California Aesthetics Inc
- Based in
- Antioch
- On San Francisco permits
- Feb 2015 to Mar 2021
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 1, 2021 | Completed final sign-off Jul 2022 | 71 Peralta Av | to comply with nov# 202057431. replace (e) retaining wall at rear (4'6"). rebuild front stair from sidewalk up to front porch. 1-hr rated guardrail at side of stair less than 5' from property line. 3' fence at street on top of (e) 3' retaining wall (6' max from sidewalk).Details
to comply with nov# 202057431. replace (e) retaining wall at rear (4'6"). rebuild front stair from sidewalk up to front porch. 1-hr rated guardrail at side of stair less than 5' from property line. 3' fence at street on top of (e) 3' retaining wall (6' max from sidewalk). | $14,000 |
| Apr 20, 2015 | Completed final sign-off May 2015 | 2990 Clay St | uit #2: revision to pa # 2015 0213 8314: update (e0 conc. fdn per structural insoectionDetails
uit #2: revision to pa # 2015 0213 8314: update (e0 conc. fdn per structural insoection | |
| Feb 13, 2015 | Completed final sign-off May 2015 | 2990 Clay St | unit #2 - interior remodel of 2 (e) baths (no structural changes), remodel south edge of kitchen to enlarge opening between kitchen & liv. room w/ minor structural changes ( two new 4x6 posts & new beam, two new footings @ (e) utility room below).Details
unit #2 - interior remodel of 2 (e) baths (no structural changes), remodel south edge of kitchen to enlarge opening between kitchen & liv. room w/ minor structural changes ( two new 4x6 posts & new beam, two new footings @ (e) utility room below). | $40,000 |