Business Information Build For Life Cons
- Based in
- San Francisco
- On San Francisco permits
- Oct 2023 to Dec 2025
- Last 24 months
- 1 permit filed
4 permits since 2000: 3 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 30, 2025 | In progress issued Jan 2026 | 2547 Chestnut St | remodeling kitchen: replace kitchen cabinets, replace kitchen appliances, replace kitchen floor, same layout, remodeling bathroom, replace shower and floor tile, replace toilet, replace vanity, same layout. like for like no wall demolitionDetails
remodeling kitchen: replace kitchen cabinets, replace kitchen appliances, replace kitchen floor, same layout, remodeling bathroom, replace shower and floor tile, replace toilet, replace vanity, same layout. like for like no wall demolition | $27,000 |
| Mar 25, 2024 | Completed final sign-off Oct 2024 | 207 Berry St | prop h - (e) non-bearing interior wlls to be removed; remove base & wall finishes; provide (1) new interior wall to divide (e) space; relocate power & data outlets as noted; add new infill walls; add new infill drywall ceiling, new paint, wall finishes. add 4 new ligths; patch drywall ceiling.Details
prop h - (e) non-bearing interior wlls to be removed; remove base & wall finishes; provide (1) new interior wall to divide (e) space; relocate power & data outlets as noted; add new infill walls; add new infill drywall ceiling, new paint, wall finishes. add 4 new ligths; patch drywall ceiling. | $35,000 |
| Nov 21, 2023 | Completed final sign-off Jan 2024 | 2370 16th Av | remodeling one guest bathroom, all fixtures will be on same location, no wall movementDetails
remodeling one guest bathroom, all fixtures will be on same location, no wall movement | $15,000 |
| Oct 2, 2023 | Completed final sign-off Jan 2024 | 2370 16th Av | remodeling 2 bathrooms. all applicances will be on same location, no walls movementDetails
remodeling 2 bathrooms. all applicances will be on same location, no walls movement | $35,000 |