C K Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2015 to Sep 2021
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2021 | Completed final sign-off Apr 2023 | 126 Naglee Av | convert the existing lower level conditioned space to attached adu. new adu added per government code section 65852.2. relocate existing main power panel. add one new sub-power panel for adu.per ordinance #162-16 move washer/dryer to garage.Details
convert the existing lower level conditioned space to attached adu. new adu added per government code section 65852.2. relocate existing main power panel. add one new sub-power panel for adu.per ordinance #162-16 move washer/dryer to garage. | $40,000 |
| May 1, 2019 | Completed final sign-off Aug 2019 | 1471 Jackson St | unit #3. kitchen and bathroom remodeling.replace kitchen wall finishes, sheetrock. replace electrical wiring, add insulation on outside kitchen walls.replace new cabinet, replace plumbing valve,bathroom wall and sheetrock.replace electrical wiring, replace bathroom,replace refinish flooring.in kind.Details
unit #3. kitchen and bathroom remodeling.replace kitchen wall finishes, sheetrock. replace electrical wiring, add insulation on outside kitchen walls.replace new cabinet, replace plumbing valve,bathroom wall and sheetrock.replace electrical wiring, replace bathroom,replace refinish flooring.in kind. | $37,300 |
| Jan 14, 2015 | Never finaled issued Mar 2015, no final | 1632 Ulloa St | 1st flr: add one bedroom,1 family, 1 full bath & 1 storage, build new interior staircase to connect 1st flr and 2nd flr, 2nd flr: remodel kitchen and bathroom.Details
1st flr: add one bedroom,1 family, 1 full bath & 1 storage, build new interior staircase to connect 1st flr and 2nd flr, 2nd flr: remodel kitchen and bathroom. | $60,000 |