Carranza Group Lp
- Based in
- San Francisco
- On San Francisco permits
- Apr 2019 to Nov 2020
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 5, 2020 | Completed final sign-off Jan 2021 | 327 Cumberland St | amend to pa202008262671: replace (e) concrete stair with new concrete stair clad with stone. new handrail; all work w/in (e) encroachment. all work in row under seperate dpw submittal.Details
amend to pa202008262671: replace (e) concrete stair with new concrete stair clad with stone. new handrail; all work w/in (e) encroachment. all work in row under seperate dpw submittal. | $10,000 |
| Sep 12, 2020 | Completed final sign-off Jan 2021 | 327 Cumberland St | fence & attachment to existing site wall (approved pa #2017-1227-7511) at rear yard of residence.Details
fence & attachment to existing site wall (approved pa #2017-1227-7511) at rear yard of residence. | $5,000 |
| Aug 26, 2020 | Never finaled issued Aug 2020, no final | 327 Cumberland St | patch (e) front stairs. repair/retread as needed to rebuild stairs in-kind. 50% or lessDetails
patch (e) front stairs. repair/retread as needed to rebuild stairs in-kind. 50% or less | $15,000 |
| Nov 19, 2019 | Completed final sign-off Jan 2021 | 327 Cumberland St | revision to pa #2018-0525-0188: increase excavation @ ground level to create usable storage area. extend the pool @ south side w/in the buidling to align structural walls. remove lot line windows facing east side will be blocked by neighboring wall & relocate utility meter boxes per pg&e standardsDetails
revision to pa #2018-0525-0188: increase excavation @ ground level to create usable storage area. extend the pool @ south side w/in the buidling to align structural walls. remove lot line windows facing east side will be blocked by neighboring wall & relocate utility meter boxes per pg&e standards | |
| Jul 31, 2019 | Completed final sign-off Dec 2020 | 327 Cumberland St | design retaining wall at rear yard. ref shoring bpa# 201805038095Details
design retaining wall at rear yard. ref shoring bpa# 201805038095 | $50,000 |
| Apr 26, 2019 | Completed final sign-off Mar 2020 | 1384 Florida St | remove & replace damaged foundation and sub-par conditions occurred during water damage remediation strengthen bowing ceiling framing and add additional steel beams work required to complete. ref pa201903084811.Details
remove & replace damaged foundation and sub-par conditions occurred during water damage remediation strengthen bowing ceiling framing and add additional steel beams work required to complete. ref pa201903084811. | $75,000 |