rear. | $10,000 |
| Aug 23, 2024 | In progress filed Aug 2024, not yet issued | 30 Burnside Av | remodel of 541 sq ft area at 1/f including: family room, bedroom, bathroom, and adding a wet bar.Details
remodel of 541 sq ft area at 1/f including: family room, bedroom, bathroom, and adding a wet bar. | $75,000 |
| Aug 7, 2024 | Completed final sign-off Dec 2025 | 45 Walnut St | 1/f: remove (e) garage stairs, move garage wall, add new gym rm, reconfigure (e) bath. remove (e) back staircase, add new staircase to 2/f. 2/f: move (e) powder room, move (e) kitchen to open into new sitting room, new pantry. remove (e) back staircase to 1/f. 3/f: add new walk-in closet toDetails
1/f: remove (e) garage stairs, move garage wall, add new gym rm, reconfigure (e) bath. remove (e) back staircase, add new staircase to 2/f. 2/f: move (e) powder room, move (e) kitchen to open into new sitting room, new pantry. remove (e) back staircase to 1/f. 3/f: add new walk-in closet to | $185,000 |
| Jul 19, 2024 | Completed final sign-off Aug 2025 | 1831 17th Av | bathroom remodel in kind. new bathroom fixtures, tiles and paint. no moving walls. approx. 40 sq ft.Details
bathroom remodel in kind. new bathroom fixtures, tiles and paint. no moving walls. approx. 40 sq ft. | $20,000 |
| May 30, 2024 | In progress issued Sep 2024 | 20 Broadmoor Dr | kitchen remodel to remove (1) wall and remove window. new window.Details
kitchen remodel to remove (1) wall and remove window. new window. | $30,000 |
| Apr 10, 2024 | Completed final sign-off Jul 2024 | 31 Miraloma Dr | remodel of 2 (e) bathrooms in kind. new plumbing fixtures and electrical. non structuralDetails
remodel of 2 (e) bathrooms in kind. new plumbing fixtures and electrical. non structural | $55,000 |
| Nov 8, 2023 | Completed final sign-off Nov 2024 | 81 Glover St | remodel of (e) kitchen and dining room; no change to envelope of buildingDetails
remodel of (e) kitchen and dining room; no change to envelope of building | $75,000 |
| Oct 30, 2023 | Expired or cancelled suspend Mar 2024 | 420 Kirkham St | remove damaged stair threads and replace in kind- paint new and existing stair threads. less than 50%Details
remove damaged stair threads and replace in kind- paint new and existing stair threads. less than 50% | $15,000 |
| Aug 3, 2023 | In progress issued May 2024 | 51 Lopez Av | 1/f: alteration at gym.garage area 48 sq ft additional heated floor area. (n) bathroom. relocae washer/dryer under stair. small cooktop and refer at kitchenette.2nd fl: infill wall openings & replace door with window. remove juliette balcony. infill portion of wall at lounge for shear wall.Details
1/f: alteration at gym.garage area 48 sq ft additional heated floor area. (n) bathroom. relocae washer/dryer under stair. small cooktop and refer at kitchenette.2nd fl: infill wall openings & replace door with window. remove juliette balcony. infill portion of wall at lounge for shear wall. | $15,000 |
| May 22, 2023 | Expired or cancelled cancelled Jan 2026 | 73 Wood St | revision to bpa# 202305107481: change of address from 73 to 73-a wood st.Details
revision to bpa# 202305107481: change of address from 73 to 73-a wood st. | |
| May 10, 2023 | Completed final sign-off Sep 2023 | 73 Wood St | remodel of the existing kitchen. upgrade (e) electrical and plumbing.Details
remodel of the existing kitchen. upgrade (e) electrical and plumbing. | $30,000 |
| Mar 21, 2023 | Completed final sign-off Sep 2024 | 2550 Ulloa St | 1st fl: new adu. convert 168 sqft of garage to adu, remodel (e) bathrm & add kitchen, 2 new egress windows at bedrm, widen (e) entry door. 2nd fl: remodel (e) kitchen & bathrm in kind, add 1 full bathrm, remove (e) door to rear deck, patch stucco to match adjacent wall, remove (e) rear deck.Details
1st fl: new adu. convert 168 sqft of garage to adu, remodel (e) bathrm & add kitchen, 2 new egress windows at bedrm, widen (e) entry door. 2nd fl: remodel (e) kitchen & bathrm in kind, add 1 full bathrm, remove (e) door to rear deck, patch stucco to match adjacent wall, remove (e) rear deck. | $150,000 |
| Jan 13, 2023 | Completed final sign-off Aug 2023 | 107 22nd Av | revision to pa# 202211146426. add second half bathroom next to existing bathroom. replace door to main bathroom with wall. change door to bedroom to open outward.Details
revision to pa# 202211146426. add second half bathroom next to existing bathroom. replace door to main bathroom with wall. change door to bedroom to open outward. | $9,000 |
| Nov 14, 2022 | Completed final sign-off Aug 2023 | 107 22nd Av | remodel of (e) kitchen and bathroom.Details
remodel of (e) kitchen and bathroom. | $20,000 |
| Oct 20, 2022 | Completed final sign-off May 2023 | 1360 Fairfax Av | revision to pa 2022-0615-6446. new partitions in warehouse area.new storage and employee break room. new stair & door to side.Details
revision to pa 2022-0615-6446. new partitions in warehouse area.new storage and employee break room. new stair & door to side. | $2,000 |
| Sep 29, 2022 | Never finaled issued Oct 2022, no final | 734 22nd Av | revision to 202104098251; updated position of backyard stair and retaining wall moved from center to north sideDetails
revision to 202104098251; updated position of backyard stair and retaining wall moved from center to north side | |
| Jun 28, 2022 | Completed final sign-off Jan 2024 | 10 Chaves Av | change new windows proposed in permit #202204273111 to operate, non fire rated windows. window sizes to remain the same and will meet or exceed t-24 calculations called out in permit #202204273111. total 9 windows. not visible from street.Details
change new windows proposed in permit #202204273111 to operate, non fire rated windows. window sizes to remain the same and will meet or exceed t-24 calculations called out in permit #202204273111. total 9 windows. not visible from street. | |
| Jun 21, 2022 | Completed final sign-off Dec 2022 | 569 Diamond St | bathroom remodel, half bath in place of existing coat closet, laundry in place of bedroom closet.Details
bathroom remodel, half bath in place of existing coat closet, laundry in place of bedroom closet. | $25,000 |
| Jun 15, 2022 | Completed final sign-off Jun 2023 | 1360 Fairfax Av | t.i. with (n) demising wall and ada toilet for lease space s-3 occupancy. t.i. for canine enrichment with mep and (n) ada toilet for change of use from s-2 to b. (n) exterior roll up doors to access (e) side yard. repair (e) roof.Details
t.i. with (n) demising wall and ada toilet for lease space s-3 occupancy. t.i. for canine enrichment with mep and (n) ada toilet for change of use from s-2 to b. (n) exterior roll up doors to access (e) side yard. repair (e) roof. | $160,000 |
| Apr 27, 2022 | Completed final sign-off Jan 2024 | 10 Chaves Av | renovation to single family residence; relocate existing upper floor kitchen to lower floor; relocate existing staircase; drop floor level of rear half of lower level floor by 7.5". convert space to new family room; nook, kitchen and full bath. add new folding door systemDetails
renovation to single family residence; relocate existing upper floor kitchen to lower floor; relocate existing staircase; drop floor level of rear half of lower level floor by 7.5". convert space to new family room; nook, kitchen and full bath. add new folding door system | $235,000 |
| Feb 16, 2022 | Expired or cancelled cancelled Jan 2026 | 450 Kansas St | repaint exterior facade & porch, replace porch tile in-kind, replace entry gate in-kind, replace garage door in-kind, update exterior lightingDetails
repaint exterior facade & porch, replace porch tile in-kind, replace entry gate in-kind, replace garage door in-kind, update exterior lighting | $28,309 |
| Feb 11, 2022 | Completed final sign-off Nov 2022 | 1755 10th Av | revision to (e) permit pa 201912311127. dryrot repair at pl wall and interior stair replacement in kind.Details
revision to (e) permit pa 201912311127. dryrot repair at pl wall and interior stair replacement in kind. | |
| Feb 11, 2022 | Completed final sign-off Nov 2022 | 1757 10th Av | revision to an existing permit pa 202001303187. remove one water heater from the (e) permit.Details
revision to an existing permit pa 202001303187. remove one water heater from the (e) permit. | |
| Feb 9, 2022 | Never finaled issued May 2023, no final | 51 Lopez Av | 1st fl: interior remodel. (n) conditioned space for workout room. 2nd fl: interior remodel of kitchen, dining room, living room. 3rd fl: interior remodel of bedrooms. exterior: demo & replace entry steps. replace windows in kind.Details
1st fl: interior remodel. (n) conditioned space for workout room. 2nd fl: interior remodel of kitchen, dining room, living room. 3rd fl: interior remodel of bedrooms. exterior: demo & replace entry steps. replace windows in kind. | $385,000 |
| Jun 16, 2021 | Completed final sign-off Sep 2021 | 20 Broadmoor Dr | bathroom remodel, replace all plumbing and eclectrical fixtures. new tile and cabinetsDetails
bathroom remodel, replace all plumbing and eclectrical fixtures. new tile and cabinets | $20,000 |
| Jun 10, 2021 | Completed final sign-off Oct 2022 | 115 Jordan Av | remove existing rear deck, replace with new deck. install new windows and french door at rear facade of 1/fDetails
remove existing rear deck, replace with new deck. install new windows and french door at rear facade of 1/f | $42,000 |
| Apr 9, 2021 | Never finaled issued Apr 2022, no final | 734 22nd Av | lower level excavation, new foundation, and new interior stair. full interior renovation on both levels within (e) footprint. new exterior stucco and windows.Details
lower level excavation, new foundation, and new interior stair. full interior renovation on both levels within (e) footprint. new exterior stucco and windows. | $750,000 |
| Jan 28, 2021 | Completed final sign-off Nov 2022 | 1755 10th Av | revision to pa# 2019-1231-1127 - structural work onlyDetails
revision to pa# 2019-1231-1127 - structural work only | |
| Sep 11, 2020 | Completed final sign-off Oct 2022 | 115 Jordan Av | basement: gym converted to laundry, relocation/replacement of stairs to 1/f, 2/f relocation of bathroom, replacing laundry room, relocation of master suite & bath. revision to bpa#201912300867Details
basement: gym converted to laundry, relocation/replacement of stairs to 1/f, 2/f relocation of bathroom, replacing laundry room, relocation of master suite & bath. revision to bpa#201912300867 | $30,000 |
| Jan 30, 2020 | Completed final sign-off Nov 2022 | 1757 10th Av | new adu at first flr per ordinance 95-17. reference bldg (layout, title 24, mechanical) and structural under pa #2019-1231-1127. no construction under this permit; for adu legal documentation use only.Details
new adu at first flr per ordinance 95-17. reference bldg (layout, title 24, mechanical) and structural under pa #2019-1231-1127. no construction under this permit; for adu legal documentation use only. | |
| Jan 14, 2020 | Completed final sign-off Oct 2022 | 115 Jordan Av | voluntary structural upgrade and to extend existing basement.Details
voluntary structural upgrade and to extend existing basement. | $30,000 |
| Dec 31, 2019 | Completed final sign-off Nov 2022 | 1755 10th Av | interior remodel, new attic access stairs, new deck at rear, replace doors/windows. adu at ground floor under seperate permit. structural work under seperate permit.Details
interior remodel, new attic access stairs, new deck at rear, replace doors/windows. adu at ground floor under seperate permit. structural work under seperate permit. | $600,000 |
| Dec 30, 2019 | Completed final sign-off Oct 2022 | 115 Jordan Av | basement -remodel (e) space & small rear addition, (n) bathroom, (n) guest room, convert part of space to garage. 1st flr -kitchen remodel, relocate powder room. 2nd flr -remodel at baths & bedrooms, (n) mech, (n) electrical and plumbing systems. ref. pa# 20200111865.Details
basement -remodel (e) space & small rear addition, (n) bathroom, (n) guest room, convert part of space to garage. 1st flr -kitchen remodel, relocate powder room. 2nd flr -remodel at baths & bedrooms, (n) mech, (n) electrical and plumbing systems. ref. pa# 20200111865. | $380,000 |
| Aug 16, 2019 | Never finaled issued Aug 2019, no final | 9 Burlwood Dr | remodel of kitchen and bathroom, no exterior work no structural workDetails
remodel of kitchen and bathroom, no exterior work no structural work | $40,000 |
| Jul 24, 2019 | Completed final sign-off Aug 2020 | 1506 07th Av | revision to 201706280583. replace (e) vinyl windows with new wood windows. (n) 1 hour rated wall @ mechanical/laundry room @ 1st story. (n) opening @ 2nd story kitche. relcoate receptacles @ mechanical/laundry room. add light switches in living & dining room @ 2nd storyDetails
revision to 201706280583. replace (e) vinyl windows with new wood windows. (n) 1 hour rated wall @ mechanical/laundry room @ 1st story. (n) opening @ 2nd story kitche. relcoate receptacles @ mechanical/laundry room. add light switches in living & dining room @ 2nd story | $50,000 |
| May 29, 2019 | Completed final sign-off Feb 2020 | 3835 Ulloa St | renew bathroom area - add vanity & wc - 2 full bathrooms. remodel kitchen. (no change to rough plumbing). no change to exterior envelope/front/public right of way. repair roof in kind above entry. demo fire place.Details
renew bathroom area - add vanity & wc - 2 full bathrooms. remodel kitchen. (no change to rough plumbing). no change to exterior envelope/front/public right of way. repair roof in kind above entry. demo fire place. | $20,000 |
| Jan 22, 2019 | Completed final sign-off May 2019 | 401 Molimo Dr | repair of dry rot in front of house. patch stucco as needed. less than 50% of front stucco.Details
repair of dry rot in front of house. patch stucco as needed. less than 50% of front stucco. | $25,000 |
| Aug 29, 2018 | Completed final sign-off Dec 2018 | 218 Mallorca Wy | remodel (e) bathroom, no walls moved/removed/added/infilled, all (e) layouts to remain unchanged.Details
remodel (e) bathroom, no walls moved/removed/added/infilled, all (e) layouts to remain unchanged. | $20,000 |
| Jun 15, 2018 | Completed final sign-off Oct 2018 | 63 Mullen Av | remodel (2) existing bathrooms in-kind. install new fixtures and tilesDetails
remodel (2) existing bathrooms in-kind. install new fixtures and tiles | $25,000 |
| May 4, 2018 | Completed final sign-off Jun 2018 | 1911 42nd Av | remodel existing bathroom. no change to wall locationsDetails
remodel existing bathroom. no change to wall locations | $20,000 |
| May 2, 2018 | Completed final sign-off Feb 2019 | 420 Kirkham St | revision to pa 2017-1211-6150 reconfiguration of 1st story layout; structural work in effectDetails
revision to pa 2017-1211-6150 reconfiguration of 1st story layout; structural work in effect | $30,000 |
| Mar 21, 2018 | Completed final sign-off May 2018 | 20 Broadmoor Dr | remodel of (e) 1 bathroom replace all bathroom fixtures, no alteration of (e) wallDetails
remodel of (e) 1 bathroom replace all bathroom fixtures, no alteration of (e) wall | $20,000 |
| Mar 21, 2018 | Completed final sign-off Sep 2018 | 240 Gold Mine Dr | replace 7 existing windows & repair dry rot not visible from the street, no alteration of (e) openingDetails
replace 7 existing windows & repair dry rot not visible from the street, no alteration of (e) opening | $10,000 |
| Feb 22, 2018 | Completed final sign-off Jun 2018 | 418 Liberty St | replace posts and braces in kind at the (e) rear side deck due to significant dry-rot, less than 50% of deckDetails
replace posts and braces in kind at the (e) rear side deck due to significant dry-rot, less than 50% of deck | $5,000 |
| Jan 29, 2018 | Completed final sign-off Feb 2018 | 4349 25th St | pour new footing at front of property and holddowns and shearwallDetails
pour new footing at front of property and holddowns and shearwall | $8,000 |
| Dec 11, 2017 | Never finaled issued Apr 2018, no final | 420 Kirkham St | remodel (e) bathroom at 1st level. replacement of (e) skylights at storage. no change to building envelope and siteDetails
remodel (e) bathroom at 1st level. replacement of (e) skylights at storage. no change to building envelope and site | $17,000 |
| Sep 7, 2017 | Completed final sign-off Dec 2017 | 115 Jordan Av | remodel (1) full bathroom as is. replace all fixts. upgrade plumbing & electrical as needed. retile & paint.Details
remodel (1) full bathroom as is. replace all fixts. upgrade plumbing & electrical as needed. retile & paint. | $20,000 |
| Jul 10, 2017 | Completed final sign-off Oct 2017 | 414 Webster St | replace (e) egress stairs in-kind at the rear side due to significant rotting.Details
replace (e) egress stairs in-kind at the rear side due to significant rotting. | $15,000 |
| Jun 28, 2017 | Completed final sign-off Aug 2020 | 1506 07th Av | rear yard addition. remodel interior. room down addition. no change to building use. (5) bedroom, 3 1/2 bath. note: shoring and geo grout under a separate permit.Details
rear yard addition. remodel interior. room down addition. no change to building use. (5) bedroom, 3 1/2 bath. note: shoring and geo grout under a separate permit. | $400,000 |
| Jun 1, 2017 | Completed final sign-off Aug 2017 | 133 Maywood Dr | remodel (e) kitchen, upgrade plumbing & elec.Details
remodel (e) kitchen, upgrade plumbing & elec. | $37,000 |
| Mar 1, 2017 | Completed final sign-off Jun 2017 | 100 Moncada Wy | remodel of two second story bathrooms. no change of layout.Details
remodel of two second story bathrooms. no change of layout. | $45,000 |
| May 18, 2016 | Completed final sign-off Jun 2018 | 662 Lisbon St | horizontal addition. remodel & extend rear deck. new fire wall at property line (both sides). rear sliding door. replace wood floor framing of the back porch due to dry rot.Details
horizontal addition. remodel & extend rear deck. new fire wall at property line (both sides). rear sliding door. replace wood floor framing of the back porch due to dry rot. | $16,000 |