C&M Development & Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2011 to Jun 2020
- Last 24 months
- 0 permits filed
85 permits since 2000: 46 completed, 31 never finaled, 8 expired or cancelled.
Of the 31 never-finaled permits, 8 are 5 to 10 years old, 23 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2020 | Never finaled issued Jun 2020, no final | 1487 48th Av | replace bathroom fixtures & re-tile in-kind, replace kitchen cabinets and counter top in-kind & repair wood siding (approximately 200sf) in-kind. front buildingDetails
replace bathroom fixtures & re-tile in-kind, replace kitchen cabinets and counter top in-kind & repair wood siding (approximately 200sf) in-kind. front building | $10,000 |
| Jan 30, 2020 | Completed final sign-off May 2022 | 190 Lomita Av | 1st floor: remodel (e) laundry. 2nd floor: remodel/ relocate kitchen, modify (e) kitchen to bedroom, remodel (e) bathroom. 3rd floor: modify (e) master closet and bath to bedroom, turn (e) bathroom to two (n) bathrooms. modify (e) laundry to full bathDetails
1st floor: remodel (e) laundry. 2nd floor: remodel/ relocate kitchen, modify (e) kitchen to bedroom, remodel (e) bathroom. 3rd floor: modify (e) master closet and bath to bedroom, turn (e) bathroom to two (n) bathrooms. modify (e) laundry to full bath | $90,000 |
| Oct 22, 2019 | Completed final sign-off Jun 2022 | 136 Lomita Av | 1st fl relocate laundry into e backroom. 2nd fl remove e kitchen, modify e kitchen to bedroom, e half bath to full bath. 3rd fl remodel e bath, new bedroom and modify e 3 clos bath to two full bath, replace all windowsDetails
1st fl relocate laundry into e backroom. 2nd fl remove e kitchen, modify e kitchen to bedroom, e half bath to full bath. 3rd fl remodel e bath, new bedroom and modify e 3 clos bath to two full bath, replace all windows | $85,000 |
| Sep 4, 2019 | Completed final sign-off Jun 2021 | 3196 16th St | removed kitchen sink & stove, and bathroom shower back to original comercial use to existing basement. to coply with #201954711Details
removed kitchen sink & stove, and bathroom shower back to original comercial use to existing basement. to coply with #201954711 | $1,000 |
| Mar 18, 2019 | Expired or cancelled expired Jun 2026 | 85 14th St | to comply with nov 201813041 soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4Details
to comply with nov 201813041 soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4 | $30,000 |
| Mar 8, 2018 | Never finaled issued Mar 2018, no final | 124 Clement St | repair missing hole & wall & ceiling at the side hallway to garbage area. to complaint #2017851810 #6. fire proofing with approved materials.Details
repair missing hole & wall & ceiling at the side hallway to garbage area. to complaint #2017851810 #6. fire proofing with approved materials. | $500 |
| Feb 7, 2018 | Completed final sign-off Nov 2018 | 1392 Funston Av | apt #3: to obtain a final inspection for work approved under pa#201511051787. all work is complete.Details
apt #3: to obtain a final inspection for work approved under pa#201511051787. all work is complete. | |
| Feb 7, 2018 | Never finaled issued Feb 2018, no final | 1392 Funston Av | apt #2 & 5: to obtain a final inspection for work approved under pa#201610059638. all work is complete.Details
apt #2 & 5: to obtain a final inspection for work approved under pa#201610059638. all work is complete. | |
| Feb 7, 2018 | Completed final sign-off Feb 2019 | 239 Hugo St | remodel kitchen new cabinets new sink new tiles, appliances, flooring,paint,remodel bathroom new toiletry,cabinets,toilet,tiles, fixtures, paint no rough framing or change in layoutDetails
remodel kitchen new cabinets new sink new tiles, appliances, flooring,paint,remodel bathroom new toiletry,cabinets,toilet,tiles, fixtures, paint no rough framing or change in layout | $25,000 |
| Nov 27, 2017 | Never finaled issued Dec 2017, no final | 124 Clement St | to comply with complaint 201785181 - revision to 201710050456 remodel (e) retail space at grnd lvl. to prepare vanilla shell for future tenants with new ada restroom, and door controller.Details
to comply with complaint 201785181 - revision to 201710050456 remodel (e) retail space at grnd lvl. to prepare vanilla shell for future tenants with new ada restroom, and door controller. | $100 |
| Oct 5, 2017 | Never finaled issued Oct 2017, no final | 124 Clement St | ti remodel (e) retail space at the ground floor to new retail space room including office, ramp and new ada restroom (all gender)Details
ti remodel (e) retail space at the ground floor to new retail space room including office, ramp and new ada restroom (all gender) | $30,000 |
| Sep 11, 2017 | Expired or cancelled expired Jun 2020 | 535 Broderick St | soft story retrofit per sfebc chapter 4d, engineering criteria 2016 cebc appendeix a-4.Details
soft story retrofit per sfebc chapter 4d, engineering criteria 2016 cebc appendeix a-4. | $50,000 |
| Sep 8, 2017 | Completed final sign-off Dec 2019 | 1392 Funston Av | soft story retrofit per sfebc chapter 4d, 2016 cebc appenbdix a-4Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appenbdix a-4 | $50,000 |
| Jun 14, 2017 | Expired or cancelled expired Dec 2019 | 861 Sutter St | renovation of apt 202 2nd fl including new bedroom, new laundry, renovate kitchen and bath, new lighting, revised heating. no exterior changes. replace 2 windows in kind, maher not reqDetails
renovation of apt 202 2nd fl including new bedroom, new laundry, renovate kitchen and bath, new lighting, revised heating. no exterior changes. replace 2 windows in kind, maher not req | $30,000 |
| Jun 7, 2017 | Expired or cancelled expired Dec 2019 | 861 Sutter St | unit #403 4th level: renovate including addition of new bedroom, new laundry. renovate kitchen & bathroom, new lighting. no exterior work.Details
unit #403 4th level: renovate including addition of new bedroom, new laundry. renovate kitchen & bathroom, new lighting. no exterior work. | $30,000 |
| May 22, 2017 | Completed final sign-off Oct 2018 | 1150 Holloway Av | reconfigure lower floor plan. recommencement and completion of work approved under pa# 201411060945Details
reconfigure lower floor plan. recommencement and completion of work approved under pa# 201411060945 | $40,000 |
| Apr 24, 2017 | Never finaled issued Apr 2017, no final | 535 Broderick St | units 1 & 2: remodel kitchen & bathroom, change lighting in same location, no change in wallsDetails
units 1 & 2: remodel kitchen & bathroom, change lighting in same location, no change in walls | $20,000 |
| Mar 23, 2017 | Expired or cancelled cancelled Jul 2025 | 807 38th Av | legalize (e) in-law unitDetails
legalize (e) in-law unit | $800 |
| Mar 20, 2017 | Completed final sign-off Oct 2017 | 1783 08th Av | remodeling kitchen & bathroom at middle level; 100% kitchen high efficacy lighting, bathroom lighting high efficacy or controlled by manual-on sensor when high efficancy main light, no change in walls & openings.Details
remodeling kitchen & bathroom at middle level; 100% kitchen high efficacy lighting, bathroom lighting high efficacy or controlled by manual-on sensor when high efficancy main light, no change in walls & openings. | $40,000 |
| Mar 17, 2017 | Expired or cancelled expired Dec 2019 | 861 Sutter St | #503: renovation of extg apartment on 5th floor including new bedroom, new laundry, renovated kitchen and bath, new lighting revised heating.Details
#503: renovation of extg apartment on 5th floor including new bedroom, new laundry, renovated kitchen and bath, new lighting revised heating. | $30,000 |
| Dec 20, 2016 | Completed final sign-off Apr 2017 | 2656 Van Ness Av | #6: renovation of apartment on the 2nd floor including new bedroom, renovation of kitchen and bathroom, install new laundry closet, lighting revisions. revision to heating. structural modification. n/a for maherDetails
#6: renovation of apartment on the 2nd floor including new bedroom, renovation of kitchen and bathroom, install new laundry closet, lighting revisions. revision to heating. structural modification. n/a for maher | $30,000 |
| Dec 15, 2016 | Completed final sign-off Nov 2017 | 535 Leavenworth St | renovation of apt #41 on 4th level - addition of new bedroom, renovation of kitchen, bath, new partitions, new laundry. revise lighting & heating. maher naDetails
renovation of apt #41 on 4th level - addition of new bedroom, renovation of kitchen, bath, new partitions, new laundry. revise lighting & heating. maher na | $20,000 |
| Oct 5, 2016 | Never finaled issued Oct 2016, no final | 1392 Funston Av | to obtain a final inspection for work approved under pa#201403181042. all work is complete.Details
to obtain a final inspection for work approved under pa#201403181042. all work is complete. | |
| Oct 4, 2016 | Never finaled issued Oct 2016, no final | 2099 Market St | #2a, 2b, 3a, 3b, 3c & 3d - hvac change out for 6 existing residential units. ref. pa 2015-0520-6808Details
#2a, 2b, 3a, 3b, 3c & 3d - hvac change out for 6 existing residential units. ref. pa 2015-0520-6808 | $70,000 |
| Aug 15, 2016 | Expired or cancelled cancelled Sep 2019 | 612 Broadway | interior ti for an (e) retail store, work includes: add an accessory use area (food prep area). provide accessible ramp to retail. update restroom to comply ada requirements. relocate stairsDetails
interior ti for an (e) retail store, work includes: add an accessory use area (food prep area). provide accessible ramp to retail. update restroom to comply ada requirements. relocate stairs | $40,000 |
| Aug 1, 2016 | Completed final sign-off Apr 2017 | 483 22nd Av | seismic retrofit per sfbc mandatory soft story program in accordance with iebc appx a4Details
seismic retrofit per sfbc mandatory soft story program in accordance with iebc appx a4 | $40,000 |
| Jul 25, 2016 | Never finaled issued Sep 2016, no final | 616 Broadway | repair exterior concrete wall crack outside 4th floor at lightwellDetails
repair exterior concrete wall crack outside 4th floor at lightwell | $3,500 |
| May 24, 2016 | Never finaled issued May 2016, no final | 50 Irving St | front bld: total remodel of kitchen and bathrooms including sheet rock, new insulationDetails
front bld: total remodel of kitchen and bathrooms including sheet rock, new insulation | $10,000 |
| Feb 1, 2016 | Completed final sign-off Sep 2016 | 372 San Carlos St | repair replace 5x5 sheetrock due to assebility for romex and p-trapDetails
repair replace 5x5 sheetrock due to assebility for romex and p-trap | $500 |
| Dec 30, 2015 | Completed final sign-off Dec 2017 | 370 San Carlos St | work at 370 san carlos st. only: to complete work and obtain final inspection for work approved under pa#200703237136.Details
work at 370 san carlos st. only: to complete work and obtain final inspection for work approved under pa#200703237136. | $1,000 |
| Nov 5, 2015 | Completed final sign-off Nov 2018 | 1392 Funston Av | 2nd fl unit 3. remodel/relocate (e) kitchen and bath, new toilet and convert (e) kitchen to bedroom. new outlets and fixtures per plan. expansion on work visible from street.Details
2nd fl unit 3. remodel/relocate (e) kitchen and bath, new toilet and convert (e) kitchen to bedroom. new outlets and fixtures per plan. expansion on work visible from street. | $38,000 |
| May 20, 2015 | Completed final sign-off Feb 2017 | 2099 Market St | 2nd & 3rd floors: units 2a, 2b, 2c, 2d, 3a, 3b, 3c, 3d: comply with nov 201060006 - to complete interior remodel.Details
2nd & 3rd floors: units 2a, 2b, 2c, 2d, 3a, 3b, 3c, 3d: comply with nov 201060006 - to complete interior remodel. | $120,000 |
| Apr 21, 2015 | Never finaled issued Jun 2015, no final | 300 Buchanan St | unit # 402: convert unit from 1 studio unit to 1 bedroom unit, remodel kitchen & bathroom. remove non-load bearing wallsDetails
unit # 402: convert unit from 1 studio unit to 1 bedroom unit, remodel kitchen & bathroom. remove non-load bearing walls | $20,000 |
| Apr 17, 2015 | Completed final sign-off Oct 2016 | 300 Buchanan St | unit# 109 & adjacent roof. remove & add interior walls. remodel kitchen & bath. add new bath. convert (e) closet & hallway closet into (n) home office. add w/d. convert (e) roof to roof deck. new lighting to modified spaces. maher - not req'dDetails
unit# 109 & adjacent roof. remove & add interior walls. remodel kitchen & bath. add new bath. convert (e) closet & hallway closet into (n) home office. add w/d. convert (e) roof to roof deck. new lighting to modified spaces. maher - not req'd | $70,000 |
| Apr 7, 2015 | Never finaled issued May 2015, no final | 669 Ellis St | unit #2 - remodel kitchen & bathroom fixtures, add new washer & dryers. n/a maher ordinanceDetails
unit #2 - remodel kitchen & bathroom fixtures, add new washer & dryers. n/a maher ordinance | $15,000 |
| Mar 25, 2015 | Completed final sign-off Sep 2015 | 3035 Baker St | #304: relocate kitchen remove non-load bearing walls. convert kitchen into den and add laundry room and closets.Details
#304: relocate kitchen remove non-load bearing walls. convert kitchen into den and add laundry room and closets. | $15,000 |
| Mar 6, 2015 | Never finaled issued Apr 2015, no final | 669 Ellis St | #7 - remodel (e) kitchen & bathroom. add wash & dryer. n/a maher ordinanceDetails
#7 - remodel (e) kitchen & bathroom. add wash & dryer. n/a maher ordinance | $10,000 |
| Mar 6, 2015 | Completed final sign-off Nov 2015 | 669 Ellis St | #14 - remodel (e) kitchen & bathroom. add wash & dryer. n/a maher ordinanceDetails
#14 - remodel (e) kitchen & bathroom. add wash & dryer. n/a maher ordinance | $10,000 |
| Feb 27, 2015 | Completed final sign-off Mar 2016 | 300 Buchanan St | unt #608 - convert from 1 bedroom, 1 bath unit to 2 bedrooms, 2 baths unit. remodel kitchen, remove & relocate non-load bearing wall. n/a maher ordinanceDetails
unt #608 - convert from 1 bedroom, 1 bath unit to 2 bedrooms, 2 baths unit. remodel kitchen, remove & relocate non-load bearing wall. n/a maher ordinance | $20,000 |
| Feb 27, 2015 | Completed final sign-off Mar 2016 | 300 Buchanan St | unt #204 - convert from 1 bedroom apartment to two bedrooms, two baths unit, remodel kitchen, remove non-load bearing wall. n/a maher ordinanceDetails
unt #204 - convert from 1 bedroom apartment to two bedrooms, two baths unit, remodel kitchen, remove non-load bearing wall. n/a maher ordinance | $30,000 |
| Feb 27, 2015 | Completed final sign-off Mar 2016 | 300 Buchanan St | unt #403 - convert from 1 bedroom,1 bath unit to 2 bedrooms, 2 bathrooms unit. remodel kitchen, remove non-load bearing wall. n/a maher ordinanceDetails
unt #403 - convert from 1 bedroom,1 bath unit to 2 bedrooms, 2 bathrooms unit. remodel kitchen, remove non-load bearing wall. n/a maher ordinance | $38,000 |
| Feb 27, 2015 | Completed final sign-off Mar 2016 | 300 Buchanan St | unt #607 - convert from 1 studio unit to 1 bedroom unit. remodel kitchen & bathroom, remove relocate non-load bearing wall. n/a maher ordinanceDetails
unt #607 - convert from 1 studio unit to 1 bedroom unit. remodel kitchen & bathroom, remove relocate non-load bearing wall. n/a maher ordinance | $20,000 |
| Feb 27, 2015 | Never finaled issued Apr 2015, no final | 669 Ellis St | unit #5 remodel - remodel kitchen & fixtures. new wash & dryer. n/a maher ordinanceDetails
unit #5 remodel - remodel kitchen & fixtures. new wash & dryer. n/a maher ordinance | $12,000 |
| Feb 27, 2015 | Completed final sign-off Mar 2016 | 300 Buchanan St | unt #604 - convert from 1 bedroom, 1 bath unit to 2 bedrooms, 2 baths unit, remodel kitchen, remove non-load bearing wall. n/a maher ordinanceDetails
unt #604 - convert from 1 bedroom, 1 bath unit to 2 bedrooms, 2 baths unit, remodel kitchen, remove non-load bearing wall. n/a maher ordinance | $30,000 |
| Feb 27, 2015 | Completed final sign-off Mar 2016 | 300 Buchanan St | unt #307 - convert from studio to 1 bedroom apartment, remodel kitchen & bathroom, remov enon-load bearing wall. n/a maher ordinanceDetails
unt #307 - convert from studio to 1 bedroom apartment, remodel kitchen & bathroom, remov enon-load bearing wall. n/a maher ordinance | $20,000 |
| Feb 26, 2015 | Never finaled issued Feb 2015, no final | 120 Clement St | remodel kitchen and bathroom.Details
remodel kitchen and bathroom. | $10,000 |
| Feb 23, 2015 | Completed final sign-off Jun 2015 | 3035 Baker St | #101. relocate kitchen remove non-load bearing walls. convert kitchen into den and add laundry room and closets.Details
#101. relocate kitchen remove non-load bearing walls. convert kitchen into den and add laundry room and closets. | $20,000 |
| Jan 30, 2015 | Completed final sign-off Sep 2015 | 1690 North Point St | unit #103: revision to app#201405206214. add new post and beam.n/a for the maher.Details
unit #103: revision to app#201405206214. add new post and beam.n/a for the maher. | |
| Jan 20, 2015 | Completed final sign-off Apr 2015 | 511 Fell St | remodel unit #4. remove non-load bearing walls, add one bedroom, relocate kitchen and bathroom. convert exterior storage into laundry room. repair extg deck.Details
remodel unit #4. remove non-load bearing walls, add one bedroom, relocate kitchen and bathroom. convert exterior storage into laundry room. repair extg deck. | $28,000 |
| Jan 15, 2015 | Completed final sign-off May 2015 | 669 Ellis St | unit #10 - remodel kitchen & bathroom. n/a maher ordinanceDetails
unit #10 - remodel kitchen & bathroom. n/a maher ordinance | $10,000 |
| Jan 6, 2015 | Never finaled issued Feb 2015, no final | 3035 Baker St | revision to prevvious app#201409095817. all work done in unit #301. add new bath. relocate washer/dryer and hallway closet.Details
revision to prevvious app#201409095817. all work done in unit #301. add new bath. relocate washer/dryer and hallway closet. | $10,000 |
| Dec 22, 2014 | Completed final sign-off Dec 2015 | 1798 15th Av | reroofingDetails
reroofing | $4,500 |
| Dec 12, 2014 | Never finaled issued Feb 2015, no final | 3035 Baker St | revision to pa 201408295059; all work done in units #302 & #303, add new bath, relocate washer/dryer and hallway closet.Details
revision to pa 201408295059; all work done in units #302 & #303, add new bath, relocate washer/dryer and hallway closet. | $10,000 |
| Nov 13, 2014 | Never finaled issued Nov 2014, no final | 645 Stockton St | remodel 401. relocate kitchen fixutres. remodel (e) bathroom in kind. add washer.dryer. compliance with maher ordinance no. 155-13 not required.Details
remodel 401. relocate kitchen fixutres. remodel (e) bathroom in kind. add washer.dryer. compliance with maher ordinance no. 155-13 not required. | $10,000 |
| Nov 13, 2014 | Completed final sign-off Jan 2015 | 1690 North Point St | comply with nov 201407392, remove and replace damaged ceiling covering 5/8" type throughout, over right side garage (approx 2500 sf), repair damaged electrical wiring & lightings due to collapsed ceiling; maher n/aDetails
comply with nov 201407392, remove and replace damaged ceiling covering 5/8" type throughout, over right side garage (approx 2500 sf), repair damaged electrical wiring & lightings due to collapsed ceiling; maher n/a | $3,000 |
| Nov 6, 2014 | Never finaled issued Mar 2015, no final | 1150 Holloway Av | reconfiguration lower floor plan.Details
reconfiguration lower floor plan. | $15,000 |
| Sep 23, 2014 | Completed final sign-off Jan 2016 | 170 Graystone Tr | to obtain final inspection for work approved under pa#201102089831. all work is complete.Details
to obtain final inspection for work approved under pa#201102089831. all work is complete. | |
| Sep 23, 2014 | Completed final sign-off Sep 2015 | 170 Graystone Tr | to obtain final inspection for work approved under pa#201103212468. all work is complete.Details
to obtain final inspection for work approved under pa#201103212468. all work is complete. | |
| Sep 19, 2014 | Never finaled issued Oct 2014, no final | 720 Baker St | all work done in unit d. remove/add interior non-bearing walls. remodel bath. relocate kitchen. new bedroom. add washer and dryer. lighting to modified spaces.Details
all work done in unit d. remove/add interior non-bearing walls. remodel bath. relocate kitchen. new bedroom. add washer and dryer. lighting to modified spaces. | $40,000 |
| Sep 9, 2014 | Never finaled issued Oct 2014, no final | 324 Larkin St | all work in unit 52. remodel kitchen and bath. new bedrooms, water closet. washer/dryer. demo non bearing interior walls, new non bearing walls. infill skylights, new ligting to modified areasDetails
all work in unit 52. remodel kitchen and bath. new bedrooms, water closet. washer/dryer. demo non bearing interior walls, new non bearing walls. infill skylights, new ligting to modified areas | $75,000 |
| Sep 9, 2014 | Completed final sign-off May 2015 | 3035 Baker St | all work done in unit 301. remove and add interior walls. relocate kitchen. add new bedroom. add washer dryer. new lighting to modified spaces. new roof beamsDetails
all work done in unit 301. remove and add interior walls. relocate kitchen. add new bedroom. add washer dryer. new lighting to modified spaces. new roof beams | $35,000 |
| Sep 9, 2014 | Completed final sign-off Jan 2015 | 669 Ellis St | remodel unit 8 at 3rd fl. remodel e kitchen and bath; upgrading of electrical & plumbing as needed; maher n/aDetails
remodel unit 8 at 3rd fl. remodel e kitchen and bath; upgrading of electrical & plumbing as needed; maher n/a | $9,000 |
| Aug 29, 2014 | Never finaled issued Oct 2014, no final | 3035 Baker St | #303 & #302 revision to appl #2014.0806.3185 - revisoin to closet layout, move washer/dryer, add peninsula to the kitchen, new roof beam. remove in-fill of bath window in unit 202.Details
#303 & #302 revision to appl #2014.0806.3185 - revisoin to closet layout, move washer/dryer, add peninsula to the kitchen, new roof beam. remove in-fill of bath window in unit 202. | |
| Aug 6, 2014 | Never finaled issued Aug 2014, no final | 3035 Baker St | #302 & 303- remove/add interior non-bearing walls, relocate kitchen, new bedroom, add washer/dryer. lighting to modified spaces. remodel bath in #302 only. in-fill bathroom windows in #303, #302.Details
#302 & 303- remove/add interior non-bearing walls, relocate kitchen, new bedroom, add washer/dryer. lighting to modified spaces. remodel bath in #302 only. in-fill bathroom windows in #303, #302. | $42,000 |
| Aug 1, 2014 | Never finaled issued Aug 2014, no final | 2677 Larkin St | unit #101: revision to previous pa 201406027216, demo existing fireplace and 5 in unit #101 only, rearrange (n) bathroom layout; maher n/aDetails
unit #101: revision to previous pa 201406027216, demo existing fireplace and 5 in unit #101 only, rearrange (n) bathroom layout; maher n/a | |
| Jul 11, 2014 | Never finaled issued Jul 2014, no final | 1870 Pacific Av | unit #505 -revision to appl #2013.0906.6127: revision to locations of proposed bedroom & common closets.Details
unit #505 -revision to appl #2013.0906.6127: revision to locations of proposed bedroom & common closets. | |
| Jun 18, 2014 | Never finaled issued Nov 2014, no final | 1690 North Point St | unit 105 - revision to pa #2014.0516.5963: adding new headers. n/a maher ordinancesDetails
unit 105 - revision to pa #2014.0516.5963: adding new headers. n/a maher ordinances | |
| Jun 3, 2014 | Never finaled issued Jun 2014, no final | 645 Stockton St | unit #903 - remove/add interior non-bearing wall. remodel bath, relocate kitchen, new washer/dryer, lighting to remodelled areas. n/a maher ordinance 155-13Details
unit #903 - remove/add interior non-bearing wall. remodel bath, relocate kitchen, new washer/dryer, lighting to remodelled areas. n/a maher ordinance 155-13 | $35,000 |
| Jun 2, 2014 | Completed final sign-off Dec 2014 | 1370 Taylor St | remodel to unit #8. remove interior walls. add and in fill interior walls. relocate kitchen. remodel baths, new bedroom, bath and washer/dryer. new window. lighting to remodel areas.Details
remodel to unit #8. remove interior walls. add and in fill interior walls. relocate kitchen. remodel baths, new bedroom, bath and washer/dryer. new window. lighting to remodel areas. | $100,000 |
| Jun 2, 2014 | Never finaled issued Jun 2014, no final | 2677 Larkin St | 1st floor: unit 101 : demo extg non bearing interior walls, new and infill non-bearing interior walls. relocate kitchen, remodel extg bathroom, new bath room, new bedroom, new washer/dryer, new lighting to remodelled areas. spklrs., f/a sep permit if req'd.Details
1st floor: unit 101 : demo extg non bearing interior walls, new and infill non-bearing interior walls. relocate kitchen, remodel extg bathroom, new bath room, new bedroom, new washer/dryer, new lighting to remodelled areas. spklrs., f/a sep permit if req'd. | $50,000 |
| May 20, 2014 | Completed final sign-off Sep 2015 | 1690 North Point St | unit #103 - remove/add interiors walls, relocate kitchen, remodel bath, new bedroom, add washer/dryer, lighting to modified spaces. n/a maher ordinance 155-13Details
unit #103 - remove/add interiors walls, relocate kitchen, remodel bath, new bedroom, add washer/dryer, lighting to modified spaces. n/a maher ordinance 155-13 | $40,000 |
| May 16, 2014 | Never finaled issued May 2014, no final | 1690 North Point St | on 2nd floor - unit #105 - remove/add interior walls, remodel kitchen & bath. add (n) bath. convert (e) dining into (n) bedroom. add (n) washer/dryer, lighting to modified spaces. new exterior doors to existing roof deck. n/a maher ordinance 155-13Details
on 2nd floor - unit #105 - remove/add interior walls, remodel kitchen & bath. add (n) bath. convert (e) dining into (n) bedroom. add (n) washer/dryer, lighting to modified spaces. new exterior doors to existing roof deck. n/a maher ordinance 155-13 | $50,000 |
| May 12, 2014 | Completed final sign-off Aug 2014 | 828 Jones St | #22- remodel kitchen and bathroom at 2nd floor unit 22Details
#22- remodel kitchen and bathroom at 2nd floor unit 22 | $22,000 |
| May 12, 2014 | Completed final sign-off Sep 2014 | 1290 20th Av | work in unit 204. remove/add interior walls. remodel (e) bathroom, convert (e) dining into (n) bedroom. convert (e) closet into (n) kitchen. new lighting plan for modified spaces. add new washer/dryer unit.Details
work in unit 204. remove/add interior walls. remodel (e) bathroom, convert (e) dining into (n) bedroom. convert (e) closet into (n) kitchen. new lighting plan for modified spaces. add new washer/dryer unit. | $35,000 |
| Apr 8, 2014 | Completed final sign-off May 2016 | 1774 15th Av | remodel kitchen and bathroom, 1/2 bath. no structural work.Details
remodel kitchen and bathroom, 1/2 bath. no structural work. | $8,000 |
| Mar 18, 2014 | Never finaled issued Mar 2014, no final | 1392 Funston Av | to comply with complaint #201458531, itchen & bathroom on apt #2 & #5. tile & cabinet only.Details
to comply with complaint #201458531, itchen & bathroom on apt #2 & #5. tile & cabinet only. | $2,000 |
| Mar 5, 2014 | Completed final sign-off Jun 2014 | 466 14th St | remodel unit 11. add new laundry outlet, remodel kitchen, fixtures and cabinets, relocate bathroom. compliance with ordinance #155-13 requiredDetails
remodel unit 11. add new laundry outlet, remodel kitchen, fixtures and cabinets, relocate bathroom. compliance with ordinance #155-13 required | $20,000 |
| Jun 17, 2013 | Expired or cancelled expired Mar 2016 | 446 33rd Av | revision to approved pa# 200911231869 (under construction). adding (n) foundation at front of bldg as per plan.Details
revision to approved pa# 200911231869 (under construction). adding (n) foundation at front of bldg as per plan. | $2,000 |
| Jun 10, 2013 | Never finaled issued Jun 2013, no final | 170 Graystone Tr | revision to pa#201012317717. correct existing storage room to master bedroom at apt #2 & apt #3, reference nov #201066334. to obtain final inspection for work approved under pa#201102089831.Details
revision to pa#201012317717. correct existing storage room to master bedroom at apt #2 & apt #3, reference nov #201066334. to obtain final inspection for work approved under pa#201102089831. | |
| May 23, 2013 | Completed final sign-off Jun 2013 | 40 Tioga Av | comply with n.o.v. # 201397141. repair lower unit bedroom wall 2ft high. one wall only.Details
comply with n.o.v. # 201397141. repair lower unit bedroom wall 2ft high. one wall only. | $2,500 |
| Mar 19, 2013 | Completed final sign-off Nov 2013 | 73 Terra Vista Av | remodel (e) kitchen & bathroom, remove fireplace, remove kitchen partition wall.Details
remodel (e) kitchen & bathroom, remove fireplace, remove kitchen partition wall. | $29,000 |
| Oct 10, 2012 | Completed final sign-off Oct 2012 | 85 14th St | repair damaged siding to comply with complaint 201178933, item #203Details
repair damaged siding to comply with complaint 201178933, item #203 | $1,000 |
| May 3, 2012 | Completed final sign-off Dec 2012 | 71 Terra Vista Av | comply with nov# 201220321-remove fireplace & kitchen wallDetails
comply with nov# 201220321-remove fireplace & kitchen wall | $1,000 |
| Apr 23, 2012 | Completed final sign-off Sep 2012 | 71 Terra Vista Av | kitchen & bathroom remodel. to comply with complaint #201218121. no change on walls and openings.Details
kitchen & bathroom remodel. to comply with complaint #201218121. no change on walls and openings. | $10,000 |
| Aug 1, 2011 | Completed final sign-off Sep 2011 | 500 33rd Av | repair front building stairway with wood on both side less than 50% in kindDetails
repair front building stairway with wood on both side less than 50% in kind | $5,000 |