Cabre Tech Solutions Inc
- Based in
- Livermore
- On San Francisco permits
- Feb 2025 to Dec 2025
- Last 24 months
- 2 permits filed
2 permits since 2000: 1 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 8, 2025 | Completed final sign-off Apr 2026 | 849 Avenue D | install 6 new antennas on pole. install 6 radios, install 2 cabinets, remove existing panel antennas, remove 1 cabinet existing.Details
install 6 new antennas on pole. install 6 radios, install 2 cabinets, remove existing panel antennas, remove 1 cabinet existing. | $25,000 |
| Feb 7, 2025 | In progress issued Jun 2025 | 1625 Post St | front of the building t-mobile: remove 3(e) antennas + 1(e) cabinet, install 6(n) antennas within 3(n) frp screens, instal 2(n), install 12(n) batteries <70kwh + <50 gallons electrolytes, relocate (e) elec tric panel , install (n) meter.Details
front of the building t-mobile: remove 3(e) antennas + 1(e) cabinet, install 6(n) antennas within 3(n) frp screens, instal 2(n), install 12(n) batteries <70kwh + <50 gallons electrolytes, relocate (e) elec tric panel , install (n) meter. | $125,000 |