Cal Phase Construction Inc
- Based in
- San Jose
- On San Francisco permits
- Nov 2008 to Jul 2014
- Last 24 months
- 0 permits filed
6 permits since 2000: 3 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2014 | Never finaled issued Jul 2014, no final | 1 La Avanzada | to complete work and to obtain final inspection for work aproved under pa 201208238117Details
to complete work and to obtain final inspection for work aproved under pa 201208238117 | $3,800 |
| Sep 24, 2013 | Completed final sign-off Jun 2016 | 1 Front St | remove extg 10 gallon daytank/pumpset and install new remote fillport to existing fuel oil piping to existing emergency generator.Details
remove extg 10 gallon daytank/pumpset and install new remote fillport to existing fuel oil piping to existing emergency generator. | $59,000 |
| Aug 23, 2012 | Never finaled issued Sep 2012, no final | 1 La Avanzada | reconfigure fuel piping assembly at generator base tank as to not block float switch access. replace (e) pump controller and add new detection monitoring system moduleDetails
reconfigure fuel piping assembly at generator base tank as to not block float switch access. replace (e) pump controller and add new detection monitoring system module | $3,800 |
| Oct 2, 2009 | Completed final sign-off Mar 2010 | 3701 Noriega St | gas station upgrade evr phase ii- installing ex-veed-root tls350 monitoring system with 2 hour enclosureDetails
gas station upgrade evr phase ii- installing ex-veed-root tls350 monitoring system with 2 hour enclosure | $31,000 |
| Feb 6, 2009 | Completed final sign-off Apr 2009 | 855 Battery St | revision to app 200811035717. replace 12" concrete pad to 4"Details
revision to app 200811035717. replace 12" concrete pad to 4" | |
| Nov 3, 2008 | Expired or cancelled expired Mar 2010 | 855 Battery St | install new deisel 2000 gallon ast & associated equipment, new two 50 gallon day tanks, 3 hr firewall & fire door, install new dual port fill box, secondary contained fill pipe, monitored supply and return, and tank monitoring equipment, demo existing fill box.(diesel)Details
install new deisel 2000 gallon ast & associated equipment, new two 50 gallon day tanks, 3 hr firewall & fire door, install new dual port fill box, secondary contained fill pipe, monitored supply and return, and tank monitoring equipment, demo existing fill box.(diesel) | $150,000 |