Camarina Construction Corp
- Based in
- San Francisco
- On San Francisco permits
- Sep 2002 to Jan 2026
- Last 24 months
- 4 permits filed
68 permits since 2000: 58 completed, 2 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 28, 2026 | Completed final sign-off Jun 2026 | 1450 Washington St | unit #7: renovate kitchen & bathroom in kind. plumbing and electrical as needed. no shower panDetails
unit #7: renovate kitchen & bathroom in kind. plumbing and electrical as needed. no shower pan | $45,000 |
| Jan 7, 2026 | In progress issued Jan 2026 | 2525 22nd Av | revision to pa #202506259388: new wall to align with existing wall at s.w. corner, part of horizontal expansion/change walls at interior stair to kitchen/new slider patio door at n-w patio/change windows 0034 004 size(smaller) changes in layout of new bath 1 & 2, furnace & water, heater moved intoDetails
revision to pa #202506259388: new wall to align with existing wall at s.w. corner, part of horizontal expansion/change walls at interior stair to kitchen/new slider patio door at n-w patio/change windows 0034 004 size(smaller) changes in layout of new bath 1 & 2, furnace & water, heater moved into | |
| Jun 25, 2025 | In progress issued Aug 2025 | 2525 22nd Av | lower floor garage level: except for garage space (room 001). interior remodel of lowered area as shown. add south west corner expansion of the en-suite with the new deck above. acess to deck with new fren ch door in place of the window.Details
lower floor garage level: except for garage space (room 001). interior remodel of lowered area as shown. add south west corner expansion of the en-suite with the new deck above. acess to deck with new fren ch door in place of the window. | $280,000 |
| Apr 8, 2025 | Completed final sign-off Nov 2025 | 1550 Hayes St | unit 3- remodel kitchen and bathroom reconfigure bath and kitchen non bearing walls and add closet in bedroom. update electrical and plumbingDetails
unit 3- remodel kitchen and bathroom reconfigure bath and kitchen non bearing walls and add closet in bedroom. update electrical and plumbing | $40,000 |
| Feb 28, 2022 | Completed final sign-off Jul 2022 | 1550 Hayes St | unit 8: remodel kitchen and bath. replace in kind.Details
unit 8: remodel kitchen and bath. replace in kind. | $25,000 |
| Feb 13, 2020 | Completed final sign-off Apr 2020 | 1456 Jones St | apt 26: remodel bathroom & kitchen in-kind.Details
apt 26: remodel bathroom & kitchen in-kind. | $25,000 |
| Apr 11, 2019 | Completed final sign-off Jan 2020 | 335 Green St | rear parking deck repair less than 50%. not visible from the street. and new waterproofing and aslphalt surface throughout.Details
rear parking deck repair less than 50%. not visible from the street. and new waterproofing and aslphalt surface throughout. | $5,000 |
| Mar 6, 2018 | Completed final sign-off Sep 2018 | 1183 Jackson St | remodel kitchen & bathroomDetails
remodel kitchen & bathroom | $25,000 |
| Feb 2, 2018 | Completed final sign-off Sep 2018 | 1550 Hayes St | apt #6: remodel kitchen and bathroom.Details
apt #6: remodel kitchen and bathroom. | $25,000 |
| Dec 7, 2017 | Completed final sign-off Apr 2018 | 70 San Pablo Av | remodel bathroom on main floor & interior bedroom remodel.Details
remodel bathroom on main floor & interior bedroom remodel. | $15,000 |
| Dec 7, 2017 | Completed final sign-off Mar 2018 | 1456 Jones St | #1 -remodel kitchen & bathroom. maher naDetails
#1 -remodel kitchen & bathroom. maher na | $15,000 |
| Sep 14, 2017 | Expired or cancelled cancelled Apr 2026 | 335 Green St | convert ground flr storage spaces into (1) new unit. entire first floor to be sprinklered (under seperate permit). entire ground flr ceiling assembly to be upgraded to a 1-hour rated assembly.Details
convert ground flr storage spaces into (1) new unit. entire first floor to be sprinklered (under seperate permit). entire ground flr ceiling assembly to be upgraded to a 1-hour rated assembly. | $25,000 |
| Oct 17, 2016 | Completed final sign-off Feb 2018 | 1456 Jones St | comply with this violation ces 201641867. compliance w/ mandatory seismic retrofit program 2013 sfbc sec 34b 2012 iebc appx a-4.Details
comply with this violation ces 201641867. compliance w/ mandatory seismic retrofit program 2013 sfbc sec 34b 2012 iebc appx a-4. | $120,000 |
| Feb 16, 2016 | Expired or cancelled cancelled Apr 2026 | 1440 Washington St | (2) new dwelling units per ord no. 30-15. 1 bedroom, 1 bath at (e) shell space at rear of bldg. soft story permit#201510089204. ** maher: disburbance of at least 50 cu. yd. of soil. route to dph **Details
(2) new dwelling units per ord no. 30-15. 1 bedroom, 1 bath at (e) shell space at rear of bldg. soft story permit#201510089204. ** maher: disburbance of at least 50 cu. yd. of soil. route to dph ** | $50,000 |
| Oct 8, 2015 | Completed final sign-off Dec 2016 | 1440 Washington St | compliance w/mandatory seismic retrofit program 2013 sfbc sec 34b &2012 iebc appendix a-4. n/a for maher ordinance no. 155-13.Details
compliance w/mandatory seismic retrofit program 2013 sfbc sec 34b &2012 iebc appendix a-4. n/a for maher ordinance no. 155-13. | $60,000 |
| Oct 8, 2015 | Completed final sign-off Jun 2016 | 345 Green St | compliance w/mandatory seismic retrofit program 2013 sfbc sec 34b &2012 iebc appendix a-4.Details
compliance w/mandatory seismic retrofit program 2013 sfbc sec 34b &2012 iebc appendix a-4. | $10,000 |
| Jul 13, 2015 | Completed final sign-off Jan 2016 | 110 Everglade Dr | revision to pa#201411030553 for replacement of damaged stucco @ east & south exterior walls (rightside & rear walls).Details
revision to pa#201411030553 for replacement of damaged stucco @ east & south exterior walls (rightside & rear walls). | $10,000 |
| Nov 3, 2014 | Completed final sign-off Jan 2016 | 110 Everglade Dr | remodeling of (e) bedroom, bath, & family @ 1st flr, new laundry rm & hallway @ 1st flr, re-design of interior stairs, voluntary strengthening to 1st flrDetails
remodeling of (e) bedroom, bath, & family @ 1st flr, new laundry rm & hallway @ 1st flr, re-design of interior stairs, voluntary strengthening to 1st flr | $55,000 |
| Oct 9, 2014 | Completed final sign-off Jan 2015 | 1550 Hayes St | compliance with mandatory seismic retrofit program for soft story bldg per sfbc chapter 34b, 2012 iebc appendix a-4.Details
compliance with mandatory seismic retrofit program for soft story bldg per sfbc chapter 34b, 2012 iebc appendix a-4. | $15,000 |
| Jul 8, 2014 | Completed final sign-off Apr 2015 | 101 States St | compliance with mandatory soft story seismic retrofit program. retrofit per 2012 iebc appendix a-4Details
compliance with mandatory soft story seismic retrofit program. retrofit per 2012 iebc appendix a-4 | $5,000 |
| Apr 16, 2014 | Completed final sign-off Jun 2014 | 1456 Jones St | unit 33: remodel kitchen - replace cabinetes & wall surfaces, new appliances and connections. all new lighting small comply w/cec/50/<. compliance with ordinance no 155-13 not required.Details
unit 33: remodel kitchen - replace cabinetes & wall surfaces, new appliances and connections. all new lighting small comply w/cec/50/<. compliance with ordinance no 155-13 not required. | $5,000 |
| Feb 18, 2014 | Completed final sign-off May 2014 | 1474 33rd Av | remodel kitchen per plans on 2nd floor.Details
remodel kitchen per plans on 2nd floor. | $20,000 |
| Feb 18, 2014 | Completed final sign-off Jun 2014 | 2148 15th Av | revision to app#201401156362. replace skylight, install pocket door, install new doors per plans.remodel of 2 bathroomsDetails
revision to app#201401156362. replace skylight, install pocket door, install new doors per plans.remodel of 2 bathrooms | |
| Jan 15, 2014 | Completed final sign-off Jun 2014 | 2148 15th Av | remodel two bathrooms, repair misc. dry rot repair both bathrooms. no change of walls, window and door.Details
remodel two bathrooms, repair misc. dry rot repair both bathrooms. no change of walls, window and door. | $30,000 |
| Jan 15, 2014 | Completed final sign-off Dec 2014 | 405 Country Club Dr | replace two in-kind windows in front of house. exisitng windows are wood casement-fixed-casement pattern; the casements are diveded in a three lite pattern with true divided lites. the proposed are wood w/aluminum clad exterior, with same pattern as existing; low eDetails
replace two in-kind windows in front of house. exisitng windows are wood casement-fixed-casement pattern; the casements are diveded in a three lite pattern with true divided lites. the proposed are wood w/aluminum clad exterior, with same pattern as existing; low e | $2,500 |
| Jun 6, 2013 | Completed final sign-off Feb 2014 | 2170 Vallejo St | unit #202: kitchen renovation, new lighting to be over 50% high efficacy, widen opening at (e) non bearing wall. replace 1 sideyard window with new aluminum clad window in (e) openingDetails
unit #202: kitchen renovation, new lighting to be over 50% high efficacy, widen opening at (e) non bearing wall. replace 1 sideyard window with new aluminum clad window in (e) opening | $9,100 |
| Apr 29, 2013 | Completed final sign-off Jun 2013 | 345 Green St | unit #1 & 3-revision to pa# 2013-0415-4541-create opening in non load bearing wall in 347 green st #1 & create opening in bearing wall in 345 green st #3, also install 2 replacement windows & 1 nail on window. repair stucco, approx 210 sq ft. no work visible from streetDetails
unit #1 & 3-revision to pa# 2013-0415-4541-create opening in non load bearing wall in 347 green st #1 & create opening in bearing wall in 345 green st #3, also install 2 replacement windows & 1 nail on window. repair stucco, approx 210 sq ft. no work visible from street | |
| Apr 15, 2013 | Completed final sign-off Jun 2013 | 345 Green St | remodel kitchen & bathroom in kind. repair dryrot in bathrooms. 345 green st., unit 3 & 347 green st., unit 1. lighting must comply w/cec 150 (k).Details
remodel kitchen & bathroom in kind. repair dryrot in bathrooms. 345 green st., unit 3 & 347 green st., unit 1. lighting must comply w/cec 150 (k). | $30,000 |
| Mar 11, 2013 | Completed final sign-off Mar 2016 | 160 San Pablo Av | enclosing of (e) rear balcony at 1st fl (street level) creation of habitable conditioned space, denoted as "living annex" 271 s.f.Details
enclosing of (e) rear balcony at 1st fl (street level) creation of habitable conditioned space, denoted as "living annex" 271 s.f. | $25,000 |
| Oct 10, 2012 | Never finaled issued Oct 2012, no final | 240 Drake St | replace 3 windows, same location & size on side. not visable from street and repair dryrot as needed around windows.Details
replace 3 windows, same location & size on side. not visable from street and repair dryrot as needed around windows. | $2,000 |
| Jul 16, 2012 | Completed final sign-off Dec 2012 | 2955 26th St | revision to appl #2010.1123.5526 to fix discrepanies & omission bet arch & engine: revised demolition & replacement of (e) walls in same locations to perform structural work includ foundation & shear walls. remove & replace rear stair & facade to perform foundation replacement & structural upgrades.Details
revision to appl #2010.1123.5526 to fix discrepanies & omission bet arch & engine: revised demolition & replacement of (e) walls in same locations to perform structural work includ foundation & shear walls. remove & replace rear stair & facade to perform foundation replacement & structural upgrades. | |
| May 25, 2012 | Completed final sign-off Dec 2012 | 2955 26th St | revision to application #201011235526-r1. foundation replacement & in-kind rear stair replacement.Details
revision to application #201011235526-r1. foundation replacement & in-kind rear stair replacement. | |
| Jan 10, 2012 | Expired or cancelled cancelled Oct 2012 | 3633 Ulloa St | replace two (2) rear windows. same size and location u=.40Details
replace two (2) rear windows. same size and location u=.40 | $1,500 |
| Sep 26, 2011 | Completed final sign-off Nov 2011 | 1440 Washington St | unit #3. remodel kitchen & bathroom. comply his 201159168. no doors, windows, walls under this permit. comply w/ co alarms per cbc 2010 section 420.4Details
unit #3. remodel kitchen & bathroom. comply his 201159168. no doors, windows, walls under this permit. comply w/ co alarms per cbc 2010 section 420.4 | $20,000 |
| Mar 28, 2011 | Completed final sign-off Jun 2011 | 1442 14th Av | deck and stair replacement at rearDetails
deck and stair replacement at rear | $15,000 |
| Feb 15, 2011 | Completed final sign-off Mar 2011 | 110 Everglade Dr | remodel bathroom in kindDetails
remodel bathroom in kind | $8,000 |
| Nov 23, 2010 | Completed final sign-off Dec 2012 | 2955 26th St | comply with nov# 200565040. remove illegal unit per plans. legalize rooms & bathroom @ ground floor. interior remodel & horizontal addition @ new corner of building.Details
comply with nov# 200565040. remove illegal unit per plans. legalize rooms & bathroom @ ground floor. interior remodel & horizontal addition @ new corner of building. | $75,000 |
| Nov 22, 2010 | Completed final sign-off Dec 2010 | 3522 Taraval St | to obtain final inspection for work approved under pa #200008117649. all work is complete.Details
to obtain final inspection for work approved under pa #200008117649. all work is complete. | |
| Aug 23, 2010 | Completed final sign-off Dec 2010 | 4545 Ocean Av | remodel two bathrooms in kind (split level), provide h.e. lights or "manual on" occupancy sensor.Details
remodel two bathrooms in kind (split level), provide h.e. lights or "manual on" occupancy sensor. | $15,000 |
| Jul 30, 2010 | Completed final sign-off Mar 2012 | 2520 22nd Av | new landing and steps to adjacent grade from rear yard facing master bedroom. new sliding glass doorDetails
new landing and steps to adjacent grade from rear yard facing master bedroom. new sliding glass door | $2,500 |
| Jun 10, 2010 | Completed final sign-off Mar 2012 | 2520 22nd Av | replace 7-windows in front of house; anderson wood vinyl clad casement & 1-slider.Details
replace 7-windows in front of house; anderson wood vinyl clad casement & 1-slider. | $6,000 |
| May 18, 2010 | Completed final sign-off May 2010 | 2530 33rd Av | repair fence : reattach broken post to retaining wall & replace rotten wood at bottom of fence to dirt at rear yard at right side property line. not visible from the streetDetails
repair fence : reattach broken post to retaining wall & replace rotten wood at bottom of fence to dirt at rear yard at right side property line. not visible from the street | $1,000 |
| Nov 6, 2009 | Completed final sign-off Dec 2009 | 101 States St | unit #3-repair living room from water damage, install new lighting while open & dry wall & hardwood floor, no new walls, dry wall replacement in living room ceiling (approx 412sq ft). skim coat entire room & install flooring. provide he per title 24Details
unit #3-repair living room from water damage, install new lighting while open & dry wall & hardwood floor, no new walls, dry wall replacement in living room ceiling (approx 412sq ft). skim coat entire room & install flooring. provide he per title 24 | $5,000 |
| Mar 17, 2009 | Never finaled issued Mar 2009, no final | 3891 25th St | to obtain final inspction for work approved under pa#200801182798. all work has been completed.Details
to obtain final inspction for work approved under pa#200801182798. all work has been completed. | |
| Mar 17, 2009 | Never finaled issued Mar 2009, no final | 3891 25th St | to obtain final inspection for work approved under pa # 200712311593. all work has been completed.Details
to obtain final inspection for work approved under pa # 200712311593. all work has been completed. | |
| Feb 19, 2009 | Completed final sign-off Apr 2009 | 4077 Cesar Chavez St | demo & replace deck, stairs & related landing in-kind at rear.Details
demo & replace deck, stairs & related landing in-kind at rear. | $10,000 |
| Feb 6, 2009 | Completed final sign-off Apr 2009 | 38 Springfield Dr | revision to pa #200901291057, for bathroom remodel. rearrange toilet and shower tub.Details
revision to pa #200901291057, for bathroom remodel. rearrange toilet and shower tub. | |
| Jan 29, 2009 | Completed final sign-off Apr 2009 | 38 Springfield Dr | retile, replace bathroom vanity & paint. size: 5'x8', 40 sq.ft.Details
retile, replace bathroom vanity & paint. size: 5'x8', 40 sq.ft. | $2,500 |
| Jun 2, 2008 | Completed final sign-off Aug 2008 | 469 Day St | retile bathroom, replace vanity cabinet and paint.Details
retile bathroom, replace vanity cabinet and paint. | $4,000 |
| Feb 19, 2008 | Completed final sign-off Aug 2008 | 469 Day St | replace 4 (off street) windows in kind. not visable from the street.Details
replace 4 (off street) windows in kind. not visable from the street. | $4,000 |
| Feb 19, 2008 | Completed final sign-off Aug 2008 | 405 Country Club Dr | replace kitchen cabinets, floor and fixturesDetails
replace kitchen cabinets, floor and fixtures | $15,000 |
| Aug 20, 2007 | Completed final sign-off Oct 2007 | 469 Day St | replace three windows & retile on bath can't see from street.Details
replace three windows & retile on bath can't see from street. | $5,000 |
| Dec 5, 2006 | Completed final sign-off Jan 2007 | 469 Day St | replace four windows and approx. 150 sq. ft. of t-111 siding to install windows, no vissible from street, in kind.Details
replace four windows and approx. 150 sq. ft. of t-111 siding to install windows, no vissible from street, in kind. | $4,000 |
| Sep 5, 2006 | Completed final sign-off Nov 2007 | 2520 22nd Av | enlarge garage door, move to side (e) front stairs. add 2 stories at rear of bldg.Details
enlarge garage door, move to side (e) front stairs. add 2 stories at rear of bldg. | $80,000 |
| Oct 20, 2005 | Completed final sign-off Feb 2006 | 469 Day St | remove front steps, install new granite steps, less than 50%. lower landing, repair framing as needed. replace 13 windows, wood wndws w/ like kind. repair dryrt siding as needed. reroof 1 lightwell and membrane. steps with hot tar.dbl door at bottom entrance and paint front of houseDetails
remove front steps, install new granite steps, less than 50%. lower landing, repair framing as needed. replace 13 windows, wood wndws w/ like kind. repair dryrt siding as needed. reroof 1 lightwell and membrane. steps with hot tar.dbl door at bottom entrance and paint front of house | $13,000 |
| Mar 7, 2005 | Completed final sign-off Jan 2006 | 2170 Vallejo St | reinforce floor for added weight of dining table, smoke detection per code.Details
reinforce floor for added weight of dining table, smoke detection per code. | $2,500 |
| Jan 5, 2005 | Completed final sign-off Apr 2005 | 1 Lyndhurst Dr | remodel kchn move doorway/nonbearing /replace kchn cbnts, cntrtop,flooringDetails
remodel kchn move doorway/nonbearing /replace kchn cbnts, cntrtop,flooring | $20,000 |
| Dec 23, 2004 | Never finaled issued Dec 2004, no final | 2759 41st Av | replace 12 windows at the front of house with anderson wood windows.Details
replace 12 windows at the front of house with anderson wood windows. | $6,000 |
| Dec 23, 2004 | Completed final sign-off Jan 2006 | 2170 Vallejo St | remodel kitchen & two baths, install new closet doors, upgrade elect panel & install new lights & plDetails
remodel kitchen & two baths, install new closet doors, upgrade elect panel & install new lights & pl | $45,000 |
| Nov 17, 2004 | Never finaled issued Nov 2004, no final | 405 Country Club Dr | replace 5 windows on side of building- two bedrms, two bathrms, & one kitchen, min 3'-0" from prop lDetails
replace 5 windows on side of building- two bedrms, two bathrms, & one kitchen, min 3'-0" from prop l | $1,750 |
| Sep 20, 2004 | Completed final sign-off Jan 2006 | 2170 Vallejo St | install washer & dryer in closet & install new bi-fold door. move back of closet to accomodate stuckDetails
install washer & dryer in closet & install new bi-fold door. move back of closet to accomodate stuck | $5,000 |
| Sep 20, 2004 | Completed final sign-off Apr 2005 | 2170 Vallejo St | remodel kitchen as needed, countertop,stove. remove non bearing wall btwn kitchen/dining area. relocDetails
remodel kitchen as needed, countertop,stove. remove non bearing wall btwn kitchen/dining area. reloc | $20,000 |
| Aug 10, 2004 | Completed final sign-off Aug 2004 | 141 Juanita Wy | repair misc. dryrot at front of bldg next to front doorDetails
repair misc. dryrot at front of bldg next to front door | $3,000 |
| Aug 22, 2003 | Completed final sign-off Sep 2003 | 180 San Pablo Av | replace 2 windows on side of house in kindDetails
replace 2 windows on side of house in kind | $2,500 |
| May 19, 2003 | Completed final sign-off Aug 2003 | 1550 Hayes St | remove wall covering from walls & install foundation bolts, install 1/2 plywood on walls & 5/8 drywaDetails
remove wall covering from walls & install foundation bolts, install 1/2 plywood on walls & 5/8 drywa | $10,000 |
| Nov 21, 2002 | Completed final sign-off Apr 2003 | 1520 Larkin St | remodel 2 bathrooms & kitchen & repair dryrot as necessary.Details
remodel 2 bathrooms & kitchen & repair dryrot as necessary. | $12,000 |
| Sep 18, 2002 | Completed final sign-off Dec 2002 | 75 El Plazuela Wy | revision 2002s09106138, install window in bedroom and 3 windows in game room with 6x6 headerDetails
revision 2002s09106138, install window in bedroom and 3 windows in game room with 6x6 header | $1,000 |
| Sep 10, 2002 | Completed final sign-off Dec 2002 | 75 El Plazuela Wy | build accessory room as shown on plans w/one bedrm & 1 game rm & bathrm & laundry areaDetails
build accessory room as shown on plans w/one bedrm & 1 game rm & bathrm & laundry area | $20,000 |