C D R Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2010 to Sep 2026
- Last 24 months
- 4 permits filed
61 permits since 2000: 40 completed, 3 in progress, 16 never finaled, 2 expired or cancelled.
Of the 16 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 1715 22nd St | exterior renovation of side and rear of bldg at 1st flr only, including new windows on east and south elevation and new walls, roof, and roof deck. new kitchen and bath at 1st flr, new enlarged bath at 2nd flr. new finishes. reconfigure space allocated to each duplex and rated separation as requireDetails
exterior renovation of side and rear of bldg at 1st flr only, including new windows on east and south elevation and new walls, roof, and roof deck. new kitchen and bath at 1st flr, new enlarged bath at 2nd flr. new finishes. reconfigure space allocated to each duplex and rated separation as require | $250,000 |
| Sep 18, 2026 | In progress issued Sep 2026 | 1838 Golden Gate Av | kithen and bath renovation. interior renovation,include new finishes, mill work, lighting, electrical, and appliances. new plumbing fixtures new windows in (e) window opening to exterior rear yard some minor non load bearing walls to be removed.Details
kithen and bath renovation. interior renovation,include new finishes, mill work, lighting, electrical, and appliances. new plumbing fixtures new windows in (e) window opening to exterior rear yard some minor non load bearing walls to be removed. | $250,000 |
| Aug 4, 2026 | Completed final sign-off Sep 2026 | 132 Locust St | demo & hauling of old bath tub & change for new walkin shower. plumbing for new shower drain, change existing shower head, shower pan & tiling.Details
demo & hauling of old bath tub & change for new walkin shower. plumbing for new shower drain, change existing shower head, shower pan & tiling. | $6,000 |
| Feb 18, 2026 | In progress issued Feb 2026 | 2051 33rd Av | remodel bathroom in kind, new toilet, shower and tub locations to stay the same, shower pan, new tiles on floor and walls, new lighting 3 cans 1 sconse and 1 new gfi outlet, painting.Details
remodel bathroom in kind, new toilet, shower and tub locations to stay the same, shower pan, new tiles on floor and walls, new lighting 3 cans 1 sconse and 1 new gfi outlet, painting. | $20,000 |
| Feb 22, 2024 | Completed final sign-off May 2024 | 1473 Pine St | extg door connecting resident to commercial to be infilled, replace extg furnace with new one, install lovered door at furnace closet, new door at rear of building to seperate the garage. remove wall in laundry room. non-structural. replace washer and dryer with new. to comply with nov #202288730Details
extg door connecting resident to commercial to be infilled, replace extg furnace with new one, install lovered door at furnace closet, new door at rear of building to seperate the garage. remove wall in laundry room. non-structural. replace washer and dryer with new. to comply with nov #202288730 | $1,500 |
| Aug 23, 2023 | Never finaled issued Sep 2023, no final | 3655 Lawton St | revision to pa# 202208301598. removal of previously approved skylights, roof access hatch + alteration of window operation. update to title-24 forms based on revision to remove heating element from mechanical system + altered hood specs.Details
revision to pa# 202208301598. removal of previously approved skylights, roof access hatch + alteration of window operation. update to title-24 forms based on revision to remove heating element from mechanical system + altered hood specs. | |
| Jun 30, 2023 | Completed final sign-off Dec 2024 | 3645 Lawton St | new kitchen hood and mechanical system, new counter seating, new skylights, new lighting, new window, new storage cabinets, new wall partioning off dishwasing area. new restaurant.Details
new kitchen hood and mechanical system, new counter seating, new skylights, new lighting, new window, new storage cabinets, new wall partioning off dishwasing area. new restaurant. | $35,000 |
| Apr 13, 2023 | Completed final sign-off Apr 2023 | 499 Dolores St | revision to pa# 202201206342 change floor plan to add dry storage area two (n) racks by walkin cooler. no other changes addedDetails
revision to pa# 202201206342 change floor plan to add dry storage area two (n) racks by walkin cooler. no other changes added | |
| Sep 1, 2022 | Completed final sign-off Feb 2025 | 1546 46th Av | 324 sqft addition to existing lower level at rear. maximize lower level space to create a master suite with full closet, skylights, and remodel bathroom. remodel (e) laundry room. remove interior column in lower level. create hallway to get from stairs to outside.Details
324 sqft addition to existing lower level at rear. maximize lower level space to create a master suite with full closet, skylights, and remodel bathroom. remodel (e) laundry room. remove interior column in lower level. create hallway to get from stairs to outside. | $75,000 |
| Aug 30, 2022 | Never finaled issued Nov 2022, no final | 3655 Lawton St | expand (e) coffee shop and bakery (3655 lawton street) into adjacent commercial space (3645 lawton street) interior remodel/ti and cosmetic facade improvement.Details
expand (e) coffee shop and bakery (3655 lawton street) into adjacent commercial space (3645 lawton street) interior remodel/ti and cosmetic facade improvement. | $50,000 |
| Feb 14, 2022 | Completed final sign-off Feb 2023 | 649 Darien Wy | to remodel a ground floor bathroom, change the tile, the fixtures and waterproof the shower.Details
to remodel a ground floor bathroom, change the tile, the fixtures and waterproof the shower. | $10,000 |
| Jan 20, 2022 | Completed final sign-off Apr 2023 | 499 Dolores St | remodeling an extg restaurant and kitchen. no exterior changes. no change of use or occupancy. no structural work.Details
remodeling an extg restaurant and kitchen. no exterior changes. no change of use or occupancy. no structural work. | $53,000 |
| Nov 12, 2021 | Completed final sign-off Jun 2023 | 1198 Pacific Av | remodeling an(e) grocery store into a specialty market. new ada restroom, new wine shelving & coffe bar & sandwich shop. no work performed in basement.Details
remodeling an(e) grocery store into a specialty market. new ada restroom, new wine shelving & coffe bar & sandwich shop. no work performed in basement. | $128,000 |
| Mar 23, 2021 | Completed final sign-off Apr 2022 | 3407 Geary Bl | change of use from r-3/b to r-3/m. new cannabis retail at 1st floor. remodel extg restroom to conform to ada standards.Details
change of use from r-3/b to r-3/m. new cannabis retail at 1st floor. remodel extg restroom to conform to ada standards. | $38,000 |
| Feb 26, 2021 | Completed final sign-off Mar 2022 | 411 Columbus Av | tenant improvement: take out 897 sqft. provide new kitchen hood. grease duct. new bathroor. new counters.Details
tenant improvement: take out 897 sqft. provide new kitchen hood. grease duct. new bathroor. new counters. | $100,000 |
| Aug 15, 2017 | Completed final sign-off Nov 2024 | 1705 Jones St | remodel of (e) basement storage space into studio unit & bathroom. (e) garage door to be relocated & entry way to be rebuilt.Details
remodel of (e) basement storage space into studio unit & bathroom. (e) garage door to be relocated & entry way to be rebuilt. | $50,000 |
| Jun 23, 2017 | Never finaled issued Jun 2017, no final | 63 Ellis St | renewal of pa# 201502128126 for a final inspectionDetails
renewal of pa# 201502128126 for a final inspection | |
| Feb 19, 2016 | Never finaled issued Feb 2016, no final | 1333 Columbus Av | soft demo: no structural work(ground floor only) a.d.a. upgrade to be performed under t.i. n/a for maherDetails
soft demo: no structural work(ground floor only) a.d.a. upgrade to be performed under t.i. n/a for maher | $15,000 |
| Feb 19, 2016 | Completed final sign-off Sep 2016 | 1333 Columbus Av | bar remodel - bathroom remodel to be ada compliant - work on ground floor only. mep under sep permit. maher naDetails
bar remodel - bathroom remodel to be ada compliant - work on ground floor only. mep under sep permit. maher na | $45,000 |
| Jan 14, 2016 | Completed final sign-off May 2016 | 937 Cole St | rev. to pa# 201505085725- electrical work title 24 calcs., replace sewer line indicated on site plan, no clerestory windows on one side of front facade.Details
rev. to pa# 201505085725- electrical work title 24 calcs., replace sewer line indicated on site plan, no clerestory windows on one side of front facade. | |
| Jan 13, 2016 | Completed final sign-off Apr 2016 | 2154 Mission St | replace toilet and sink in bathroom. replace sinks in kitchen and prep area. replace lighting fixtures, paint walls, add stainless steel to hood area. frp to prep area.Details
replace toilet and sink in bathroom. replace sinks in kitchen and prep area. replace lighting fixtures, paint walls, add stainless steel to hood area. frp to prep area. | $10,000 |
| Dec 18, 2015 | Never finaled issued Jan 2016, no final | 2339 Clement St | title 24 lighting calcs. ref app# 201508315713.Details
title 24 lighting calcs. ref app# 201508315713. | $5,000 |
| Dec 4, 2015 | Never finaled issued Jan 2016, no final | 2339 Clement St | install exhaust duct for wood burning pizza oven.Details
install exhaust duct for wood burning pizza oven. | $15,000 |
| Nov 16, 2015 | Completed final sign-off Jun 2016 | 2030 Lombard St | ti to an existing unsprinklered 1st story a-2 restaurant use, interior repalcement of finishes, accessible restrooms, new bar & dining area.exterior replacement of entry glazing & door,structural shear wall & entry. reframing no change to 2nd and 3rd stories.Details
ti to an existing unsprinklered 1st story a-2 restaurant use, interior repalcement of finishes, accessible restrooms, new bar & dining area.exterior replacement of entry glazing & door,structural shear wall & entry. reframing no change to 2nd and 3rd stories. | $95,000 |
| Oct 30, 2015 | Completed final sign-off Feb 2016 | 2030 Lombard St | soft demo per sfbc ab17. remove furnishings and areas of drywall and other wall coverings. remove false floor at front and false wall at back.Details
soft demo per sfbc ab17. remove furnishings and areas of drywall and other wall coverings. remove false floor at front and false wall at back. | $10,000 |
| Sep 18, 2015 | Never finaled issued Jan 2016, no final | 63 Ellis St | 3rd floor -interior work includes, but is not limited to the following: relocation of 3rd floor bar to space between elevator & new stair, extension of 3rd floor dining area into existing kitchen. new occupant laod for all three floors- sffd assembly permitDetails
3rd floor -interior work includes, but is not limited to the following: relocation of 3rd floor bar to space between elevator & new stair, extension of 3rd floor dining area into existing kitchen. new occupant laod for all three floors- sffd assembly permit | $40,000 |
| Aug 31, 2015 | Completed final sign-off Jan 2016 | 2339 Clement St | restaurant remodel - change of ownership. new counter at dining area; ramp at front entrance, exhaust duct for pizza oven udner separate permit.Details
restaurant remodel - change of ownership. new counter at dining area; ramp at front entrance, exhaust duct for pizza oven udner separate permit. | $65,000 |
| Aug 5, 2015 | Never finaled issued Dec 2015, no final | 8 Octavia St | mep submittal to ref pa 2014 1208 3309 - new restaurant. fire sprinkler under sep permit. maher naDetails
mep submittal to ref pa 2014 1208 3309 - new restaurant. fire sprinkler under sep permit. maher na | $100,000 |
| Aug 3, 2015 | Completed final sign-off Jan 2016 | 2339 Clement St | replacing deck in kind, where areas have water damage, and reseal everywhere. not to exceded 50%.Details
replacing deck in kind, where areas have water damage, and reseal everywhere. not to exceded 50%. | $2,000 |
| May 27, 2015 | Completed final sign-off Feb 2016 | 3193 Mission St | revision to 201501307142. revision to bar and kitchen equipmentDetails
revision to 201501307142. revision to bar and kitchen equipment | $5,000 |
| May 8, 2015 | Completed final sign-off May 2016 | 937 Cole St | front facade repair: replace windows, doors, siding. vault ceiling under skylight; some new & replaced lights; accessibility upgrades: relcoate toilets, replace sinks, new atm.Details
front facade repair: replace windows, doors, siding. vault ceiling under skylight; some new & replaced lights; accessibility upgrades: relcoate toilets, replace sinks, new atm. | $42,000 |
| Mar 23, 2015 | Completed final sign-off Feb 2016 | 3193 Mission St | lighting revision to pa# 2015 0130 7142Details
lighting revision to pa# 2015 0130 7142 | |
| Feb 12, 2015 | Never finaled issued Apr 2015, no final | 63 Ellis St | work is all barrier removal work. ada requirements. includes 1) nw article 15 special access elev. to access basement thru 3rd flr, 2) construction of nw unisex access restrm on 2nd fl, 3) replacmnt of stair between 2nd & 3rd fl, 4)modify steel beam on 2nd fl. 5)add handrails bet floors met cfc 607Details
work is all barrier removal work. ada requirements. includes 1) nw article 15 special access elev. to access basement thru 3rd flr, 2) construction of nw unisex access restrm on 2nd fl, 3) replacmnt of stair between 2nd & 3rd fl, 4)modify steel beam on 2nd fl. 5)add handrails bet floors met cfc 607 | $75,000 |
| Jan 30, 2015 | Completed final sign-off Feb 2016 | 3193 Mission St | tenant improvement new entry doors, restroom remodel, (n) elect for reconfiguring new brew equipment and slab support.Details
tenant improvement new entry doors, restroom remodel, (n) elect for reconfiguring new brew equipment and slab support. | $73,930 |
| Dec 8, 2014 | Expired or cancelled cancelled Apr 2020 | 8 Octavia St | change of use from (e) vacant commercial to restaurant. new bar, kitchen, seating & accessible unisex bathrooms. plumbing, electrical & lighting work. no structural work. no exterior work to be performed. ** maher: compliance with ordinance no# 155-13 not required **Details
change of use from (e) vacant commercial to restaurant. new bar, kitchen, seating & accessible unisex bathrooms. plumbing, electrical & lighting work. no structural work. no exterior work to be performed. ** maher: compliance with ordinance no# 155-13 not required ** | $250,000 |
| Nov 26, 2013 | Completed final sign-off May 2014 | 2245 03rd St | erect non illumination double faced projecting signDetails
erect non illumination double faced projecting sign | $500 |
| Nov 25, 2013 | Completed final sign-off May 2014 | 2245 03rd St | open seperate permit since address has been update to obtain sign offs. for 2245 as a revision to permit app#201307031087.Details
open seperate permit since address has been update to obtain sign offs. for 2245 as a revision to permit app#201307031087. | |
| Sep 27, 2013 | Never finaled issued Oct 2013, no final | 1750 Polk St | new entry door, new accessible entry hardware, new exit strobe above. repair and replace as needed, 3 extg floor drains. new lighting fixtures to replace extg, new fans to replace extg, new switches to rpelace extg. new epoxy resin flooring and frp in bar. new paint and furniture.Details
new entry door, new accessible entry hardware, new exit strobe above. repair and replace as needed, 3 extg floor drains. new lighting fixtures to replace extg, new fans to replace extg, new switches to rpelace extg. new epoxy resin flooring and frp in bar. new paint and furniture. | $18,000 |
| Aug 20, 2013 | Completed final sign-off Mar 2015 | 1790 Page St | to comply with nov 200879069 dated 10/3/2008- remodel masterbath, demolish (e) fixtures & install a new shower, toilet, sink. relocate interior bathroom wall, new title 24 compliant to install lights, outlets & fans. no square footage is being added to the bldg. replace 1 window & add 1 new window.Details
to comply with nov 200879069 dated 10/3/2008- remodel masterbath, demolish (e) fixtures & install a new shower, toilet, sink. relocate interior bathroom wall, new title 24 compliant to install lights, outlets & fans. no square footage is being added to the bldg. replace 1 window & add 1 new window. | $8,500 |
| Aug 13, 2013 | Completed final sign-off Oct 2013 | 1098 Jackson St | replace drywall on 2 walls in kitchen where plmg occured. install of frp panneling over sheetrock. adding ada complaint table to restaurant.Details
replace drywall on 2 walls in kitchen where plmg occured. install of frp panneling over sheetrock. adding ada complaint table to restaurant. | $2,500 |
| Jul 3, 2013 | Completed final sign-off May 2014 | 2225 03rd St | interior tenant improvement, construction of interior space & finishes up to tenant leaseline. install walls, ceiling, plumbing, electrical & mech systems. install brewing equipment & operate smakll beer manufacture. fire sprinkler under seperate permit.Details
interior tenant improvement, construction of interior space & finishes up to tenant leaseline. install walls, ceiling, plumbing, electrical & mech systems. install brewing equipment & operate smakll beer manufacture. fire sprinkler under seperate permit. | $75,000 |
| Mar 27, 2013 | Never finaled issued May 2013, no final | 850 Bush St | ground floor t.i. of vacant space to full service restaurant and bar. 2 new fully accessible restrooms, storage mezzanine and wheelchair ramp. restaurant will seat less than 50 occ.Details
ground floor t.i. of vacant space to full service restaurant and bar. 2 new fully accessible restrooms, storage mezzanine and wheelchair ramp. restaurant will seat less than 50 occ. | $60,000 |
| Mar 15, 2013 | Completed final sign-off Jul 2013 | 702 22nd St | replace & enlarge (e) windows (visible from street). no structural, no mechanical, electrical or plumbing, no interior work. awning under separate permit.Details
replace & enlarge (e) windows (visible from street). no structural, no mechanical, electrical or plumbing, no interior work. awning under separate permit. | $15,000 |
| Mar 1, 2013 | Completed final sign-off Mar 2015 | 1790 Page St | interior alter. of (e) 2nd fl-remodel (e) kitchen, master bedroom & dining area. new closet in master bedroom, new opening & pocket doors in dining area. 3rd fl-remodel (e) kitchen & bathroom. replace 2 windows in kitchen & bathroom. interior wall to be relocated. electrical panels to be replaced.Details
interior alter. of (e) 2nd fl-remodel (e) kitchen, master bedroom & dining area. new closet in master bedroom, new opening & pocket doors in dining area. 3rd fl-remodel (e) kitchen & bathroom. replace 2 windows in kitchen & bathroom. interior wall to be relocated. electrical panels to be replaced. | $55,000 |
| Feb 7, 2013 | Completed final sign-off Jul 2013 | 702 22nd St | interior renovations to existing building including demolition and constructon of interior walls, accessibility upgrades to baths, replacement of bar equipment, installation of built in seating. light fixutres, replacement of skylightsDetails
interior renovations to existing building including demolition and constructon of interior walls, accessibility upgrades to baths, replacement of bar equipment, installation of built in seating. light fixutres, replacement of skylights | $40,000 |
| Jan 22, 2013 | Completed final sign-off Jan 2015 | 1790 Page St | remodel of existing garage. new foundation and seismic upgrade to garage level. relocation of existing furnace, existing beams and columns to be replaced.Details
remodel of existing garage. new foundation and seismic upgrade to garage level. relocation of existing furnace, existing beams and columns to be replaced. | $100,000 |
| Aug 7, 2012 | Completed final sign-off Sep 2012 | 858 Folsom St | to erect non electric projecting sign including 2 indirect lights aboveDetails
to erect non electric projecting sign including 2 indirect lights above | $2,000 |
| Jul 3, 2012 | Never finaled issued Jul 2012, no final | 5 Masonic Av | (2) non-sructural painted wall signDetails
(2) non-sructural painted wall sign | $100 |
| Jul 3, 2012 | Completed final sign-off Aug 2012 | 5 Masonic Av | replacement of the aluminum facesd on (1) double faced projecting sign with exposed neon tube. the sign shall be of the smae surface area as the existing neon sign but formed in a new circular shape with new neon tubes and fit on to the existing structure.Details
replacement of the aluminum facesd on (1) double faced projecting sign with exposed neon tube. the sign shall be of the smae surface area as the existing neon sign but formed in a new circular shape with new neon tubes and fit on to the existing structure. | $1,500 |
| Jun 11, 2012 | Never finaled issued Jun 2012, no final | 5 Masonic Av | revision to appl #2012.05.09.0098 - scope of work is limited to the revision of the accessibility checklist to represent the changes made to the restroom layout due to existing conditiona discovered during construction.Details
revision to appl #2012.05.09.0098 - scope of work is limited to the revision of the accessibility checklist to represent the changes made to the restroom layout due to existing conditiona discovered during construction. | |
| Jun 1, 2012 | Completed final sign-off Aug 2012 | 5 Masonic Av | revision to 201205090098. reopen existing covered window along masonic st. remove non structural plywood to expose existing window opening. visible from streetDetails
revision to 201205090098. reopen existing covered window along masonic st. remove non structural plywood to expose existing window opening. visible from street | $1,500 |
| May 9, 2012 | Completed final sign-off Aug 2012 | 5 Masonic Av | t.i to (e) restaurant space, interior/exterior upgrades. minor demo, upgrading accessability of (e) restrms, new int finishes & equipment. new fabric on (e) awning, new movable planters to repl (e). new planter screen wall at north end of out door seating area & new paint.Details
t.i to (e) restaurant space, interior/exterior upgrades. minor demo, upgrading accessability of (e) restrms, new int finishes & equipment. new fabric on (e) awning, new movable planters to repl (e). new planter screen wall at north end of out door seating area & new paint. | $100,000 |
| Mar 2, 2012 | Completed final sign-off May 2012 | 1221 Polk St | widen existing hallway to create legitimate 2nd means of egress; (sprinkler under separate permit)Details
widen existing hallway to create legitimate 2nd means of egress; (sprinkler under separate permit) | $10,000 |
| Dec 27, 2011 | Expired or cancelled cancelled Jan 2026 | 550 Bryant St | at ground fl office: remove existing partitions, install new partitions, beams, install new bath. remove existing rollup door, new exit door.Details
at ground fl office: remove existing partitions, install new partitions, beams, install new bath. remove existing rollup door, new exit door. | $40,000 |
| Oct 31, 2011 | Completed final sign-off Dec 2011 | 815 Cole St | to erect lighted wall signDetails
to erect lighted wall sign | $1,500 |
| Sep 29, 2011 | Never finaled issued Sep 2011, no final | 281 Turk St | reference app# 201005212975. install security glass above (e) counter. remove & replace (e) security gate (in-kind) at front of bldg.Details
reference app# 201005212975. install security glass above (e) counter. remove & replace (e) security gate (in-kind) at front of bldg. | $7,000 |
| Sep 23, 2011 | Completed final sign-off Feb 2012 | 322 Kearny St | existing restaurant change of ownership. replace some cooking equipment under same hood at ground floor. add wet bar, ice maker, food prep counter in basement. occupant load verification. fire alarm; fire sprinkler and fire suppression system on separate permits.Details
existing restaurant change of ownership. replace some cooking equipment under same hood at ground floor. add wet bar, ice maker, food prep counter in basement. occupant load verification. fire alarm; fire sprinkler and fire suppression system on separate permits. | $10,000 |
| Jan 19, 2011 | Completed final sign-off Dec 2011 | 815 Cole St | change of use to a new ice cream bar and full service restaurant.Details
change of use to a new ice cream bar and full service restaurant. | $25,000 |
| Nov 3, 2010 | Never finaled issued Nov 2010, no final | 850 South Van Ness Av | scaffold 30x30 wall remove existing siding and install plywood, tyvec and hardie plank siding and paint and trimDetails
scaffold 30x30 wall remove existing siding and install plywood, tyvec and hardie plank siding and paint and trim | $10,000 |
| Sep 30, 2010 | Never finaled issued Feb 2011, no final | 589 Bryant St | voluntary partial improvements for seismic resistance. remodel portion of ground floor for accessibility entry and unisex toilet in compliance with 2007 sfbc.Details
voluntary partial improvements for seismic resistance. remodel portion of ground floor for accessibility entry and unisex toilet in compliance with 2007 sfbc. | $42,000 |
| May 21, 2010 | Completed final sign-off Jun 2011 | 281 Turk St | change of use from locksmith to pharmacy. remodel (e) bath, (n) heating, upgrade (e) electrical, (n) partition walls, replace ceiling tile in (e) grid. (all work @ commercial unit.Details
change of use from locksmith to pharmacy. remodel (e) bath, (n) heating, upgrade (e) electrical, (n) partition walls, replace ceiling tile in (e) grid. (all work @ commercial unit. | $20,000 |