Caleb Kinser Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2013 to Jul 2018
- Last 24 months
- 0 permits filed
18 permits since 2000: 16 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 18, 2018 | Completed final sign-off Sep 2018 | 337 Winfield St | replace 10 balustrades on front stairs in kind, replace t-111 siding back of house, stair repair not to exceed 50% in-kindDetails
replace 10 balustrades on front stairs in kind, replace t-111 siding back of house, stair repair not to exceed 50% in-kind | $500 |
| Apr 25, 2018 | Completed final sign-off Jul 2018 | 3550 Market St | apt #302: remodel bathroom-new vanity, tiles, shower, toilet, (3) led cans, fan.Details
apt #302: remodel bathroom-new vanity, tiles, shower, toilet, (3) led cans, fan. | $40,000 |
| Dec 14, 2016 | Completed final sign-off Mar 2017 | 28 Winfield St | windows not visible from street. new bath & demo upper level bath w/ same footprint. demo windows at upper level rear & replace w/ new slider 5 windows. kitchen remodel. sand & refinish upper level hardwood floors. electrical recessed lights.Details
windows not visible from street. new bath & demo upper level bath w/ same footprint. demo windows at upper level rear & replace w/ new slider 5 windows. kitchen remodel. sand & refinish upper level hardwood floors. electrical recessed lights. | $31,000 |
| Jul 12, 2016 | Completed final sign-off Nov 2016 | 95 Keystone Wy | remove bearing & non bearing walls between living, dining & sunroom @ main floor. create new master suite by combining existing bath, bedroom & closet on upper level.Details
remove bearing & non bearing walls between living, dining & sunroom @ main floor. create new master suite by combining existing bath, bedroom & closet on upper level. | $50,000 |
| Jul 1, 2016 | Completed final sign-off Oct 2016 | 95 Keystone Wy | replace old aluminum window at back of house (living room) with 4 (n) vinyl windows.Details
replace old aluminum window at back of house (living room) with 4 (n) vinyl windows. | $15,000 |
| Jul 1, 2016 | Completed final sign-off Jul 2016 | 95 Keystone Wy | exploratory demo for dining room & living rom, wall, ceilings, upper level room & closet back of house. rmeove and replace approx 100sf of walls & ceilings surface. no change to layout.Details
exploratory demo for dining room & living rom, wall, ceilings, upper level room & closet back of house. rmeove and replace approx 100sf of walls & ceilings surface. no change to layout. | $4,000 |
| Apr 6, 2016 | Completed final sign-off Jun 2016 | 327 30th Av | replace front stairs, footprint remains the same, railings are to be time periodDetails
replace front stairs, footprint remains the same, railings are to be time period | $15,000 |
| Mar 8, 2016 | Completed final sign-off Apr 2016 | 710 21st Av | repair dry rot at 2nd story level of 3 story stairs; total work less than 50% of total stairs.Details
repair dry rot at 2nd story level of 3 story stairs; total work less than 50% of total stairs. | $7,500 |
| Mar 7, 2016 | Expired or cancelled cancelled Jan 2026 | 327 30th Av | 1403Details
1403 | $19,000 |
| Sep 14, 2015 | Completed final sign-off Dec 2015 | 133 Bradford St | add stucco to back of house, repair dryrot upstairs office window.Details
add stucco to back of house, repair dryrot upstairs office window. | $6,500 |
| Mar 17, 2015 | Completed final sign-off Sep 2015 | 1612 York St | revision to permit 201412314762; building inspector asked for further detail on the footing condition on the north side of the new bathroom.Details
revision to permit 201412314762; building inspector asked for further detail on the footing condition on the north side of the new bathroom. | |
| Jan 16, 2015 | Completed final sign-off May 2015 | 114 Edgewood Av | replace deck same size same same location at rear yard.Details
replace deck same size same same location at rear yard. | $20,000 |
| Dec 31, 2014 | Completed final sign-off Sep 2015 | 1612 York St | relocation of washer and dryer. construction of new bathroom on botton floor (full bath)Details
relocation of washer and dryer. construction of new bathroom on botton floor (full bath) | $20,000 |
| Nov 4, 2014 | Completed final sign-off Dec 2014 | 55 Arago St | replace like with like 7'x15'6" deck. to comply complaint #201402671Details
replace like with like 7'x15'6" deck. to comply complaint #201402671 | $12,000 |
| Apr 29, 2014 | Completed final sign-off May 2014 | 543 Greenwich St | repair 2nd flight of existing stairs at back of property, r&r dry rot. not to exceed 50% of job total.Details
repair 2nd flight of existing stairs at back of property, r&r dry rot. not to exceed 50% of job total. | $10,000 |
| Feb 5, 2014 | Completed final sign-off Apr 2014 | 237 Arguello Bl | #7: bathroom remodel (n) tub(n) toilet (n) vanity & sink (n) exhaust fan, remove lathe and plaster & install (n) sheetrock & (n) tile, 2 (n) low voltage recessed cans and new switch for fan. one new window in kind at light well not visible from street, no change of wall & doorDetails
#7: bathroom remodel (n) tub(n) toilet (n) vanity & sink (n) exhaust fan, remove lathe and plaster & install (n) sheetrock & (n) tile, 2 (n) low voltage recessed cans and new switch for fan. one new window in kind at light well not visible from street, no change of wall & door | $25,000 |
| Sep 20, 2013 | Never finaled issued Sep 2013, no final | 65 Montezuma St | rear top deck: reinforce deck - underneath top deck joists install steel strap is 1/4"x2-1/2x16'-5" galvanized w/ screw 1/4", 3" sds. screws where strap meets deck joist.Details
rear top deck: reinforce deck - underneath top deck joists install steel strap is 1/4"x2-1/2x16'-5" galvanized w/ screw 1/4", 3" sds. screws where strap meets deck joist. | $1,160 |
| Aug 30, 2013 | Completed final sign-off Dec 2013 | 237 Arguello Bl | r & r kitchen cabs, new linoleum floor, new counter top, new hot & cold angle stops, are=8'x9' electrical: 3 new additional outlets to kitchen counter (2) small appliance circuits to be installed. move refridge outlet, (n) flourescent light (4) title 24; power (4) future hood fan, new sub panelDetails
r & r kitchen cabs, new linoleum floor, new counter top, new hot & cold angle stops, are=8'x9' electrical: 3 new additional outlets to kitchen counter (2) small appliance circuits to be installed. move refridge outlet, (n) flourescent light (4) title 24; power (4) future hood fan, new sub panel | $13,970 |