C D Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Dec 2016
- Last 24 months
- 0 permits filed
28 permits since 2000: 26 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 30, 2016 | Completed final sign-off Jan 2018 | 1346 39th Av | add two bedrooms, one bathroom and family/entertainment room on 1st floorDetails
add two bedrooms, one bathroom and family/entertainment room on 1st floor | $39,000 |
| Jun 14, 2016 | Completed final sign-off Mar 2017 | 34 05th Av | replace 6 existing windows with aluminum-clad wood "marvin" u-factor 0.38 max. divided light (15) casement with integrated semi-circular (5 light) integrated transom.Details
replace 6 existing windows with aluminum-clad wood "marvin" u-factor 0.38 max. divided light (15) casement with integrated semi-circular (5 light) integrated transom. | $5,000 |
| Jun 3, 2016 | Completed final sign-off Nov 2016 | 1346 39th Av | remodel kitchen & bathroom (no wall changes); appliances remaining in same location.Details
remodel kitchen & bathroom (no wall changes); appliances remaining in same location. | $8,500 |
| Jun 9, 2015 | Completed final sign-off Jun 2016 | 34 05th Av | replace 6 existing windows - with aluminum clad wood material.Details
replace 6 existing windows - with aluminum clad wood material. | $5,000 |
| Apr 10, 2014 | Completed final sign-off Jan 2015 | 268 06th Av | unit 301: repair one (1) kitchen, replace courtertops, six (6) cabinets, change two (2) bathroomtoilets, sinks, shower pan, wall tiles.Details
unit 301: repair one (1) kitchen, replace courtertops, six (6) cabinets, change two (2) bathroomtoilets, sinks, shower pan, wall tiles. | $8,000 |
| Jul 19, 2013 | Completed final sign-off Sep 2013 | 336 20th Av | no electrical work needed, repair of shower and change of bathroom tiles onlyDetails
no electrical work needed, repair of shower and change of bathroom tiles only | $2,800 |
| Jan 7, 2013 | Completed final sign-off May 2013 | 1335 Washington St | unit #2:replace kitchen cabinets, counter top and vynil floor. replace bathroom tub, sink, wall tiles.Details
unit #2:replace kitchen cabinets, counter top and vynil floor. replace bathroom tub, sink, wall tiles. | $14,000 |
| Aug 10, 2012 | Completed final sign-off Dec 2012 | 697 44th Av | repair kitchen-replace cabinets, counter tops in kind at the same location. repair shower in bathroom, no change to wall or exterior. no structural workDetails
repair kitchen-replace cabinets, counter tops in kind at the same location. repair shower in bathroom, no change to wall or exterior. no structural work | $9,200 |
| Jul 5, 2011 | Expired or cancelled cancelled Jan 2026 | 695 44th Av | repair (1) kitchen - replace cabinet and countertop and new kitchen sink. no change to wall or exterior. change in kind. window in kitchen max u-factor .40. lighting to comply with cec 150(k)Details
repair (1) kitchen - replace cabinet and countertop and new kitchen sink. no change to wall or exterior. change in kind. window in kitchen max u-factor .40. lighting to comply with cec 150(k) | |
| Jul 5, 2011 | Completed final sign-off Aug 2011 | 695 44th Av | repair (1) kitchen - replace cabinet and countertop and new kitchen sink. no change to wall or exterior. change in kind. window in kitchen max u-factor .40. lighting to comply with cec 150(k)Details
repair (1) kitchen - replace cabinet and countertop and new kitchen sink. no change to wall or exterior. change in kind. window in kitchen max u-factor .40. lighting to comply with cec 150(k) | $6,800 |
| Jun 24, 2011 | Completed final sign-off Nov 2011 | 655 09th Av | remodel (e) master bedroom on third floor. add half bath on second floor.Details
remodel (e) master bedroom on third floor. add half bath on second floor. | $10,000 |
| Apr 29, 2011 | Completed final sign-off Jul 2011 | 1630 Jones St | #2- replace 1 kitchen cabinets, counter and sink, no new lighting, no flooring and remodel of small 8' counter area. replace 1 bathroom tiles only, no other changes.Details
#2- replace 1 kitchen cabinets, counter and sink, no new lighting, no flooring and remodel of small 8' counter area. replace 1 bathroom tiles only, no other changes. | $6,500 |
| Nov 10, 2010 | Completed final sign-off Jan 2011 | 1846 Larkin St | #6- replace kitchen cabinets, counter and sink. patch holes and paint in apartment #6 only. replace (7) windows, same size and location. all work in apartment 6 only. non structural workDetails
#6- replace kitchen cabinets, counter and sink. patch holes and paint in apartment #6 only. replace (7) windows, same size and location. all work in apartment 6 only. non structural work | $8,000 |
| May 3, 2010 | Completed final sign-off Feb 2011 | 514 22nd Av | add (n) bathroom @ third floor as per plan-convert part of (e) sunroom to (n) bathrm. & (n) closet at hallway on third flr.Details
add (n) bathroom @ third floor as per plan-convert part of (e) sunroom to (n) bathrm. & (n) closet at hallway on third flr. | $11,329 |
| Sep 11, 2009 | Completed final sign-off Sep 2010 | 2945 24th Av | new bedroom & bathroom at first floor.Details
new bedroom & bathroom at first floor. | $20,000 |
| Sep 4, 2009 | Completed final sign-off Mar 2010 | 514 22nd Av | relocate existing kitchen and half bath at second floor.Details
relocate existing kitchen and half bath at second floor. | $10,000 |
| Nov 4, 2008 | Completed final sign-off Nov 2008 | 1932 Webster St | increase estimated cost on pa# 2008/08/29/0453 per building inspector. no new work per inspectors.Details
increase estimated cost on pa# 2008/08/29/0453 per building inspector. no new work per inspectors. | $9,000 |
| Aug 29, 2008 | Completed final sign-off Nov 2008 | 1932 Webster St | replace kitchen cabinet and counter top. n o change in floor plan.Details
replace kitchen cabinet and counter top. n o change in floor plan. | $3,000 |
| Feb 13, 2008 | Completed final sign-off May 2008 | 1846 Larkin St | bathroom-replace tub, toilet, sink and tiles, kitchen-replace cabinets, counter and sink, patch wall holes and paintDetails
bathroom-replace tub, toilet, sink and tiles, kitchen-replace cabinets, counter and sink, patch wall holes and paint | $13,000 |
| Feb 13, 2008 | Completed final sign-off Feb 2008 | 582 10th Av | repair stairs (rear), provide deadbolt locks at exterior doors, replace/repair defective self-closing devices, provide shutr off tool for gas utility shut offDetails
repair stairs (rear), provide deadbolt locks at exterior doors, replace/repair defective self-closing devices, provide shutr off tool for gas utility shut off | $1,500 |
| Feb 12, 2008 | Completed final sign-off Jun 2008 | 1932 Webster St | correct violations per bid & his report for condo conversion. 3- r report # 4420. # 3. remove illegal enclosure and stairs. #6, install new battery detectors, #8 & 13. remove dead bolt lock. # 9 new battery smoke detectors, remodel kitchen. work to be done on 1934 webster.Details
correct violations per bid & his report for condo conversion. 3- r report # 4420. # 3. remove illegal enclosure and stairs. #6, install new battery detectors, #8 & 13. remove dead bolt lock. # 9 new battery smoke detectors, remodel kitchen. work to be done on 1934 webster. | $45,000 |
| Jan 26, 2007 | Completed final sign-off Feb 2007 | 1921 Lake St | comply with his nov 200683735, replace apt 3 broken glass panel door , repair rear staircase dry rot, (2nd/3rd stairs) under 50%. apt 3 paint corridor and bathroom. comply with novs: 200683735 11/30/06, 2006787594 1/8/07, 200683392 dated 11/30/2006, 200684211 dated 12/5/06Details
comply with his nov 200683735, replace apt 3 broken glass panel door , repair rear staircase dry rot, (2nd/3rd stairs) under 50%. apt 3 paint corridor and bathroom. comply with novs: 200683735 11/30/06, 2006787594 1/8/07, 200683392 dated 11/30/2006, 200684211 dated 12/5/06 | $3,800 |
| Jul 28, 2005 | Completed final sign-off Aug 2005 | 1541 Oak St | repair side exterior stairs and install handrails as per routine inspection violations -Details
repair side exterior stairs and install handrails as per routine inspection violations - | $4,500 |
| Mar 9, 2005 | Completed final sign-off Jun 2005 | 1846 Larkin St | remodel kitchen & bathroom- replace cabinet, vinyl floors & paint.toilet,sink&tiles.no structural wkDetails
remodel kitchen & bathroom- replace cabinet, vinyl floors & paint.toilet,sink&tiles.no structural wk | $12,500 |
| Oct 18, 2004 | Completed final sign-off Jan 2005 | 62 Palm Av | change 7 old windows, same size, all windows facing streetDetails
change 7 old windows, same size, all windows facing street | $3,500 |
| Sep 17, 2002 | Completed final sign-off Sep 2002 | 1273 Green St | ref:200204093522=existang window replace in kind, rear six windowsDetails
ref:200204093522=existang window replace in kind, rear six windows | $8,000 |
| Apr 9, 2002 | Completed final sign-off Sep 2002 | 1273 Green St | kitchen & bathroom upgrade. drywall and painting. (no structural changes)Details
kitchen & bathroom upgrade. drywall and painting. (no structural changes) | $8,000 |
| Jun 9, 2000 | Expired or cancelled expired May 2001 | 1335 Washington St | revision to 2000/04/12/7013. add bathroom, replace all windows & beam.Details
revision to 2000/04/12/7013. add bathroom, replace all windows & beam. | $9,000 |