Build Singular Joint Venture
- Based in
- San Francisco
- On San Francisco permits
- May 2024 to Jan 2026
- Last 24 months
- 6 permits filed
7 permits since 2000: 6 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 29, 2026 | Completed final sign-off May 2026 | 1075 California St | revision to pa#: 202512232542. per field inspectors notes. evacuation mapsDetails
revision to pa#: 202512232542. per field inspectors notes. evacuation maps | |
| Jan 15, 2026 | In progress issued Jan 2026 | 1075 California St | revise mechanical drawing in pa# 2025-0212-0165 to show changes and additional fire/smoke dampersDetails
revise mechanical drawing in pa# 2025-0212-0165 to show changes and additional fire/smoke dampers | |
| Dec 18, 2025 | Completed final sign-off Mar 2026 | 1075 California St | revision to 202502120165: to include refinishing indoor pool deck & the addition of new drainsDetails
revision to 202502120165: to include refinishing indoor pool deck & the addition of new drains | $22,000 |
| Dec 18, 2025 | Completed final sign-off Aug 2026 | 1075 California St | deferred submittal to document change in the accessible storefront from aluminum to wood to match adjacent exterior door (existing) and provide power door operator in lieu of level landing per information sheet da-04 refer to issued pa#20285-1212-0165Details
deferred submittal to document change in the accessible storefront from aluminum to wood to match adjacent exterior door (existing) and provide power door operator in lieu of level landing per information sheet da-04 refer to issued pa#20285-1212-0165 | |
| Sep 23, 2025 | Completed final sign-off Aug 2026 | 1075 California St | deferred submittal for pa #202502120165 for food service review. new equipment and finish work for lobby bar back of house and lobby bar; repair or replacement of existing finishes and fixtures in existing restaurant bar, kitchen and room service area.Details
deferred submittal for pa #202502120165 for food service review. new equipment and finish work for lobby bar back of house and lobby bar; repair or replacement of existing finishes and fixtures in existing restaurant bar, kitchen and room service area. | $44,175 |
| Feb 25, 2025 | Completed final sign-off Aug 2026 | 1075 California St | renovation of all (e) guest rooms including new finishes and furnishings,full (n) bath renovations,(n) lighting,conversion of select guest rooms at level 12 to presidential suite.refresh of finishes,furnishings,and lighting at spa and pool,main lobby,big 4 restaurant,select partition changes...Details
renovation of all (e) guest rooms including new finishes and furnishings,full (n) bath renovations,(n) lighting,conversion of select guest rooms at level 12 to presidential suite.refresh of finishes,furnishings,and lighting at spa and pool,main lobby,big 4 restaurant,select partition changes... | $15,000,000 |
| May 20, 2024 | Completed final sign-off Aug 2026 | 1075 California St | renovate (1) guestroom suite and section of adjoining corridor in the (e) hotel to test new operational standards of hotel. renovations include demo of (e) interior partitons, fixtures and finishes, construct new partitions, plumbing, electrical fixtures, floor, wall, and ceiling finishes.Details
renovate (1) guestroom suite and section of adjoining corridor in the (e) hotel to test new operational standards of hotel. renovations include demo of (e) interior partitons, fixtures and finishes, construct new partitions, plumbing, electrical fixtures, floor, wall, and ceiling finishes. | $125,000 |