Cabano
- Based in
- South San Francisco
- On San Francisco permits
- May 2005 to May 2017
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 22, 2017 | Completed final sign-off Mar 2018 | 1312 Ocean Av | to add an unisex ada bath, relocate rear door, to comply w/ nov 201535481.Details
to add an unisex ada bath, relocate rear door, to comply w/ nov 201535481. | $20,000 |
| Aug 10, 2015 | Completed final sign-off Dec 2015 | 47 Fair Oaks St | unit 47b: demo of (e) fixtures & surfaces. floor framining - rough/finish plumb (sinks and shower tub) rough elect. lights - plugs - exhaust fan. rough mech, neew exhaust fan. ceramic tile floor and walls. painting - dry wall patches.Details
unit 47b: demo of (e) fixtures & surfaces. floor framining - rough/finish plumb (sinks and shower tub) rough elect. lights - plugs - exhaust fan. rough mech, neew exhaust fan. ceramic tile floor and walls. painting - dry wall patches. | $14,300 |
| May 29, 2013 | Completed final sign-off Nov 2013 | 172 Forest Side Av | remove and replace toilet ,vanity, ceramic tile, entry door, bathroom window, new shower valve, new fan/light, new gfic plug,Details
remove and replace toilet ,vanity, ceramic tile, entry door, bathroom window, new shower valve, new fan/light, new gfic plug, | $11,400 |
| Oct 5, 2012 | Completed final sign-off Feb 2013 | 2634 Bush St | to finalize work approved under pa 201002116347Details
to finalize work approved under pa 201002116347 | $2,400 |
| Nov 14, 2011 | Completed final sign-off Dec 2011 | 1870 Great Hy | bathroom remodel at 2nd floor: replace e plumbing fixtures with new. replace ceramic tile with new on floor - tub surround. new gfci to replace (e) plug. no wall relocation. permanently installed lights shall be high efficacy unless they are controlled by manual on occupancy sensors - cec 150(k)10.Details
bathroom remodel at 2nd floor: replace e plumbing fixtures with new. replace ceramic tile with new on floor - tub surround. new gfci to replace (e) plug. no wall relocation. permanently installed lights shall be high efficacy unless they are controlled by manual on occupancy sensors - cec 150(k)10. | $9,580 |
| Dec 9, 2010 | Completed final sign-off Jan 2011 | 2030 Steiner St | remove and replace ext window trim with like materials on 3 windows, replace one pc rustic horizontal with like material;Details
remove and replace ext window trim with like materials on 3 windows, replace one pc rustic horizontal with like material; | $940 |
| Feb 11, 2010 | Expired or cancelled expired Nov 2012 | 2632 Bush St | comply with nov# 200907325-remove & replace stringer & 1 right side siding.Details
comply with nov# 200907325-remove & replace stringer & 1 right side siding. | $850 |
| Apr 21, 2008 | Completed final sign-off Jul 2008 | 56 Rockwood Ct | 2nd floor: kitchen remodel, no lighting: replace sink/faucet and 4 cabinets, new countertops, new electric oven and painting.Details
2nd floor: kitchen remodel, no lighting: replace sink/faucet and 4 cabinets, new countertops, new electric oven and painting. | $14,200 |
| Nov 17, 2006 | Completed final sign-off Feb 2007 | 951 Leavenworth St | remove & replace kitchen cabinets. 5/8" type "x" gyp board between unit & @ property line wall. remove plaster walls. replace gyp board new vinyl flooring. paint entire room. install owner supply appliances, flourescent lighting.Details
remove & replace kitchen cabinets. 5/8" type "x" gyp board between unit & @ property line wall. remove plaster walls. replace gyp board new vinyl flooring. paint entire room. install owner supply appliances, flourescent lighting. | $11,400 |
| May 4, 2005 | Completed final sign-off Jun 2005 | 2030 Steiner St | repair/replace two posts & one tread; repair/replace severed raisers at front of buildingDetails
repair/replace two posts & one tread; repair/replace severed raisers at front of building | $2,100 |