Building Efficiency Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2011 to Jul 2023
- Last 24 months
- 0 permits filed
27 permits since 2000: 26 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2023 | Expired or cancelled withdrawn Mar 2024 | 4000 Moraga St | install 1 new heat hump hvac and 1 heat pump water heater condensersDetails
install 1 new heat hump hvac and 1 heat pump water heater condensers | $20,000 |
| Apr 19, 2023 | Completed final sign-off May 2023 | 50 Willard North St | install new hvac duct work, 26 gauge metal ducts. less than 25' (n) ductworkDetails
install new hvac duct work, 26 gauge metal ducts. less than 25' (n) ductwork | $4,000 |
| Mar 28, 2018 | Completed final sign-off Sep 2018 | 3549 23rd St | install mini split heat pump.Details
install mini split heat pump. | $13,000 |
| Aug 24, 2016 | Completed final sign-off Sep 2016 | 375 Eddy St | attic insulation - blown-in cellulose.Details
attic insulation - blown-in cellulose. | $3,421 |
| Aug 24, 2016 | Completed final sign-off Sep 2016 | 340 Eddy St | attic insulation - blown-in cellulose.Details
attic insulation - blown-in cellulose. | $7,266 |
| Nov 12, 2015 | Completed final sign-off Nov 2015 | 940 Washington St | add attic insulation to existing, r-40 equivalent.Details
add attic insulation to existing, r-40 equivalent. | $4,000 |
| Oct 29, 2015 | Completed final sign-off Nov 2015 | 1204 Mason St | new attic insulation, r-40 equivalent. n/a ordinance #155-13Details
new attic insulation, r-40 equivalent. n/a ordinance #155-13 | $5,000 |
| Oct 29, 2015 | Completed final sign-off Nov 2015 | 160 Eddy St | add attic insulation to extg. r-40 equivalent.Details
add attic insulation to extg. r-40 equivalent. | $8,000 |
| Oct 29, 2015 | Completed final sign-off Nov 2015 | 534 Broadway | add attic insulation to extg. r-40 equivalent.Details
add attic insulation to extg. r-40 equivalent. | $4,000 |
| Oct 29, 2015 | Completed final sign-off Nov 2015 | 585 Geary St | new attic insulation, r-40 equivalent.Details
new attic insulation, r-40 equivalent. | $2,000 |
| Oct 29, 2015 | Completed final sign-off Nov 2015 | 657 Clay St | new attic insulation, r-40 equivalent.Details
new attic insulation, r-40 equivalent. | $2,500 |
| Apr 3, 2015 | Completed final sign-off Apr 2015 | 1690 Beach St | add attic insulation to r- value of r-19; n/a maher ord. # 155-13Details
add attic insulation to r- value of r-19; n/a maher ord. # 155-13 | $3,665 |
| Jan 12, 2015 | Completed final sign-off Jan 2015 | 15 Brentwood Av | blow in insulation in walls and atticDetails
blow in insulation in walls and attic | $3,000 |
| Jul 21, 2014 | Completed final sign-off May 2015 | 707 Cole St | alteration lower floor rooms (interior work) and add 1/2 bathDetails
alteration lower floor rooms (interior work) and add 1/2 bath | $100,000 |
| Jun 10, 2014 | Completed final sign-off Aug 2014 | 707 Cole St | second floor laundry unit, conversion no walls moved, removed or added, applianace layout not changingDetails
second floor laundry unit, conversion no walls moved, removed or added, applianace layout not changing | $16,000 |
| Apr 17, 2014 | Completed final sign-off Jun 2014 | 1461 Broadway | one bath remodel - sink, toilet, vanity, floors, electricalDetails
one bath remodel - sink, toilet, vanity, floors, electrical | $15,000 |
| Dec 13, 2013 | Completed final sign-off Jan 2014 | 580 15th Av | furnace change out and move 5' location of unit. ducts in garage to be 26 ga. minDetails
furnace change out and move 5' location of unit. ducts in garage to be 26 ga. min | $7,000 |
| Jul 25, 2013 | Completed final sign-off May 2015 | 535 Broadway | replace existing wall furnace with central furnace high efficency & new duct system, working in whole building. 2 furnaces.Details
replace existing wall furnace with central furnace high efficency & new duct system, working in whole building. 2 furnaces. | $17,000 |
| Jan 23, 2013 | Completed final sign-off Jan 2013 | 1449 Plymouth Av | install blown in insulation in permiter walls, (r-15- dense patch )Details
install blown in insulation in permiter walls, (r-15- dense patch ) | $1,700 |
| Jan 15, 2013 | Completed final sign-off Jan 2013 | 1254 Plymouth Av | install blow-in insulation on main floor perimeter walls to comply with complaint #201281292Details
install blow-in insulation on main floor perimeter walls to comply with complaint #201281292 | $1,700 |
| Nov 5, 2012 | Completed final sign-off Dec 2012 | 41 Wilder St | furnace change out at old gravity furnace & install new duck-workDetails
furnace change out at old gravity furnace & install new duck-work | $10,000 |
| Aug 31, 2012 | Completed final sign-off Nov 2013 | 817 York St | create guest bedroom suite in ground level. new bathroom, bedroom, laundry, new laundry & stair, new hall to rear yard. new conditioned space.Details
create guest bedroom suite in ground level. new bathroom, bedroom, laundry, new laundry & stair, new hall to rear yard. new conditioned space. | $66,250 |
| Aug 30, 2012 | Completed final sign-off Nov 2013 | 817 York St | change of use for single family to 2 unit. designation of 2nd unit. new kitchen for unit. ref to p/a#201208318709.Details
change of use for single family to 2 unit. designation of 2nd unit. new kitchen for unit. ref to p/a#201208318709. | $2,000 |
| Jun 27, 2012 | Completed final sign-off Oct 2013 | 1226 Ulloa St | bathroomremodel, plumbing, electrical, geneal. no structural work. comply with cec 150(k)Details
bathroomremodel, plumbing, electrical, geneal. no structural work. comply with cec 150(k) | $10,000 |
| Jan 23, 2012 | Completed final sign-off Oct 2012 | 151 Brompton Av | replace 8 front facing windows and front door, with milgard essence series, 9 over 1 window (double hung) 1 fixed, and matching exterior doorDetails
replace 8 front facing windows and front door, with milgard essence series, 9 over 1 window (double hung) 1 fixed, and matching exterior door | $10,000 |
| Dec 14, 2011 | Completed final sign-off Aug 2012 | 1461 Broadway | kitchen remodel/ replacement of kitchen cabinets and appliances/installation of new lighting/new sink and counter tops.Details
kitchen remodel/ replacement of kitchen cabinets and appliances/installation of new lighting/new sink and counter tops. | $15,000 |
| Dec 1, 2011 | Completed final sign-off Aug 2012 | 1461 Broadway | bath remodel, all fixtures to remain in place, new shower tile, new floor tile.Details
bath remodel, all fixtures to remain in place, new shower tile, new floor tile. | $9,000 |