Carlson Design Construct

Contractor license
827407
State license record
Based in
Irvine
On San Francisco permits
Dec 2005 to Apr 2008
Last 24 months
0 permits filed

3 permits since 2000: 3 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Apr 28, 2008Completed
final sign-off May 2009
200 Paul Avaddition of 1-2000 kw generator and belly tank. concrete pad for generator, add breaker (e) switch gear for generator. conduit and bus duct from generator to gear
Details
Permit
200804280768
Status
complete
Filed
Apr 28, 2008
Permit issued
Jul 22, 2008
Final sign-off
May 28, 2009
Declared cost
$680,000
Address
200 Paul Av

addition of 1-2000 kw generator and belly tank. concrete pad for generator, add breaker (e) switch gear for generator. conduit and bus duct from generator to gear

Open the permit page

$680,000
Sep 1, 2006Completed
final sign-off Sep 2006
200 Paul Avalter raised floor design from pedestals w/ 4" base plates anchored to concrete to 6" bases using adhesive w/ max stress ratio of 32.74%, change live load to 150 psf, resubmit design for equipment platform (steel) on roof, rev. to approved building pa#2005/12/15/0462
Details
Permit
200609011303
Status
complete
Filed
Sep 1, 2006
Permit issued
Sep 1, 2006
Final sign-off
Sep 14, 2006
Address
200 Paul Av

alter raised floor design from pedestals w/ 4" base plates anchored to concrete to 6" bases using adhesive w/ max stress ratio of 32.74%, change live load to 150 psf, resubmit design for equipment platform (steel) on roof, rev. to approved building pa#2005/12/15/0462

Open the permit page

Dec 15, 2005Completed
final sign-off Sep 2006
200 Paul Avbuild out of data storage suite with raised floor,libert floor cooling units,electrical room and roof coolers mounted on (e)steel platform.sprinkler system previous & fire alarm revision under seperate applications.
Details
Permit
200512150462
Status
complete
Filed
Dec 15, 2005
Permit issued
Apr 13, 2006
Final sign-off
Sep 14, 2006
Declared cost
$500,000
Address
200 Paul Av

build out of data storage suite with raised floor,libert floor cooling units,electrical room and roof coolers mounted on (e)steel platform.sprinkler system previous & fire alarm revision under seperate applications.

Open the permit page

$500,000