Capron Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Jan 2015
- Last 24 months
- 0 permits filed
15 permits since 2000: 13 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2015 | Completed final sign-off Feb 2018 | 542 Pennsylvania Av | hori & vert addition. remodel (e) struct (n) construction to include pop-out @ rear & addition of master suite @ a (n) 3rd fl. footprint of bldg to remain unchanged. front facade material to be changed from (e) stucco to fiber reinforced concrete panels.Details
hori & vert addition. remodel (e) struct (n) construction to include pop-out @ rear & addition of master suite @ a (n) 3rd fl. footprint of bldg to remain unchanged. front facade material to be changed from (e) stucco to fiber reinforced concrete panels. | $600,000 |
| Apr 4, 2014 | Completed final sign-off Aug 2014 | 224 Bowdoin St | kitchen renovation with new double hung window to replace existing in kind. new appliances, cabs, counters, sink/faucet, dishwasher and flooringDetails
kitchen renovation with new double hung window to replace existing in kind. new appliances, cabs, counters, sink/faucet, dishwasher and flooring | $15,000 |
| Oct 28, 2013 | Completed final sign-off Jan 2014 | 4425 Balboa St | unit 5: remove old cainets and replace with new ones at kitchen onlyDetails
unit 5: remove old cainets and replace with new ones at kitchen only | $10,000 |
| May 3, 2012 | Completed final sign-off Aug 2012 | 95 Duboce Av | interior kitchen remodel, no new habitable space , no changes to envelope.Details
interior kitchen remodel, no new habitable space , no changes to envelope. | $50,000 |
| Apr 7, 2011 | Completed final sign-off Apr 2012 | 1216 19th St | replace windows in-kind; front & rear facades. replace (e) shingles w/ plaster finish; front & rear.Details
replace windows in-kind; front & rear facades. replace (e) shingles w/ plaster finish; front & rear. | $52,000 |
| Feb 18, 2011 | Completed final sign-off Dec 2011 | 1909 Alemany Bl | kitchen remodel. plumbing/gas stay in place. new cabinets. add gfci outlets and high efficacy lighting. replace uninsulated winode in kind. new flooring. new cased opening to dining room and new pocket doorDetails
kitchen remodel. plumbing/gas stay in place. new cabinets. add gfci outlets and high efficacy lighting. replace uninsulated winode in kind. new flooring. new cased opening to dining room and new pocket door | $10,000 |
| Dec 30, 2010 | Completed final sign-off Apr 2012 | 1216 19th St | interior renovation. ground fl: remodel(e)full bath, widen interior stair. 2nd fl: remodel kitchen. 3rd fl: relocate full bath, add (n) laundryDetails
interior renovation. ground fl: remodel(e)full bath, widen interior stair. 2nd fl: remodel kitchen. 3rd fl: relocate full bath, add (n) laundry | $135,000 |
| Feb 10, 2010 | Completed final sign-off May 2010 | 63 Albion St | work in unit 63 albion street only. replacing kitchen cabinets and appliances, new flooring. remodel only.Details
work in unit 63 albion street only. replacing kitchen cabinets and appliances, new flooring. remodel only. | $12,000 |
| Jul 2, 2008 | Completed final sign-off Dec 2008 | 406 Mississippi St | replace (e) rear yard fences with new fences, short retaining wall, new south fence h: 9'-10" to 5'-0", new north fence h: 7'-5" to 7'-10"Details
replace (e) rear yard fences with new fences, short retaining wall, new south fence h: 9'-10" to 5'-0", new north fence h: 7'-5" to 7'-10" | $17,000 |
| Dec 4, 2007 | Completed final sign-off Dec 2007 | 225 Dolores St | revision to previously approved app 200711148043. structural changes in response to existing field conditions. revise footing height and rebar detail. relocate doorway to coordinate with footing detail.Details
revision to previously approved app 200711148043. structural changes in response to existing field conditions. revise footing height and rebar detail. relocate doorway to coordinate with footing detail. | $11,885 |
| Nov 14, 2007 | Completed final sign-off Dec 2007 | 225 Dolores St | voluntary structural upgrade to an existing garage. construction of new wood-framed shear walls with new footings. infill between existing wood posts.Details
voluntary structural upgrade to an existing garage. construction of new wood-framed shear walls with new footings. infill between existing wood posts. | $11,885 |
| Mar 10, 2006 | Expired or cancelled expired Mar 2010 | 194 Guerrero St | replace in kind store front windows. correct dry rot posts between & provide positive connection to (e) post.Details
replace in kind store front windows. correct dry rot posts between & provide positive connection to (e) post. | $4,500 |
| Jan 17, 2002 | Expired or cancelled expired Jun 2004 | 206 Banks St | rev. to appl#200107022851 details for dormer included, rebuild rear structureDetails
rev. to appl#200107022851 details for dormer included, rebuild rear structure | $15,000 |
| Jan 7, 2002 | Completed final sign-off Feb 2002 | 448 Mississippi St | renew appl#9906269s, 200009211220, 200103265219, 200111012325 for final inspectionDetails
renew appl#9906269s, 200009211220, 200103265219, 200111012325 for final inspection | |
| Jun 19, 2000 | Completed final sign-off Jul 2000 | 255 Connecticut St | deck repair replace rotten areas, bring current picket spacing to c odeDetails
deck repair replace rotten areas, bring current picket spacing to c ode | $5,000 |