Cacci Construction Inc
- Based in
- San Carlos
- On San Francisco permits
- Mar 2003 to Mar 2017
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 30, 2017 | Completed final sign-off Jan 2018 | 275 Moncada Wy | replace 7 existing windows in existing openings. no changes to openings or new openings. 4 casements. marvin products, insulated glass; simulated divided lites with spacers.Details
replace 7 existing windows in existing openings. no changes to openings or new openings. 4 casements. marvin products, insulated glass; simulated divided lites with spacers. | $7,000 |
| May 25, 2016 | Completed final sign-off Feb 2017 | 275 Moncada Wy | remodel (e) kitchen in (e0 footprint (no additionals floor area) no additional conditioned space. not visible from the street; one bearing interior wall opeming; replace 2 windowd; fill in 1 exterior opening.Details
remodel (e) kitchen in (e0 footprint (no additionals floor area) no additional conditioned space. not visible from the street; one bearing interior wall opeming; replace 2 windowd; fill in 1 exterior opening. | $23,072 |
| Aug 13, 2003 | Completed final sign-off Dec 2003 | 110 Westmoorland Dr | kitchen remodel same location cabs counters flooring ect. ligthing.Details
kitchen remodel same location cabs counters flooring ect. ligthing. | $40,000 |
| Jun 10, 2003 | Completed final sign-off Nov 2003 | 4377 26th St | kitchen remodelDetails
kitchen remodel | $50,000 |
| Mar 12, 2003 | Completed final sign-off Jun 2003 | 100 Robinson Dr | basement alteration add bath add bedroom add laundry. replace furnace & water heaterDetails
basement alteration add bath add bedroom add laundry. replace furnace & water heater | $30,000 |