Buildzig
- Based in
- Oakland
- On San Francisco permits
- May 2013 to Nov 2014
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 14, 2014 | Completed final sign-off Dec 2014 | 39 Samoset St | revision appl. 2014.03.10.0363 to change the master bedroom to be a den. remove the sprinkler requirement.Details
revision appl. 2014.03.10.0363 to change the master bedroom to be a den. remove the sprinkler requirement. | |
| Mar 10, 2014 | Completed final sign-off Dec 2014 | 39 Samoset St | interior remodel. no change to size of bldg, envelope. new kitchen location, 2 new bathrooms locations, new extg windows/doors. reuse extg stairs. replace (1) front door w/window (door at alcove to remain). 3 bedroom and 2 bath house.Details
interior remodel. no change to size of bldg, envelope. new kitchen location, 2 new bathrooms locations, new extg windows/doors. reuse extg stairs. replace (1) front door w/window (door at alcove to remain). 3 bedroom and 2 bath house. | $60,000 |
| May 3, 2013 | Completed final sign-off May 2016 | 220 27th St | addition of (n) upper 3/fl & excavate portions of garage level 1/fl. additions/extension on grd (1st) fl & main (2nd) fl. remodel interior (e) house. 2 (n) bathroom added.Details
addition of (n) upper 3/fl & excavate portions of garage level 1/fl. additions/extension on grd (1st) fl & main (2nd) fl. remodel interior (e) house. 2 (n) bathroom added. | $350,000 |