Carlos & Brothers Construction
- Based in
- Fremont
- On San Francisco permits
- May 2023 to Aug 2025
- Last 24 months
- 6 permits filed
12 permits since 2000: 7 completed, 4 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2025 | In progress issued Aug 2025 | 779 20th Av | 3rd flr - interior model: combine(e) sunroom(room 308), with (e) bedroom (306) to master bedroom w/full bathroom and walk in closet remodel (307) convert (e) utility room to (n) full bathroom, conver (e) kitchen and breakfast nook to media storage room and laundry room. convertDetails
3rd flr - interior model: combine(e) sunroom(room 308), with (e) bedroom (306) to master bedroom w/full bathroom and walk in closet remodel (307) convert (e) utility room to (n) full bathroom, conver (e) kitchen and breakfast nook to media storage room and laundry room. convert | $150,000 |
| Mar 24, 2025 | Completed final sign-off Sep 2025 | 1449 Hyde St | unit 2-6: revision to pa202502100027. adding bathroom window replacement on 5 units. not visible from st. windows in-kindDetails
unit 2-6: revision to pa202502100027. adding bathroom window replacement on 5 units. not visible from st. windows in-kind | $5,000 |
| Feb 10, 2025 | In progress issued Feb 2025 | 779 20th Av | kitchen and bathroom remodel units (779 and 782) no wall removal. in kind remodels, all fixtures to remain in the same location. each unit (779, 781) to have 2 bathrooms and 1 kitchen remodeled. total of 4 bathrooms and 2 kitchens. each bath approx 48 sq ft. each kitchen approx. 120 sq ft.Details
kitchen and bathroom remodel units (779 and 782) no wall removal. in kind remodels, all fixtures to remain in the same location. each unit (779, 781) to have 2 bathrooms and 1 kitchen remodeled. total of 4 bathrooms and 2 kitchens. each bath approx 48 sq ft. each kitchen approx. 120 sq ft. | $150,000 |
| Feb 10, 2025 | Completed final sign-off Sep 2025 | 1449 Hyde St | unit 2 - 6. revison to permit: 202412277455 adding 5 kitchens remodel. like for like. (units 2-6). each kitchen approx. 200 sq ft.Details
unit 2 - 6. revison to permit: 202412277455 adding 5 kitchens remodel. like for like. (units 2-6). each kitchen approx. 200 sq ft. | $160,000 |
| Dec 27, 2024 | Completed final sign-off Sep 2025 | 1449 Hyde St | bathroom remodel in units #2-6. (5 bathrooms total)Details
bathroom remodel in units #2-6. (5 bathrooms total) | $30,000 |
| Dec 12, 2024 | Completed final sign-off Jan 2025 | 2225 Leavenworth St | to revise pa 2024-0821-9161 to document the work was performed at 2225 & 2227 levenworthDetails
to revise pa 2024-0821-9161 to document the work was performed at 2225 & 2227 levenworth | |
| Oct 1, 2024 | Expired or cancelled cancelled Apr 2025 | 1922 Bush St | unit b: 1)one kitchen and one bath remodel. 2)plumbing and electrical.Details
unit b: 1)one kitchen and one bath remodel. 2)plumbing and electrical. | $25,000 |
| Aug 21, 2024 | Completed final sign-off Jan 2025 | 2223 Leavenworth St | (2)bathrooms remodel for 2223 and (2) bathrooms remodel for 2225 - (total of 4 bathrooms, no layout change) flooring, paint and electrical trim, replace light fixtures through all. replace light fixtures in units 23 and 25Details
(2)bathrooms remodel for 2223 and (2) bathrooms remodel for 2225 - (total of 4 bathrooms, no layout change) flooring, paint and electrical trim, replace light fixtures through all. replace light fixtures in units 23 and 25 | $60,000 |
| Aug 21, 2024 | Completed final sign-off Sep 2024 | 1926 Bush St | unit b: replace cabinets- replace elect trim- throughout/ fixtures. flooring, paint and retrofit windows. (all except living. no front windows total 5 windows) bathroom- floor tile. no removal of wallsDetails
unit b: replace cabinets- replace elect trim- throughout/ fixtures. flooring, paint and retrofit windows. (all except living. no front windows total 5 windows) bathroom- floor tile. no removal of walls | $38,000 |
| Aug 9, 2024 | In progress filed Aug 2024, not yet issued | 1922 Bush St | repair existing exterior stair at rear yardDetails
repair existing exterior stair at rear yard | $8,000 |
| Jul 31, 2024 | Completed final sign-off Aug 2024 | 1922 Bush St | unit a: replace kitchen cabinets; replace electrical trim/ fixtures throughout; replace flooring, paint and retrofit windows (all windows except living room); replace bathroom floor tiles. (no front windows, total 5 windows)Details
unit a: replace kitchen cabinets; replace electrical trim/ fixtures throughout; replace flooring, paint and retrofit windows (all windows except living room); replace bathroom floor tiles. (no front windows, total 5 windows) | $38,675 |
| May 25, 2023 | In progress issued Nov 2024 | 2527 25th St | convert existing ground level non-conforming unit and garage to 2-bedroom/ 1-bath adu: 708 sqft, per ordinance # 162-16. existing non-conforming adu will be added per government code section 65852.2.Details
convert existing ground level non-conforming unit and garage to 2-bedroom/ 1-bath adu: 708 sqft, per ordinance # 162-16. existing non-conforming adu will be added per government code section 65852.2. | $50,000 |