Cabinet Essentials Inc Dba Otb Construct
- Based in
- Antioch
- On San Francisco permits
- Jan 2025 to Jan 2025
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 27, 2025 | In progress issued Jan 2025 | 1380 Sanchez St | abate nov# 202430410: removal of finished surfaces & no walls removal . upgrade elec. install plumbing fixtures, window replacement, install insulation, install drywall, (2)kitchen remodel, (2)bath remodel, siding repair. repair hole in roof. note: all damage caused by interior fire in 2/f unit &Details
abate nov# 202430410: removal of finished surfaces & no walls removal . upgrade elec. install plumbing fixtures, window replacement, install insulation, install drywall, (2)kitchen remodel, (2)bath remodel, siding repair. repair hole in roof. note: all damage caused by interior fire in 2/f unit & | $150,000 |