Building Green Projects
- Based in
- San Francisco
- On San Francisco permits
- Sep 2019 to Jul 2026
- Last 24 months
- 3 permits filed
4 permits since 2000: 3 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2026 | In progress filed Jul 2026, not yet issued | 500 Presidio Av | interior only ti to add dining room (20) occupancy to (e) restaurant. no new restrtooms, (e) accessible features to remain. ref 202507280393 (e) lighting to remain and hvacDetails
interior only ti to add dining room (20) occupancy to (e) restaurant. no new restrtooms, (e) accessible features to remain. ref 202507280393 (e) lighting to remain and hvac | $60,000 |
| Aug 18, 2025 | Completed final sign-off Feb 2026 | 500 Presidio Av | revision to pa#: 202507080393. remodel to existing restaurant reuse of existing 200a panel, reuse of (e) panel a to supply new branch circuit for lighting and kitchen equipment.Details
revision to pa#: 202507080393. remodel to existing restaurant reuse of existing 200a panel, reuse of (e) panel a to supply new branch circuit for lighting and kitchen equipment. | $40,000 |
| Jul 8, 2025 | Completed final sign-off Feb 2026 | 500 Presidio Av | restaurant t.i.: relocate e) bar, replace interior finishes, seating, appliances. e) type-1 hoods to remain. e) hc restrooms to remain. convert 2 storefront drs to windows in e) openings. no change in occupancy, no change in fl area. electrical/light under sep. permitDetails
restaurant t.i.: relocate e) bar, replace interior finishes, seating, appliances. e) type-1 hoods to remain. e) hc restrooms to remain. convert 2 storefront drs to windows in e) openings. no change in occupancy, no change in fl area. electrical/light under sep. permit | $185,000 |
| Sep 11, 2019 | Completed final sign-off Apr 2020 | 227 Lake St | remove existing cedar shingle siding at rear third of west elevation (behind projecting bay) and full south (rear) elevation and install new fiber cement hardiplank siding. paint new siding.Details
remove existing cedar shingle siding at rear third of west elevation (behind projecting bay) and full south (rear) elevation and install new fiber cement hardiplank siding. paint new siding. | $35,000 |