Calisco Builders
- Based in
- Concord
- On San Francisco permits
- Jul 2011 to Jun 2012
- Last 24 months
- 0 permits filed
5 permits since 2000: 1 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 18, 2012 | Completed final sign-off Jul 2012 | 6271 03rd St | kitchen-remove sheetrock for electrical work. hall closet- remove sheetrock to install electrical panel. electric room- frame for main electrical panel, sheetrock, fire tape and fire caulk. install new sheetrock at opening in kitchen and hall closet, tape & top ready for painting.Details
kitchen-remove sheetrock for electrical work. hall closet- remove sheetrock to install electrical panel. electric room- frame for main electrical panel, sheetrock, fire tape and fire caulk. install new sheetrock at opening in kitchen and hall closet, tape & top ready for painting. | $7,000 |
| Apr 26, 2012 | Expired or cancelled cancelled Dec 2012 | 1051 De Haro St | remove and replace perimeter footing foundation due to foundation concrete no good.Details
remove and replace perimeter footing foundation due to foundation concrete no good. | $94,700 |
| Apr 4, 2012 | Expired or cancelled cancelled Dec 2012 | 1051 De Haro St | light remodel #a,b,c-upgrade electrical fixtures, new recessed lighting, upgrade subpanels, all fixtures in bathrooms, living rooms & kitchen for all units. upgrade/replace exterior fixtures, upgrade plumbing where needed- leaking shutoff valves, supply lines, toilets.Details
light remodel #a,b,c-upgrade electrical fixtures, new recessed lighting, upgrade subpanels, all fixtures in bathrooms, living rooms & kitchen for all units. upgrade/replace exterior fixtures, upgrade plumbing where needed- leaking shutoff valves, supply lines, toilets. | $50,000 |
| Jan 5, 2012 | Expired or cancelled cancelled Dec 2012 | 1051 De Haro St | repair according to markoff report #11408 item #1 treat for pest infestation, item #2 foundation fix bases to bring up to code, item #3 remove fungus and treat to prevent reoccurance, item #4 remove & replace siding to match existing, item #5 remove & replace window with new functional one.Details
repair according to markoff report #11408 item #1 treat for pest infestation, item #2 foundation fix bases to bring up to code, item #3 remove fungus and treat to prevent reoccurance, item #4 remove & replace siding to match existing, item #5 remove & replace window with new functional one. | $15,000 |
| Jul 20, 2011 | Expired or cancelled expired Jun 2013 | 329 Franconia St | repair stair treads and walkway, plants with new redwood on rear deck, all in -kind repair, 10% of stair structure, to comply with nov 201139641Details
repair stair treads and walkway, plants with new redwood on rear deck, all in -kind repair, 10% of stair structure, to comply with nov 201139641 | $2,500 |