Calvin Chan Constr Inc. **See Note **
- Based in
- San Jose
- On San Francisco permits
- Nov 2005 to Sep 2022
- Last 24 months
- 0 permits filed
30 permits since 2000: 26 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 21, 2022 | Completed final sign-off Dec 2022 | 1735 Ocean Av | change insurance office to a grocery shop. add mop sink & sales counterDetails
change insurance office to a grocery shop. add mop sink & sales counter | $4,000 |
| Aug 8, 2022 | Completed final sign-off Nov 2022 | 3828 Sacramento St | unit 2: repair (e) bath tub, toilet, basin, exhaust fan, patch/replace tile & drywallDetails
unit 2: repair (e) bath tub, toilet, basin, exhaust fan, patch/replace tile & drywall | $10,500 |
| May 14, 2019 | Completed final sign-off Jul 2019 | 267 Ralston St | replace three windows, repainting outside wall. same size windows aluminimum - like for like.Details
replace three windows, repainting outside wall. same size windows aluminimum - like for like. | $9,000 |
| Jan 4, 2019 | Completed final sign-off Jun 2019 | 27 Sweeny St | remodel two bathrooms and upgrade electrical main panel. 5x8 eachDetails
remodel two bathrooms and upgrade electrical main panel. 5x8 each | $18,000 |
| Oct 25, 2017 | Completed final sign-off Dec 2017 | 1593 Mcallister St | replace siding at the back with insulation and with plywood, hardie plank sidingDetails
replace siding at the back with insulation and with plywood, hardie plank siding | $21,000 |
| May 30, 2017 | Completed final sign-off Jan 2019 | 1348 27th Av | add unit per ordinance no. 95-17. revision to pa#201703171678 at first floor. add new kitchen for new accessory dwelling unit.Details
add unit per ordinance no. 95-17. revision to pa#201703171678 at first floor. add new kitchen for new accessory dwelling unit. | $17,000 |
| Mar 17, 2017 | Completed final sign-off Nov 2018 | 1346 27th Av | construct two bedrooms, one half bathroom, & family room @ ground floor. relocate kitchen & dining room. construct one half bathroom at 2nd floor. remove existing foundation, replace w/new & new post at ground floor.Details
construct two bedrooms, one half bathroom, & family room @ ground floor. relocate kitchen & dining room. construct one half bathroom at 2nd floor. remove existing foundation, replace w/new & new post at ground floor. | $70,000 |
| Dec 9, 2016 | Completed final sign-off May 2017 | 2 Vesta St | revision to app#201509237900/r-2, modify lower floor bathrooms configuration by relocate a non-structural partition wall, bathroom sink and replace bathtub with a shower pan. shift a fire rated door from center to side.Details
revision to app#201509237900/r-2, modify lower floor bathrooms configuration by relocate a non-structural partition wall, bathroom sink and replace bathtub with a shower pan. shift a fire rated door from center to side. | $2,000 |
| Dec 1, 2016 | Completed final sign-off May 2017 | 427 Randolph St | interior remodel: add one bedroom & one family room and two bathrooms @ ground floor. remodel (e)kitchen @ 2nd flr, add one new bedroom,one new bath @2nd flr.Details
interior remodel: add one bedroom & one family room and two bathrooms @ ground floor. remodel (e)kitchen @ 2nd flr, add one new bedroom,one new bath @2nd flr. | $40,000 |
| Aug 5, 2016 | Never finaled issued Aug 2016, no final | 2622 Irving St | repair the siding left side of the house - not visible from street.Details
repair the siding left side of the house - not visible from street. | $2,500 |
| Jul 19, 2016 | Completed final sign-off May 2017 | 124 Lakeview Av | 1/f- excavate +/-1' of earth and construct new walls for new 3 bedrooms, 2 bathrooms & a family. 2/f- relocate/remodel (e) kitchen and bedrooms, new bathrooms & new interior stair. 1 level wood deck at rear.Details
1/f- excavate +/-1' of earth and construct new walls for new 3 bedrooms, 2 bathrooms & a family. 2/f- relocate/remodel (e) kitchen and bedrooms, new bathrooms & new interior stair. 1 level wood deck at rear. | $49,000 |
| Jan 7, 2016 | Never finaled issued Jan 2016, no final | 528 Cordova St | repair handrail less than 50%. repair in-kind.Details
repair handrail less than 50%. repair in-kind. | $1,100 |
| Dec 7, 2015 | Completed final sign-off Jun 2016 | 71 Sala Tr | add 1 bedroom, 1 family room, 1 full bath and laundry on existing gr fl and add 1 full bath on 2nd fl per planDetails
add 1 bedroom, 1 family room, 1 full bath and laundry on existing gr fl and add 1 full bath on 2nd fl per plan | $65,000 |
| Sep 23, 2015 | Completed final sign-off Apr 2017 | 2 Vesta St | comply w/ nov #201558471. legalize (e) inlaw unit on ground fl including light, electrical outlets & plumbing; lower subfloor in bedroom #4 & playroom @ lower fl. provide 1-hr fire resistant heat source; relocate & replace electrical svc panel, provide 1-hr fire resistant materials between added uniDetails
comply w/ nov #201558471. legalize (e) inlaw unit on ground fl including light, electrical outlets & plumbing; lower subfloor in bedroom #4 & playroom @ lower fl. provide 1-hr fire resistant heat source; relocate & replace electrical svc panel, provide 1-hr fire resistant materials between added uni | $60,000 |
| Dec 29, 2014 | Completed final sign-off Jan 2015 | 602 Eddy St | convert extg retail space into vietnamese sandwich shop at ground floor. n/a for the maher. no exterior work.Details
convert extg retail space into vietnamese sandwich shop at ground floor. n/a for the maher. no exterior work. | $3,000 |
| Aug 28, 2014 | Completed final sign-off Dec 2014 | 778 25th Av | remodel kitchen, restroom, insulation, sheetrock, upgrade electrical, 10 new window not facing or visible from street. u factor windows, max 0.32. one full bathroom & one half bathroom.Details
remodel kitchen, restroom, insulation, sheetrock, upgrade electrical, 10 new window not facing or visible from street. u factor windows, max 0.32. one full bathroom & one half bathroom. | $35,000 |
| Dec 11, 2013 | Completed final sign-off Nov 2014 | 2095 09th Av | to obtain final inspection for work approved under pa 201108092114Details
to obtain final inspection for work approved under pa 201108092114 | |
| Nov 8, 2013 | Completed final sign-off Feb 2014 | 2250 21st Av | revise previous permit #201310189735. revise the construction cost price from 25,000 to 40,000. (write down the $15,000.00 cost in the permit)Details
revise previous permit #201310189735. revise the construction cost price from 25,000 to 40,000. (write down the $15,000.00 cost in the permit) | $15,000 |
| Sep 11, 2013 | Completed final sign-off Feb 2014 | 2250 21st Av | add 4' wood deck and 3' stair by sides at the back yard. provide opening at dining room and kitchen at 2nd fl. remove existing wood post at gr floor. no new habitable spaceDetails
add 4' wood deck and 3' stair by sides at the back yard. provide opening at dining room and kitchen at 2nd fl. remove existing wood post at gr floor. no new habitable space | $9,000 |
| Jan 8, 2013 | Completed final sign-off Jul 2013 | 33 Alvarado St | revision to pa# 2012-12-05-5489. provide the opening of the kitchen. interior work only.Details
revision to pa# 2012-12-05-5489. provide the opening of the kitchen. interior work only. | |
| Dec 5, 2012 | Completed final sign-off Jul 2013 | 33 Alvarado St | unit#3: kitchen & bathroom remodel. replace kitchen cabinets, move electrical outlets & new floor. bathroom-convert tub to shower, new floor & new vanity.Details
unit#3: kitchen & bathroom remodel. replace kitchen cabinets, move electrical outlets & new floor. bathroom-convert tub to shower, new floor & new vanity. | $30,000 |
| Aug 9, 2011 | Expired or cancelled expired Oct 2013 | 2095 09th Av | kitchen hood, counter top, cabinet, tiles.Details
kitchen hood, counter top, cabinet, tiles. | $1,200 |
| Jul 22, 2011 | Completed final sign-off Aug 2011 | 1780 23rd Av | repair stucco for 8' x 8'. repair in kind.Details
repair stucco for 8' x 8'. repair in kind. | $1,200 |
| Dec 13, 2010 | Completed final sign-off Apr 2011 | 4104 Geary Bl | fix and replace 16 windows, total 16 number at unit #4104, remodel (e) kitchen, counter top and cabinet, and bathroom sink, toilet to new and tileDetails
fix and replace 16 windows, total 16 number at unit #4104, remodel (e) kitchen, counter top and cabinet, and bathroom sink, toilet to new and tile | $2,500 |
| Jul 15, 2010 | Expired or cancelled expired Jul 2013 | 3850 Judah St | replace outside wall 2x4 stucco at the center and size of 2 x4Details
replace outside wall 2x4 stucco at the center and size of 2 x4 | $1,200 |
| Mar 30, 2010 | Completed final sign-off Jun 2015 | 670 24th Av | alteration to 1st floor to add 1 family room, 1 bedroom, 1 storage room and 1 full bathrom. replace furnace and water heater. replace rear foundation approx. 25 feet.Details
alteration to 1st floor to add 1 family room, 1 bedroom, 1 storage room and 1 full bathrom. replace furnace and water heater. replace rear foundation approx. 25 feet. | $50,000 |
| Jul 22, 2008 | Completed final sign-off Sep 2008 | 4631 Anza St | remodel existing bathroom install outlets to bathroom and kitchen outlets onlyDetails
remodel existing bathroom install outlets to bathroom and kitchen outlets only | $5,000 |
| Jul 17, 2008 | Completed final sign-off Sep 2008 | 4631 Anza St | replace kitchen cainet, painting, and refinish hardwood flooring.Details
replace kitchen cainet, painting, and refinish hardwood flooring. | $7,500 |
| Feb 2, 2006 | Completed final sign-off Mar 2006 | 2141 Taylor St | ((e) bathroom remodeling. replace all plumbing fixture & new lighting fixtures. (no structure) work in unit 2145 only.Details
((e) bathroom remodeling. replace all plumbing fixture & new lighting fixtures. (no structure) work in unit 2145 only. | $3,000 |
| Nov 22, 2005 | Completed final sign-off Jan 2006 | 2143 Taylor St | bthrm remodeling/replace bthtub & lavatory sinkDetails
bthrm remodeling/replace bthtub & lavatory sink | $2,500 |