Cal-Bay Craftsmen Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2017 to Mar 2021
- Last 24 months
- 0 permits filed
11 permits since 2000: 8 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 29, 2021 | Completed final sign-off Dec 2022 | 1417 Sanchez St | install new side entry door at alley. remove front courtyard stair and install emergency escape ladder.Details
install new side entry door at alley. remove front courtyard stair and install emergency escape ladder. | $5,000 |
| Sep 17, 2019 | In progress issued May 2024 | 378 Sweeny St | 2-story rear addition, (n) 1-story rear deck & stair to yard. install (5)(n) windows & (2) exterior doors @ rear & side - not visible to street, (1) (n) skylightDetails
2-story rear addition, (n) 1-story rear deck & stair to yard. install (5)(n) windows & (2) exterior doors @ rear & side - not visible to street, (1) (n) skylight | $100,000 |
| Sep 17, 2019 | Expired or cancelled withdrawn Apr 2021 | 378 Sweeny St | convert 1st floor living space to adu with (1) bedroom & (1) bath (495 sq ft) per ordinance #95-17Details
convert 1st floor living space to adu with (1) bedroom & (1) bath (495 sq ft) per ordinance #95-17 | $20,000 |
| Oct 10, 2018 | Completed final sign-off Feb 2024 | 439 Jersey St | revision to pa 2018-0622-2664 - remodel 2nd fl bathroom and laundry. relocate living & bedroom; add new toilet and sink at garage flp; replace existing concrete slab at garage and replace sewer lineDetails
revision to pa 2018-0622-2664 - remodel 2nd fl bathroom and laundry. relocate living & bedroom; add new toilet and sink at garage flp; replace existing concrete slab at garage and replace sewer line | $40,000 |
| Jun 22, 2018 | Completed final sign-off Feb 2024 | 439 Jersey St | interior remodel of kitchen, bathroom, dining and living room. upgrade electrical lighting. new sliding door and window at rear of bldgDetails
interior remodel of kitchen, bathroom, dining and living room. upgrade electrical lighting. new sliding door and window at rear of bldg | $120,000 |
| May 7, 2018 | Completed final sign-off Jan 2019 | 1255 Fulton St | move a non structural wall between a bathroom and pantry to create a laundry area in existing pantry roomDetails
move a non structural wall between a bathroom and pantry to create a laundry area in existing pantry room | $5,000 |
| Mar 8, 2018 | Completed final sign-off Apr 2019 | 439 Jersey St | in kind replacement of (e) wood stairs and landing at rear bldDetails
in kind replacement of (e) wood stairs and landing at rear bld | $15,000 |
| Jan 11, 2018 | Never finaled issued Jan 2018, no final | 378 Sweeny St | replace/remodel 1 bathroom in-kind, same location.Details
replace/remodel 1 bathroom in-kind, same location. | $5,000 |
| Jan 11, 2018 | Completed final sign-off Apr 2018 | 456 Noe St | replace/remodel 1 bathroom in-kind, same location.Details
replace/remodel 1 bathroom in-kind, same location. | $5,000 |
| Sep 13, 2017 | Completed final sign-off Dec 2022 | 1415 Sanchez St | convert 1st flr storage to living space, merge 2nd & 3rd flr, relocate 1 unit to 1st flr inc (n) kitchen & bath. add attached garage at side alley & raise bldg to allow access. rear addition & deck. relocate & renovate kit @ 2nd flr, delete full bath & install 1/2 bath, 2 new baths @ 3rd flr.Details
convert 1st flr storage to living space, merge 2nd & 3rd flr, relocate 1 unit to 1st flr inc (n) kitchen & bath. add attached garage at side alley & raise bldg to allow access. rear addition & deck. relocate & renovate kit @ 2nd flr, delete full bath & install 1/2 bath, 2 new baths @ 3rd flr. | $650,000 |
| Aug 29, 2017 | Completed final sign-off Nov 2017 | 34 Winfield St | replace kitchen in kind, demo down to studss. replace kitchen cabinets and countertops, upgrading electrical and plumbing. installing new wood floors. replace master bath tub and tub faucetDetails
replace kitchen in kind, demo down to studss. replace kitchen cabinets and countertops, upgrading electrical and plumbing. installing new wood floors. replace master bath tub and tub faucet | $40,000 |