Cark Construction
- Based in
- Novato
- On San Francisco permits
- Dec 2006 to Nov 2014
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 21, 2014 | Completed final sign-off Nov 2020 | 1632 Broderick St | convert existing space at 1/f to conditioned living space, add bedroom and replacing (e) winder stairs. work is in addition to pa# 201406209011 that added a bath at 1/fDetails
convert existing space at 1/f to conditioned living space, add bedroom and replacing (e) winder stairs. work is in addition to pa# 201406209011 that added a bath at 1/f | $20,000 |
| Oct 31, 2014 | Never finaled issued Oct 2014, no final | 3465 Pierce St | voluntary soft story strengthening. n/a maher ordinanceDetails
voluntary soft story strengthening. n/a maher ordinance | $35,000 |
| Mar 26, 2008 | Completed final sign-off Jun 2008 | 510 Jersey St | repair dry rot damage to back stairs. less than 50% in kind repair.Details
repair dry rot damage to back stairs. less than 50% in kind repair. | $3,500 |
| Jan 4, 2007 | Completed final sign-off Jan 2008 | 579 Moultrie St | remodelng of existing two story over garage dwellings new foundation partial and remodeling at lower floor level. reworking bathroom new bath fixtures and tile work and remodeling part of kitchen area at main floor replacing received second means of egress at rear.Details
remodelng of existing two story over garage dwellings new foundation partial and remodeling at lower floor level. reworking bathroom new bath fixtures and tile work and remodeling part of kitchen area at main floor replacing received second means of egress at rear. | $35,000 |
| Dec 20, 2006 | Completed final sign-off Apr 2009 | 60 Teddy Av | to erect a new 2 story single family dwelling unit.Details
to erect a new 2 story single family dwelling unit. | $300,000 |
| Dec 20, 2006 | Completed final sign-off Apr 2009 | 58 Teddy Av | to erect a new 2 story, single family dwelling building.Details
to erect a new 2 story, single family dwelling building. | $300,000 |