C L & Y Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2008 to Aug 2026
- Last 24 months
- 5 permits filed
83 permits since 2000: 72 completed, 4 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2026 | Completed final sign-off Aug 2026 | 2071 Fulton St | repair and replace some bad wood on the deck, less than 50%Details
repair and replace some bad wood on the deck, less than 50% | $2,000 |
| Aug 11, 2026 | In progress issued Aug 2026 | 1148 Mason St | replace kitchen sink,stove and outlets in-kind. replace toilet and vanity. install sub panel, wall heater x4 and outletsDetails
replace kitchen sink,stove and outlets in-kind. replace toilet and vanity. install sub panel, wall heater x4 and outlets | $25,000 |
| Mar 12, 2026 | In progress issued Mar 2026 | 2020 Green St | revision to pa #202506149364 to address exisiting conditions. revision include shifting beam along grid d between line 4&6 on 2/s2.0 to grid f; shift beam along grid d between 2 &4 on 2/s2.0 to line c; remove beam along line 4 between c & f. posts updated with (n) beam locations. (n) reinforced ftgDetails
revision to pa #202506149364 to address exisiting conditions. revision include shifting beam along grid d between line 4&6 on 2/s2.0 to grid f; shift beam along grid d between 2 &4 on 2/s2.0 to line c; remove beam along line 4 between c & f. posts updated with (n) beam locations. (n) reinforced ftg | |
| Aug 28, 2025 | In progress issued Apr 2026 | 717 California St | replace 3 existing packaged hvac units and ducts in kind. roof replacement on sep permitDetails
replace 3 existing packaged hvac units and ducts in kind. roof replacement on sep permit | $150,000 |
| Jun 24, 2025 | In progress issued Jul 2025 | 2020 Green St | revision to pa# 202010066026: revise adu layout and exit; also to perform minor modification to exisisting ground floor patio and stairs in rear yard.Details
revision to pa# 202010066026: revise adu layout and exit; also to perform minor modification to exisisting ground floor patio and stairs in rear yard. | |
| Feb 28, 2024 | Completed final sign-off Nov 2024 | 1400 Ortega St | revision pa #202303143683, no change to structural plans. relocate bathroom on 1/f, remove propsoed wine cellar & media room. enlarge 2/f kitchen counter per plan. relocate bathroom fixtures & door openings for bathroom, closet, & bedroom on 3/f.Details
revision pa #202303143683, no change to structural plans. relocate bathroom on 1/f, remove propsoed wine cellar & media room. enlarge 2/f kitchen counter per plan. relocate bathroom fixtures & door openings for bathroom, closet, & bedroom on 3/f. | |
| Oct 3, 2023 | Completed final sign-off Nov 2024 | 1400 Ortega St | rev to pa202303143683 only: update foundation plan to change method of construction at the rear of the building, r & r (e) damaged foundation along grid b - btwn grids 4 & 5 and provide (n) grade beam at front due to (e) field conditions.Details
rev to pa202303143683 only: update foundation plan to change method of construction at the rear of the building, r & r (e) damaged foundation along grid b - btwn grids 4 & 5 and provide (n) grade beam at front due to (e) field conditions. | |
| Apr 17, 2023 | Completed final sign-off Dec 2023 | 1726 Anza St | unit# 6: to comply with #202304233 and 202304182: demo old sheetrock affected by storm. add waterproof lining, new sheetrock, wooden trims, etc. primer and painting, patching, etc.Details
unit# 6: to comply with #202304233 and 202304182: demo old sheetrock affected by storm. add waterproof lining, new sheetrock, wooden trims, etc. primer and painting, patching, etc. | $3,000 |
| Apr 17, 2023 | Completed final sign-off Dec 2023 | 1726 Anza St | unit #5: to comply with #202304233 and 202304182: demo old sheetrock affected by rain leak from storm. add waterproof lining, new sheetrock, wooden trims, etc. primer and painting, patching, etc.Details
unit #5: to comply with #202304233 and 202304182: demo old sheetrock affected by rain leak from storm. add waterproof lining, new sheetrock, wooden trims, etc. primer and painting, patching, etc. | $3,000 |
| Mar 14, 2023 | Completed final sign-off Nov 2024 | 1400 Ortega St | window replacmeent. foundation repair at ground floor. convert (e) storage into habitable space at g/f. add new ent area, media room, wine cellar & bath at g/f. add 2 new mech rooms; remodel (e) kitchen @2/f for both units. reconfigure int.staircase for both units. add (n) roof deck at 3/f for 1400.Details
window replacmeent. foundation repair at ground floor. convert (e) storage into habitable space at g/f. add new ent area, media room, wine cellar & bath at g/f. add 2 new mech rooms; remodel (e) kitchen @2/f for both units. reconfigure int.staircase for both units. add (n) roof deck at 3/f for 1400. | $200,000 |
| Feb 16, 2023 | Completed final sign-off May 2025 | 852 Clay St | no construction only change of use from retail to herbal medicine shop & acupuncture/ massage establishment only: no work in residential hotel.Details
no construction only change of use from retail to herbal medicine shop & acupuncture/ massage establishment only: no work in residential hotel. | |
| Oct 6, 2022 | Completed final sign-off Oct 2022 | 1814 Union St | repair dryrotted wood at back stairway. any steps, landing etc. less than 50%Details
repair dryrotted wood at back stairway. any steps, landing etc. less than 50% | $5,000 |
| Aug 1, 2022 | Completed final sign-off Aug 2022 | 2071 Fulton St | replace dryrottd 2 to 4 studs in bathroom remodel. only in the bathroom. revision to 202207289437 to comply with #2021179391 only in bathroom. unit 1Details
replace dryrottd 2 to 4 studs in bathroom remodel. only in the bathroom. revision to 202207289437 to comply with #2021179391 only in bathroom. unit 1 | |
| Jul 28, 2022 | Completed final sign-off Aug 2022 | 2071 Fulton St | unit #1. one bathroom remodel. non-structural. repair bathroom drywall ceiling, re-tile bathtub/shower tiles.Details
unit #1. one bathroom remodel. non-structural. repair bathroom drywall ceiling, re-tile bathtub/shower tiles. | $5,000 |
| Apr 27, 2022 | Completed final sign-off May 2022 | 2630 Gough St | replace 3 hollow core doors in building. some in units- for complaint #202289509, item #3.Details
replace 3 hollow core doors in building. some in units- for complaint #202289509, item #3. | $5,000 |
| Apr 27, 2022 | Completed final sign-off May 2022 | 2636 Gough St | replace 6 doors that are hollow cored. replace all front doors (20 min) of units inside. not visible from street.Details
replace 6 doors that are hollow cored. replace all front doors (20 min) of units inside. not visible from street. | $8,000 |
| Aug 20, 2021 | Completed final sign-off Sep 2021 | 1010 Washington St | repairing dryrotted fire escape wood stairs, back of building.Details
repairing dryrotted fire escape wood stairs, back of building. | $2,500 |
| Aug 20, 2021 | Completed final sign-off Oct 2021 | 1215 Bay St | unit 9: remodeling one bathroom: bathtub, faucet, new tiles (floor and wall) non structural. lights per cec 150.0 (k)Details
unit 9: remodeling one bathroom: bathtub, faucet, new tiles (floor and wall) non structural. lights per cec 150.0 (k) | $7,000 |
| Aug 2, 2021 | Completed final sign-off Oct 2021 | 1215 Bay St | apt 6: remodel one kitchen & one bathroom. all work in-kind. layout unchanged. no walls mod or infilled. lights per cenc 150.0(k)Details
apt 6: remodel one kitchen & one bathroom. all work in-kind. layout unchanged. no walls mod or infilled. lights per cenc 150.0(k) | $20,000 |
| Apr 13, 2021 | Completed final sign-off Aug 2021 | 717 California St | sign on north elevation see drawings, "justice for vicha"Details
sign on north elevation see drawings, "justice for vicha" | $5,000 |
| Dec 22, 2020 | Completed final sign-off Feb 2021 | 1215 Bay St | unit #5: remodeling kitchen: new cabinet, kitchen sink, faucet, dishwasher. remodeling bathroom: bathtub, faucet, toilet, bathroom, sink & faucet,Details
unit #5: remodeling kitchen: new cabinet, kitchen sink, faucet, dishwasher. remodeling bathroom: bathtub, faucet, toilet, bathroom, sink & faucet, | $20,000 |
| Nov 9, 2020 | Completed final sign-off Feb 2021 | 1215 Bay St | #10: remodel kitchen, new cabinet, kitchen sink, faucet, dishwasher. remodel bathroom, with bathtub, faucet, toilet, bathroom sink, faucet.Details
#10: remodel kitchen, new cabinet, kitchen sink, faucet, dishwasher. remodel bathroom, with bathtub, faucet, toilet, bathroom sink, faucet. | $30,000 |
| Oct 15, 2020 | Completed final sign-off Oct 2020 | 705 Broadway | shower room across #25: repaitr & repaint windows sill, door & door jam shower room across #29. install grab bars, permit required. to comply with nov#202046002 his. repar tile.Details
shower room across #25: repaitr & repaint windows sill, door & door jam shower room across #29. install grab bars, permit required. to comply with nov#202046002 his. repar tile. | $800 |
| Aug 17, 2020 | Completed final sign-off Oct 2020 | 133 Rolph St | replace 5 windows @ front of builidng. wood or wood interior aluminumm cald - being operation hungDetails
replace 5 windows @ front of builidng. wood or wood interior aluminumm cald - being operation hung | $4,000 |
| Mar 16, 2020 | Completed final sign-off Apr 2023 | 131 Rolph St | add unit per ord 95-17, construct one bedrm, one full bathrm, kitchen, livingrm & diningrm, all work at ground floor.Details
add unit per ord 95-17, construct one bedrm, one full bathrm, kitchen, livingrm & diningrm, all work at ground floor. | $78,000 |
| Feb 20, 2020 | Completed final sign-off Jul 2020 | 1112 Larkin St | unit 203: remodel kitchen, replace faucet. replace kitchen sink & stove. complied with complaint 201900551Details
unit 203: remodel kitchen, replace faucet. replace kitchen sink & stove. complied with complaint 201900551 | $4,000 |
| Feb 20, 2020 | Completed final sign-off Jul 2020 | 1215 Bay St | unit #11: kitchen remodel: relace faucet, kitchen sinks, stove, cabinets and dishwasherDetails
unit #11: kitchen remodel: relace faucet, kitchen sinks, stove, cabinets and dishwasher | $4,000 |
| Aug 28, 2019 | Expired or cancelled expired Feb 2025 | 2270 Francisco St | addition of new unit on 1st fl under ordinance #162-16. unit #70a: 565 sq ft studio with one kitchen,one bath and one study nook/office.Details
addition of new unit on 1st fl under ordinance #162-16. unit #70a: 565 sq ft studio with one kitchen,one bath and one study nook/office. | $20,000 |
| Aug 13, 2019 | Completed final sign-off Feb 2020 | 461 Bush St | new ada complaiant restroom on 1st floorDetails
new ada complaiant restroom on 1st floor | $15,000 |
| Aug 8, 2019 | Completed final sign-off Nov 2019 | 340 Silliman St | to obtain final inspection for work approved under pa#201608054348. all work is complete.Details
to obtain final inspection for work approved under pa#201608054348. all work is complete. | |
| Jul 23, 2019 | Completed final sign-off Aug 2019 | 42 Bernard St | to obtain final inspection for work approved under pa # 201107089770. all work is complete.Details
to obtain final inspection for work approved under pa # 201107089770. all work is complete. | |
| Feb 27, 2019 | Completed final sign-off Mar 2019 | 2071 Fulton St | apt #4: insulation r-30 and cover up the ceiling in the living room, bedroom and kitchen.Details
apt #4: insulation r-30 and cover up the ceiling in the living room, bedroom and kitchen. | $4,000 |
| Feb 20, 2018 | Completed final sign-off Apr 2018 | 1215 Bay St | remove & replace kitchen cabinet & sink counter in-kind. remove & replace washer & dryer same location.Details
remove & replace kitchen cabinet & sink counter in-kind. remove & replace washer & dryer same location. | $10,000 |
| Jan 23, 2018 | Never finaled issued Jan 2018, no final | 1730 Jackson St | remove/replace kitchen cabinets only, replace floor tile @ unit 101 & 400Details
remove/replace kitchen cabinets only, replace floor tile @ unit 101 & 400 | $5,000 |
| Jan 23, 2018 | Completed final sign-off Apr 2018 | 1828 Broadway | remove/replace kitchen cabinets only, replace floor tile @ unit 404Details
remove/replace kitchen cabinets only, replace floor tile @ unit 404 | $5,000 |
| Jan 16, 2018 | Completed final sign-off Feb 2018 | 1140 Pacific Av | common area, repair rear stair in-kind only, less than 50%Details
common area, repair rear stair in-kind only, less than 50% | $2,500 |
| Jan 8, 2018 | Completed final sign-off Dec 2018 | 109 Clement St | apt #1,2,3,5 - remove & replace tiles @ bathrooms & remove kitchen cabinets & replace with new sinks & cabinets, countertops.Details
apt #1,2,3,5 - remove & replace tiles @ bathrooms & remove kitchen cabinets & replace with new sinks & cabinets, countertops. | $15,000 |
| Oct 17, 2017 | Completed final sign-off Oct 2017 | 1991 California St | #404- replace kitchen cabinets, retile @ tub area only. n/a ordinance #155-13Details
#404- replace kitchen cabinets, retile @ tub area only. n/a ordinance #155-13 | $5,000 |
| Oct 17, 2017 | Completed final sign-off Oct 2017 | 1991 California St | #304- to obtain final inspection for work approved under pa#201410088408. all work is complete. n/a ordinance #155-13Details
#304- to obtain final inspection for work approved under pa#201410088408. all work is complete. n/a ordinance #155-13 | |
| Sep 19, 2017 | Completed final sign-off Nov 2017 | 2666 Ocean Av | remodel/replace (e) wet bar & counter w/new counter height not more than 34". & repalce (e) floor tiles w/new in dining area.Details
remodel/replace (e) wet bar & counter w/new counter height not more than 34". & repalce (e) floor tiles w/new in dining area. | $20,000 |
| Sep 14, 2017 | Never finaled issued Sep 2017, no final | 194 Gaven St | 2/f: replace kitchen cabinets.Details
2/f: replace kitchen cabinets. | $1,500 |
| Aug 21, 2017 | Completed final sign-off Aug 2018 | 40 Thrift St | remodel 2 baths: bath #1: install (n) light fixture in (e) location . install (n) toilet in (e) location, install (n) sink & faucets in (e) location, install (n) shower in (e) location. bath #2: install (n) light fixtures & (n) sink & faucet in (e) location. no alter wall, window & door.Details
remodel 2 baths: bath #1: install (n) light fixture in (e) location . install (n) toilet in (e) location, install (n) sink & faucets in (e) location, install (n) shower in (e) location. bath #2: install (n) light fixtures & (n) sink & faucet in (e) location. no alter wall, window & door. | $2,000 |
| Aug 21, 2017 | Completed final sign-off Jun 2019 | 40 Thrift St | permit for kitchen: install (n) light fixture, new cabinets, one new sink & faucet, new hood fan, new cooktop, new oven, new flooring, new refrigerator all in (e) location. remove (e) pocketdoor, remove interior window.Details
permit for kitchen: install (n) light fixture, new cabinets, one new sink & faucet, new hood fan, new cooktop, new oven, new flooring, new refrigerator all in (e) location. remove (e) pocketdoor, remove interior window. | $5,000 |
| Mar 17, 2017 | Completed final sign-off May 2017 | 1215 Bay St | replace cabinets, replace counter top replace sink , replace dishwasher add light fixture add 5 outlets add 1 light switch in unit #1Details
replace cabinets, replace counter top replace sink , replace dishwasher add light fixture add 5 outlets add 1 light switch in unit #1 | $7,000 |
| Feb 21, 2017 | Completed final sign-off Aug 2017 | 578 06th Av | repair rear stair less than 50% in kind. no structural . no front building workDetails
repair rear stair less than 50% in kind. no structural . no front building work | $2,500 |
| Dec 29, 2016 | Completed final sign-off Mar 2017 | 2327 Turk Bl | remodel existing bathroom on floor 2 unit into 2 new baths. new fixtures, finishes, lighting in new floor 2 baths. replace skylightDetails
remodel existing bathroom on floor 2 unit into 2 new baths. new fixtures, finishes, lighting in new floor 2 baths. replace skylight | $18,000 |
| Dec 12, 2016 | Completed final sign-off Jan 2017 | 732 Presidio Av | repair rear stair less than 50% not visible from street.Details
repair rear stair less than 50% not visible from street. | $2,000 |
| Oct 24, 2016 | Completed final sign-off Nov 2016 | 1533 Mason St | to comply with nov# 201638101 item 2, repair stairs, less than 50%Details
to comply with nov# 201638101 item 2, repair stairs, less than 50% | $3,000 |
| Aug 5, 2016 | Never finaled issued Feb 2017, no final | 340 Silliman St | legalize (e) unit per ordinance 43-14 ground floor, 1 bedroom, 1 bath, 1 kitchen.Details
legalize (e) unit per ordinance 43-14 ground floor, 1 bedroom, 1 bath, 1 kitchen. | $10,000 |
| Aug 5, 2016 | Expired or cancelled expired Oct 2022 | 34 Jasper Pl | legalize (e) illegal unit per ordinance# 43-14. ground floor (1) kitchen, 1 bath, 1 studio.Details
legalize (e) illegal unit per ordinance# 43-14. ground floor (1) kitchen, 1 bath, 1 studio. | $10,000 |
| Mar 22, 2016 | Completed final sign-off May 2016 | 1646 Sutter St | unit #403 - comply w/nov #201699932: replace kitchen cabinet, remove & replace tile @ bathroom.Details
unit #403 - comply w/nov #201699932: replace kitchen cabinet, remove & replace tile @ bathroom. | $8,000 |
| Jun 3, 2015 | Completed final sign-off May 2016 | 1991 California St | #101,102,103,104,111,112,202- to comply with his complaints #201524171 remove/replace water damage due to steam boiler system. all walls & ceilings & hardwood floor. also, replace kitchen sink, counter top.Details
#101,102,103,104,111,112,202- to comply with his complaints #201524171 remove/replace water damage due to steam boiler system. all walls & ceilings & hardwood floor. also, replace kitchen sink, counter top. | $35,000 |
| May 1, 2015 | Completed final sign-off Jun 2015 | 2482 45th Av | revision to comply the complaint #201543461 for adding a door in front of the house.Details
revision to comply the complaint #201543461 for adding a door in front of the house. | |
| Apr 20, 2015 | Completed final sign-off Apr 2015 | 39 Spofford St | to comply with complaint#201537191. install knob bars @ water closet & bathrooms facilities per dao-1 only in 4 toilets & 4 showers.Details
to comply with complaint#201537191. install knob bars @ water closet & bathrooms facilities per dao-1 only in 4 toilets & 4 showers. | $1,000 |
| Jan 13, 2015 | Completed final sign-off Apr 2015 | 2482 45th Av | construct 2 new bathrooms, 1 office, family room and storage room on ground floor.Details
construct 2 new bathrooms, 1 office, family room and storage room on ground floor. | $38,000 |
| Dec 19, 2014 | Completed final sign-off Jan 2015 | 1 Dawson Pl | unit #1e - comply w/his nov #201406271, 201409391, 201407861: repair per nov's. no walls moved, removed or added, all layouts unchanged.Details
unit #1e - comply w/his nov #201406271, 201409391, 201407861: repair per nov's. no walls moved, removed or added, all layouts unchanged. | $4,500 |
| Nov 3, 2014 | Completed final sign-off Nov 2014 | 229 Columbus Av | install new service counter & ice machines.Details
install new service counter & ice machines. | $5,000 |
| Sep 5, 2014 | Completed final sign-off Sep 2014 | 1720 Stockton St | renew for final 201211274946Details
renew for final 201211274946 | |
| Jun 27, 2014 | Never finaled issued Jul 2014, no final | 1310 Noriega St | construct new juice bar/counter in dinning area. remove accoustical ceiling tile and support system.Details
construct new juice bar/counter in dinning area. remove accoustical ceiling tile and support system. | $15,000 |
| Apr 25, 2014 | Completed final sign-off May 2014 | 705 Broadway | comply with complaint #201467141, item #2 for provide grab bars in all common area, bathroom, toilet rooms, ordiance 029-13Details
comply with complaint #201467141, item #2 for provide grab bars in all common area, bathroom, toilet rooms, ordiance 029-13 | $500 |
| Apr 25, 2014 | Completed final sign-off May 2014 | 858 Washington St | comply with complaint #201463451, item #2 for provide grab bars in all common area, bathroom, toilet rooms, ordiance 029-13Details
comply with complaint #201463451, item #2 for provide grab bars in all common area, bathroom, toilet rooms, ordiance 029-13 | $1,500 |
| Mar 21, 2014 | Completed final sign-off Apr 2014 | 1405 Golden Gate Av | remodel kitchen, replace cabinet only & re-tile bathroom. electrical & plumbing permit by other, no changes to door or windows under this permit. to comply with cc# 7453Details
remodel kitchen, replace cabinet only & re-tile bathroom. electrical & plumbing permit by other, no changes to door or windows under this permit. to comply with cc# 7453 | $6,000 |
| Mar 21, 2014 | Completed final sign-off Apr 2014 | 1403 Golden Gate Av | comply with 3r cc-7453 no changes to doors or windows under this permit.Details
comply with 3r cc-7453 no changes to doors or windows under this permit. | $500 |
| Sep 23, 2013 | Completed final sign-off Jan 2014 | 188 Stratford Dr | remove and replace kitchen cabinets and counterDetails
remove and replace kitchen cabinets and counter | $5,000 |
| Jul 8, 2013 | Completed final sign-off May 2014 | 91 Aptos Av | remodel e 2 baths and kitchen at 2nd fl. add 1/2 bath. ground floor convert e social room into 2 bedrooms. remove e bathrm and construct new family room and 1 new bathrm. all work at gr flDetails
remodel e 2 baths and kitchen at 2nd fl. add 1/2 bath. ground floor convert e social room into 2 bedrooms. remove e bathrm and construct new family room and 1 new bathrm. all work at gr fl | $65,000 |
| May 31, 2013 | Completed final sign-off Dec 2013 | 129 Stratford Dr | remove -repair & replace dry stucco walls @ rear building. approx 900 sqft. no structural.Details
remove -repair & replace dry stucco walls @ rear building. approx 900 sqft. no structural. | $5,000 |
| May 9, 2013 | Completed final sign-off Jul 2013 | 728 Pacific Av | install food service equipment & counters for tea lounge.Details
install food service equipment & counters for tea lounge. | $15,000 |
| Mar 4, 2013 | Completed final sign-off Sep 2013 | 1404 Stockton St | remodeling unit # 1416 stockton street only (residential for bathroom and kitchen in kind. no structural work.Details
remodeling unit # 1416 stockton street only (residential for bathroom and kitchen in kind. no structural work. | $12,000 |
| Feb 4, 2013 | Completed final sign-off Jul 2013 | 129 Stratford Dr | construct one new bathroom & upgrade (e) family room at ground floor. construct new deck w/staircase at rear of bldg ( size aprox 17'-0" x 10"-0").Details
construct one new bathroom & upgrade (e) family room at ground floor. construct new deck w/staircase at rear of bldg ( size aprox 17'-0" x 10"-0"). | $23,000 |
| Feb 4, 2013 | Completed final sign-off Jul 2013 | 129 Stratford Dr | remodel (e) bathroom/kitchen at second floor, remodel (e) bathroom in kind at third floor & re-wire elect lighting. ref pa #2013.0204.9366.Details
remodel (e) bathroom/kitchen at second floor, remodel (e) bathroom in kind at third floor & re-wire elect lighting. ref pa #2013.0204.9366. | $35,000 |
| Jan 22, 2013 | Completed final sign-off May 2013 | 2435 38th Av | legalize 2 bed rooms, one bath room and construct one new bath. all work at ground floor.Details
legalize 2 bed rooms, one bath room and construct one new bath. all work at ground floor. | $32,000 |
| Nov 27, 2012 | Expired or cancelled expired May 2014 | 1720 Stockton St | replace kitchen cabinets only and repair damage tile at bathroom only. no electrical and plumbing workDetails
replace kitchen cabinets only and repair damage tile at bathroom only. no electrical and plumbing work | $3,000 |
| May 3, 2012 | Completed final sign-off Sep 2012 | 2816 Judah St | repair dry rot around garage door area, and 2 window sills, repair 30 sq.ft. stuccoDetails
repair dry rot around garage door area, and 2 window sills, repair 30 sq.ft. stucco | $2,500 |
| Dec 16, 2011 | Completed final sign-off Feb 2012 | 750 Pacific Av | tenant improvement of ground floor and no exterior work. mep under separate permit, remodel (e) bathroom.Details
tenant improvement of ground floor and no exterior work. mep under separate permit, remodel (e) bathroom. | $20,000 |
| Dec 14, 2011 | Completed final sign-off Jan 2012 | 2816 Judah St | repair & replace dry rot rear deck & rear stair (less than 50%)Details
repair & replace dry rot rear deck & rear stair (less than 50%) | $500 |
| Jul 25, 2011 | Completed final sign-off Oct 2011 | 266 22nd Av | construct one bedroom (in-fill under (e) sunroom), family room & one full bathroom. all work at ground floor.Details
construct one bedroom (in-fill under (e) sunroom), family room & one full bathroom. all work at ground floor. | $32,000 |
| Apr 20, 2011 | Completed final sign-off May 2011 | 2823 Golden Gate Av | to obtain final inspection for work approved under pa 200408242426; all work is completeDetails
to obtain final inspection for work approved under pa 200408242426; all work is complete | |
| Jan 11, 2011 | Completed final sign-off Jan 2011 | 905 Kearny St | comply with nov 200923188 and 200923187; remove awning and repair wire to sign (ew20091005742)Details
comply with nov 200923188 and 200923187; remove awning and repair wire to sign (ew20091005742) | $500 |
| Nov 17, 2010 | Completed final sign-off Jan 2011 | 285 Castenada Av | remodeling the bathrooms & kitchen per plan.Details
remodeling the bathrooms & kitchen per plan. | $10,000 |
| Aug 3, 2010 | Completed final sign-off Dec 2010 | 679 Edinburgh St | legalize (e) one bedroom, storage rooms and construct one new full bathroom at ground floorDetails
legalize (e) one bedroom, storage rooms and construct one new full bathroom at ground floor | $38,000 |
| Oct 14, 2009 | Completed final sign-off Dec 2010 | 901 Kearny St | repair fire damage ,painting, cleanup, disposing of debris,repairing & replacing door,door jame, rapairing, replacing total of 7 windows & frames,r/r some flooring,reinforcing number of joist and studes. no structural and exterior work. no wndw at front. replace wndw in kind.Details
repair fire damage ,painting, cleanup, disposing of debris,repairing & replacing door,door jame, rapairing, replacing total of 7 windows & frames,r/r some flooring,reinforcing number of joist and studes. no structural and exterior work. no wndw at front. replace wndw in kind. | $125,000 |
| Nov 14, 2008 | Completed final sign-off Nov 2008 | 1184 Jackson St | comply with his nov# 200877062, dated 10/21/08. provide report of test for fire escape. sheetrock ceiling @ laundry & garage room. provide self-closing at exterior door @ garage door.Details
comply with his nov# 200877062, dated 10/21/08. provide report of test for fire escape. sheetrock ceiling @ laundry & garage room. provide self-closing at exterior door @ garage door. | $500 |
| Oct 31, 2008 | Completed final sign-off Nov 2008 | 6705 California St | comply w/ his nov #200870440, for add handrails @ rear stair, and remove storage items at the rear stair and under the rear stair.Details
comply w/ his nov #200870440, for add handrails @ rear stair, and remove storage items at the rear stair and under the rear stair. | $500 |