C & L Construction And Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Jun 2011 to Aug 2023
- Last 24 months
- 0 permits filed
49 permits since 2000: 46 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2023 | Completed final sign-off Dec 2023 | 3120 Kirkham St | revision to # 202306270918: replace additional 700 sqft stucco at west side of house.Details
revision to # 202306270918: replace additional 700 sqft stucco at west side of house. | $15,000 |
| Jun 27, 2023 | Completed final sign-off Dec 2023 | 3120 Kirkham St | front facade - stucco in front of building (approx. 700 sq. ft.) in kind.Details
front facade - stucco in front of building (approx. 700 sq. ft.) in kind. | $21,000 |
| Oct 7, 2022 | Completed final sign-off Aug 2023 | 1842 18th Av | in kind remodel- 2 (e) bathrooms and (e) kitchen: no change in layouts or removing walls. no structural work.Details
in kind remodel- 2 (e) bathrooms and (e) kitchen: no change in layouts or removing walls. no structural work. | $50,000 |
| Oct 14, 2021 | Completed final sign-off Sep 2022 | 725 Judah St | comply w/ compaint #202182799: remodel (e) kitchen, bathroom, & re-wire electrical. all work at 2nd floor (725 judah st.)Details
comply w/ compaint #202182799: remodel (e) kitchen, bathroom, & re-wire electrical. all work at 2nd floor (725 judah st.) | $32,000 |
| Nov 5, 2019 | Completed final sign-off Dec 2020 | 773 Divisadero St | change of use from e retail to foot massage salon. no full body massage. no construction. building permit to document change of use.Details
change of use from e retail to foot massage salon. no full body massage. no construction. building permit to document change of use. | $4,000 |
| Oct 9, 2019 | Completed final sign-off Jun 2020 | 3537 Ortega St | construct 1 bedrm, 1 full bath rm & upgrade (e) bedrm @ ground fl; remove (e) kitchen, bathrm. add 1 new bath rm & convert (e) living rm to bed rm @ 2nd flDetails
construct 1 bedrm, 1 full bath rm & upgrade (e) bedrm @ ground fl; remove (e) kitchen, bathrm. add 1 new bath rm & convert (e) living rm to bed rm @ 2nd fl | $62,000 |
| May 4, 2018 | Completed final sign-off Jul 2018 | 1366 18th Av | re-stucco in front of building (approximately 400 sf), in-kind, same texture, color.Details
re-stucco in front of building (approximately 400 sf), in-kind, same texture, color. | $15,000 |
| Apr 13, 2018 | Completed final sign-off Apr 2018 | 1366 18th Av | revision under pa 2017-01208-5870 - convert half bath room to full bathroom @ 2nd floor. relocate bathroom & deleted hall way in garage at ground floor. construct new deck with staircase at rear of building (size approx 17.5'x8")Details
revision under pa 2017-01208-5870 - convert half bath room to full bathroom @ 2nd floor. relocate bathroom & deleted hall way in garage at ground floor. construct new deck with staircase at rear of building (size approx 17.5'x8") | $18,000 |
| Dec 8, 2017 | Completed final sign-off Jul 2018 | 1368 18th Av | remodel (e) bathroom & add one full bathroom & remove/replace sheetrock w/new. all work at 3rd floor.Details
remodel (e) bathroom & add one full bathroom & remove/replace sheetrock w/new. all work at 3rd floor. | $34,000 |
| Dec 8, 2017 | Completed final sign-off Jul 2018 | 1366 18th Av | remodel (e) bathroom & add one half bathroom at 2nd floor. construct two bedrooms, one full bathroom & laudnry room at ground floor.Details
remodel (e) bathroom & add one half bathroom at 2nd floor. construct two bedrooms, one full bathroom & laudnry room at ground floor. | $42,000 |
| Jun 9, 2017 | Completed final sign-off Dec 2017 | 250 12th Av | #3, interior work- remove/replace (e) sheet rock, insulation with new.Details
#3, interior work- remove/replace (e) sheet rock, insulation with new. | $18,000 |
| May 5, 2017 | Completed final sign-off Jan 2018 | 1849 24th Av | construct two bedrooms, one full bath room & laundry area at ground floor. construct new deck at rear of bldg. approx 30" above grade, size approx. 18'x 9'Details
construct two bedrooms, one full bath room & laundry area at ground floor. construct new deck at rear of bldg. approx 30" above grade, size approx. 18'x 9' | $58,000 |
| Apr 21, 2017 | Completed final sign-off Jan 2018 | 2993 Lake St | remove/replace existing stucco with new. approximately 700 sq ft at side and front. (in-kind)Details
remove/replace existing stucco with new. approximately 700 sq ft at side and front. (in-kind) | $20,000 |
| Mar 10, 2017 | Completed final sign-off Sep 2019 | 1427 Ulloa St | replace five front windows in-kind with wood-clad windows.Details
replace five front windows in-kind with wood-clad windows. | $2,000 |
| Mar 3, 2017 | Completed final sign-off Jan 2018 | 1849 24th Av | remodel (e) kitchen, bathroom, add 1 new bath room & convert (e) dining room to office @ 2nd floor; construct new deck with stair case at rear of building (size approx 19'-0x 6'-0")Details
remodel (e) kitchen, bathroom, add 1 new bath room & convert (e) dining room to office @ 2nd floor; construct new deck with stair case at rear of building (size approx 19'-0x 6'-0") | $38,000 |
| Feb 14, 2017 | Completed final sign-off Sep 2019 | 1427 Ulloa St | relocate (e) kitchen, bathroom. add 1 new bathroom, bedroom, and 2 roof skylight & relocate interior staircase @ 2nd floor; construction 1 bedroom, media room, laundry room & 1 full bath room @ ground floor; construction new deck at rear of bldg (20'x50'); construct new concrete retaining wall atDetails
relocate (e) kitchen, bathroom. add 1 new bathroom, bedroom, and 2 roof skylight & relocate interior staircase @ 2nd floor; construction 1 bedroom, media room, laundry room & 1 full bath room @ ground floor; construction new deck at rear of bldg (20'x50'); construct new concrete retaining wall at | $92,000 |
| Dec 16, 2016 | Completed final sign-off Jul 2017 | 171 Oxford St | kitchen remodel, replace cabinets, counter, fixtures, add 1 new full bath. all work 2nd flDetails
kitchen remodel, replace cabinets, counter, fixtures, add 1 new full bath. all work 2nd fl | $26,000 |
| Nov 28, 2016 | Completed final sign-off Apr 2017 | 2030 18th Av | revision to pa 2016-0726-3321 revision bathroom & interior staircase at 2nd floorDetails
revision to pa 2016-0726-3321 revision bathroom & interior staircase at 2nd floor | |
| Oct 21, 2016 | Completed final sign-off Jul 2017 | 1436 Ulloa St | construct new deck with staircase at rear of building, size approx. 21'6"x8'Details
construct new deck with staircase at rear of building, size approx. 21'6"x8' | $8,000 |
| Jul 26, 2016 | Completed final sign-off Apr 2017 | 2030 18th Av | remodel (e) kitchen, bathrn, convert 1/2 bath into full.. re-wire elect at 2nd floor. const 2 bedrooms and 1 full bathrm, play room & laundry room at ground level. construct new concrete wall at rear yard. rebuild (e) deck at rearDetails
remodel (e) kitchen, bathrn, convert 1/2 bath into full.. re-wire elect at 2nd floor. const 2 bedrooms and 1 full bathrm, play room & laundry room at ground level. construct new concrete wall at rear yard. rebuild (e) deck at rear | $82,000 |
| Apr 4, 2016 | Completed final sign-off Feb 2017 | 1783 27th Av | construct two bedrooms, one full bathroom & laundry at ground floor.Details
construct two bedrooms, one full bathroom & laundry at ground floor. | $39,000 |
| Feb 22, 2016 | Completed final sign-off Nov 2016 | 1236 Alemany Bl | construct 2 bedrooms, 2 full bath rooms, & laundry room all work at ground floor. no work visible from street.Details
construct 2 bedrooms, 2 full bath rooms, & laundry room all work at ground floor. no work visible from street. | $52,000 |
| Dec 11, 2015 | Completed final sign-off Mar 2017 | 756 05th Av | relocate kitchen, convert (e) office, kitchen space into bedroom, bathroom, re-wire electrical, replace sheetrock w/insulation at 2nd floor. repair exisitng stair case in kind at front of bldg.Details
relocate kitchen, convert (e) office, kitchen space into bedroom, bathroom, re-wire electrical, replace sheetrock w/insulation at 2nd floor. repair exisitng stair case in kind at front of bldg. | $32,000 |
| Dec 1, 2015 | Completed final sign-off Mar 2017 | 2363 32nd Av | relocate interior stairs per plan, infill (e) lightwell on 1st & 2nd; add 2 bedrooms, family room, mudroom & full bath on 1st floor; add patio at rear building on 1st floor. reconfigure layout on 2nd floor. extension (e) deck on 2nd floor. add 3 skylights at 2nd floor. replace (e) fire place withDetails
relocate interior stairs per plan, infill (e) lightwell on 1st & 2nd; add 2 bedrooms, family room, mudroom & full bath on 1st floor; add patio at rear building on 1st floor. reconfigure layout on 2nd floor. extension (e) deck on 2nd floor. add 3 skylights at 2nd floor. replace (e) fire place with | $10,000 |
| Aug 4, 2015 | Completed final sign-off Mar 2016 | 26 Tingley St | legalize existing bedroom, multi-room, bathrm, storage rm, and laundry rm at ground floor.Details
legalize existing bedroom, multi-room, bathrm, storage rm, and laundry rm at ground floor. | $40,000 |
| Jul 14, 2015 | Completed final sign-off Apr 2016 | 2658 24th Av | remodel (e) kitchen, 2 bathrooms & re-wire elect @ 2nd flr,construct 2 bedrms,one full bathrm, family rm & laundry area @grnd flr,construct new conc retaining wall at rear yard, in-fill under (e) bedroom @ rear.Details
remodel (e) kitchen, 2 bathrooms & re-wire elect @ 2nd flr,construct 2 bedrms,one full bathrm, family rm & laundry area @grnd flr,construct new conc retaining wall at rear yard, in-fill under (e) bedroom @ rear. | $80,000 |
| Jun 2, 2015 | Completed final sign-off Oct 2015 | 1726 22nd Av | remove and replace partial stucco with new in kind. at front of building. (approx. 150 sq ft)Details
remove and replace partial stucco with new in kind. at front of building. (approx. 150 sq ft) | $10,000 |
| Jun 2, 2015 | Completed final sign-off Sep 2015 | 1528 36th Av | replace two front windows within the existing openings - wood interior aluminum exterior cladding.Details
replace two front windows within the existing openings - wood interior aluminum exterior cladding. | $2,480 |
| Mar 2, 2015 | Completed final sign-off Oct 2015 | 3044 20th Av | construct new bedroom, half bathroom at ground floor, remodel existing kitchen, replace counter, cabinets & fixtures at 2/f.Details
construct new bedroom, half bathroom at ground floor, remodel existing kitchen, replace counter, cabinets & fixtures at 2/f. | $28,000 |
| Jan 16, 2015 | Completed final sign-off Oct 2015 | 1726 22nd Av | remodel kitchen & two bathroom at 2nd floor. construct one bedroom, family room, laundry area & one full bathroom at ground floor. contruct new deck w/staircase at rear of bldg ( size approx 15'-0" x 7'-0")Details
remodel kitchen & two bathroom at 2nd floor. construct one bedroom, family room, laundry area & one full bathroom at ground floor. contruct new deck w/staircase at rear of bldg ( size approx 15'-0" x 7'-0") | $68,000 |
| Oct 23, 2014 | Completed final sign-off Aug 2015 | 244 Magellan Av | increase value on pa# 201401146194 per correction notice dated 8/25/14Details
increase value on pa# 201401146194 per correction notice dated 8/25/14 | $50,000 |
| Oct 23, 2014 | Never finaled issued Oct 2014, no final | 2993 Lake St | increase valuation of work under pa# 201403271841, 201401287199, 201401166424, 201404082663 & 201409186639 per correction notice dated 10/7/14.Details
increase valuation of work under pa# 201403271841, 201401287199, 201401166424, 201404082663 & 201409186639 per correction notice dated 10/7/14. | $150,000 |
| Sep 22, 2014 | Completed final sign-off Oct 2015 | 3044 20th Av | convert (e) bathroom into 2 full bathroom, all work at 2nd flrDetails
convert (e) bathroom into 2 full bathroom, all work at 2nd flr | $15,000 |
| May 12, 2014 | Completed final sign-off Aug 2015 | 244 Magellan Av | revision to appl #2014.0114.6194: re-arrange fixtures layout for master bathroom. relcoate (e) bathroom & add one new bathroom at 3rd floor. upgrade/underpin partial (e) foundation 6'-0" section by seque marked on plan & increase the cost of job.Details
revision to appl #2014.0114.6194: re-arrange fixtures layout for master bathroom. relcoate (e) bathroom & add one new bathroom at 3rd floor. upgrade/underpin partial (e) foundation 6'-0" section by seque marked on plan & increase the cost of job. | $50,000 |
| Apr 8, 2014 | Completed final sign-off Dec 2015 | 2993 Lake St | revision to appl #2014.0116.6424 & 2014.0128.7199: delete one full bathroom at 2nd floor; change bathtub to shower stall at 1st floor; convert back to original office & bathroom at lower floor; replace 32 (e) windows w/new in kind (clad wood).Details
revision to appl #2014.0116.6424 & 2014.0128.7199: delete one full bathroom at 2nd floor; change bathtub to shower stall at 1st floor; convert back to original office & bathroom at lower floor; replace 32 (e) windows w/new in kind (clad wood). | |
| Jan 28, 2014 | Completed final sign-off Dec 2015 | 2993 Lake St | remove/rebuild bathroom. relocate water heater/furnace and replace extg sheet rock with new r-13 insulation. all work at ground floor.Details
remove/rebuild bathroom. relocate water heater/furnace and replace extg sheet rock with new r-13 insulation. all work at ground floor. | $22,000 |
| Jan 16, 2014 | Completed final sign-off Dec 2015 | 2993 Lake St | remodel (e) kitchen, replace counter, cabinets, sink & relocate (e) bathroom at first floor. relocate two (e) bathroom & add one new bathroom at 2nd floor. re-wire elect & lighting for 1st & 2nd floors.Details
remodel (e) kitchen, replace counter, cabinets, sink & relocate (e) bathroom at first floor. relocate two (e) bathroom & add one new bathroom at 2nd floor. re-wire elect & lighting for 1st & 2nd floors. | $52,000 |
| Jan 14, 2014 | Completed final sign-off Aug 2015 | 244 Magellan Av | remodel one (e) bathrm. replace counter, cabinets, sink & flooring at third fl. re-built (e) staircase w/ (n) from 2nd fl to ground fl. remove/rebuilt (e) bedrm, laundry & one full bathrm at ground fl. repair (e) front staircase. replace (e) wood rotten w/ new in kind. (possible damage by water).Details
remodel one (e) bathrm. replace counter, cabinets, sink & flooring at third fl. re-built (e) staircase w/ (n) from 2nd fl to ground fl. remove/rebuilt (e) bedrm, laundry & one full bathrm at ground fl. repair (e) front staircase. replace (e) wood rotten w/ new in kind. (possible damage by water). | $36,000 |
| Sep 13, 2013 | Completed final sign-off Jun 2014 | 150 Gellert Dr | revision to appl #201307182120 - move shear wall line to gridline 1.1 @ foundation line, shorten shear wall @ gridline 5 to 4.Details
revision to appl #201307182120 - move shear wall line to gridline 1.1 @ foundation line, shorten shear wall @ gridline 5 to 4. | |
| Jul 18, 2013 | Completed final sign-off Jun 2014 | 150 Gellert Dr | kitchen remodel, demolition work, interior wall removal. structural work related to area of remodel, mechanical, plumbing & electrical work related to area of remodel. half bath remodel.Details
kitchen remodel, demolition work, interior wall removal. structural work related to area of remodel, mechanical, plumbing & electrical work related to area of remodel. half bath remodel. | $55,000 |
| Jul 1, 2013 | Completed final sign-off Jun 2014 | 150 Gellert Dr | 1)extg master suite remodel:bedroom,bath, closet, walk in closet. 2)extg bath 2 remodel. 3)mechanical, plumbing, and electrical 100 amp panel and service to 200 amp panel & server.Details
1)extg master suite remodel:bedroom,bath, closet, walk in closet. 2)extg bath 2 remodel. 3)mechanical, plumbing, and electrical 100 amp panel and service to 200 amp panel & server. | $25,000 |
| Jun 4, 2013 | Completed final sign-off Aug 2013 | 846 Junipero Serra Bl | convert 1 bathroom into 2 bathrooms on the 2nd floorDetails
convert 1 bathroom into 2 bathrooms on the 2nd floor | $16,000 |
| May 14, 2013 | Completed final sign-off Oct 2013 | 563 18th Av | remodel (e) kitchen, remove/relocate 2 bathrooms at 2nd floor & construct new staircase from 2nd floor to ground floor. re-arrange (e) bedoorm, 1 bathroom, family room at the ground floorDetails
remodel (e) kitchen, remove/relocate 2 bathrooms at 2nd floor & construct new staircase from 2nd floor to ground floor. re-arrange (e) bedoorm, 1 bathroom, family room at the ground floor | $65,000 |
| Apr 11, 2013 | Completed final sign-off Nov 2013 | 1718 27th Av | 1. remodel kitchen/bath rm & add one new bath rm at 2nd fl. 2. re-arrange one bath rm, one bed rm, office, family rm, laundry rm & storage at ground fl. 3. construct new deck w/staircase at rear of bldg. size approx 19'-0"x7'-0".Details
1. remodel kitchen/bath rm & add one new bath rm at 2nd fl. 2. re-arrange one bath rm, one bed rm, office, family rm, laundry rm & storage at ground fl. 3. construct new deck w/staircase at rear of bldg. size approx 19'-0"x7'-0". | $45,000 |
| Apr 11, 2013 | Never finaled issued Apr 2013, no final | 1718 27th Av | upgrade / under-pin partial (e) foundation at ground floor.Details
upgrade / under-pin partial (e) foundation at ground floor. | $8,000 |
| Jan 8, 2013 | Completed final sign-off Jul 2013 | 26 Tingley St | 1. remodeling kitchen add 6 recess lights. 2. remodel bathroom, 3. add 20 recess lights. 10 in dining room, and 10 in living room. 4. replace 2 windows in bedroom, u factor is 0.40. and 1 bathroom, not visible from street. new fan connecting to existing duct work. kitchen recess lights to be heDetails
1. remodeling kitchen add 6 recess lights. 2. remodel bathroom, 3. add 20 recess lights. 10 in dining room, and 10 in living room. 4. replace 2 windows in bedroom, u factor is 0.40. and 1 bathroom, not visible from street. new fan connecting to existing duct work. kitchen recess lights to be he | $22,000 |
| Sep 11, 2012 | Completed final sign-off Nov 2012 | 1751 Lake St | siding (wood) on exterior wall on top level at back of property. not visible from street, replace in kind.Details
siding (wood) on exterior wall on top level at back of property. not visible from street, replace in kind. | $3,000 |
| Jul 9, 2012 | Never finaled issued Jul 2012, no final | 150 28th St | change cabinets & counter top in kitchen. change sink in bathroom. no change on walls and openings.Details
change cabinets & counter top in kitchen. change sink in bathroom. no change on walls and openings. | $2,800 |
| Jun 6, 2011 | Completed final sign-off Oct 2011 | 1723 34th Av | construct one bedroom, bathroom & laundry rm. all work at ground floor. enlarge (e) at rear of bldg. (approx 30" height).Details
construct one bedroom, bathroom & laundry rm. all work at ground floor. enlarge (e) at rear of bldg. (approx 30" height). | $28,000 |