Burr Computer Environments Inc.
- Based in
- Houston
- On San Francisco permits
- Apr 2015 to May 2018
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2018 | Expired or cancelled expired Nov 2020 | 200 Paul Av | addition of 2 opticol systems in (e) switch room for equipment cooling. addition of 1 crac unit & 1 dry cooler for cooling redundancyDetails
addition of 2 opticol systems in (e) switch room for equipment cooling. addition of 1 crac unit & 1 dry cooler for cooling redundancy | $10,000 |
| Apr 13, 2015 | Completed final sign-off Feb 2017 | 200 Paul Av | installation of 2 (1000 kw optional standby) diesel generator sets with 3,000 gallon belly tanks each. new structural pads located outside of building-d.Details
installation of 2 (1000 kw optional standby) diesel generator sets with 3,000 gallon belly tanks each. new structural pads located outside of building-d. | $94,000 |