Buhler Commercial

Contractor license
1003262
State license record
Based in
San Francisco
On San Francisco permits
Jun 2017 to Jul 2023
Last 24 months
0 permits filed

16 permits since 2000: 14 completed, 1 never finaled, 1 expired or cancelled.

Of the 1 never-finaled permit, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllStairs 1
FiledOutcomeAddressWork described on the permitDeclared cost
Jul 24, 2023Completed
final sign-off Feb 2024
1011 Turk Stwork scope under revision (#3) of permit #2022.0106.5473 is the addition of idf room #242. to project renovation currently under construction. minor revisions that occured during construction included for reference.
Details
Permit
202307242775
Status
complete
Filed
Jul 24, 2023
Permit issued
Nov 20, 2023
Final sign-off
Feb 15, 2024
Declared cost
$12,000
Address
1011 Turk St

work scope under revision (#3) of permit #2022.0106.5473 is the addition of idf room #242. to project renovation currently under construction. minor revisions that occured during construction included for reference.

Open the permit page

$12,000
Mar 17, 2022Completed
final sign-off Dec 2022
425 07th Stamendment to approved permit #201908199221 and 202110049757.the added scope of work is to modify staff restroom 2548 to comply with california state title 24 2019
Details
Permit
202203170281
Status
complete
Filed
Mar 17, 2022
Permit issued
Jun 29, 2022
Final sign-off
Dec 29, 2022
Declared cost
$30,000
Address
425 07th St

amendment to approved permit #201908199221 and 202110049757.the added scope of work is to modify staff restroom 2548 to comply with california state title 24 2019

Open the permit page

$30,000
Jan 21, 2022Completed
final sign-off Jun 2022
1076 Howard Strevision to bpa2021-0726-5052: revised fixtures, (n) door swing & partition rm 102;(n) wall & door swing @ conference rm 201; ceiling height rm 206;(n) door swing restrm 208;reconfigure restrm 209; door schedule;add hss frames;roof framing @ mech units & special inspections.
Details
Permit
202201216431
Status
complete
Filed
Jan 21, 2022
Permit issued
May 6, 2022
Final sign-off
Jun 16, 2022
Address
1076 Howard St

revision to bpa2021-0726-5052: revised fixtures, (n) door swing & partition rm 102;(n) wall & door swing @ conference rm 201; ceiling height rm 206;(n) door swing restrm 208;reconfigure restrm 209; door schedule;add hss frames;roof framing @ mech units & special inspections.

Open the permit page

Jan 6, 2022Completed
final sign-off Feb 2024
1011 Turk Stt.i. to remodel of second fl including breakroom, dispatch, raised supervisor area, wall relocations and expansion into corridor.
Details
Permit
202201065473
Status
complete
Filed
Jan 6, 2022
Permit issued
Dec 6, 2022
Final sign-off
Feb 15, 2024
Declared cost
$4,000,000
Address
1011 Turk St

t.i. to remodel of second fl including breakroom, dispatch, raised supervisor area, wall relocations and expansion into corridor.

Open the permit page

$4,000,000
Oct 4, 2021Completed
final sign-off Jan 2023
425 07th Strev to pa201908199221: new equipment and finiehes to the officers dining room,new flooring i the service corride, new flooring for the 2/f central supplies & treatment room; new counter and cabinets, sink, faucet and eye wash in the treatment room and work to the (e) dark room on 2/f.
Details
Permit
202110049757
Status
complete
Filed
Oct 4, 2021
Permit issued
Nov 29, 2021
Final sign-off
Jan 5, 2023
Declared cost
$400,000
Address
425 07th St

rev to pa201908199221: new equipment and finiehes to the officers dining room,new flooring i the service corride, new flooring for the 2/f central supplies & treatment room; new counter and cabinets, sink, faucet and eye wash in the treatment room and work to the (e) dark room on 2/f.

Open the permit page

$400,000
Sep 1, 2021Expired or cancelled
cancelled Jan 2026
1076 Howard Stexploratory soft-demolition of non-structural interior finishes. reference building permit 202107265052 (currently under review) for future tenant improvement to take place.
Details
Permit
202109017558
Status
cancelled
Filed
Sep 1, 2021
Declared cost
$5,000
Address
1076 Howard St

exploratory soft-demolition of non-structural interior finishes. reference building permit 202107265052 (currently under review) for future tenant improvement to take place.

Open the permit page

$5,000
Jul 26, 2021Completed
final sign-off Jun 2022
1076 Howard Stt.i for use as dph drug sobering center and assoicated administrative service offices for same. fire alarm, fire sprinkler, two way comm system and evac signage deferred.
Details
Permit
202107265052
Status
complete
Filed
Jul 26, 2021
Permit issued
Dec 1, 2021
Final sign-off
Jun 21, 2022
Declared cost
$2,100,000
Address
1076 Howard St

t.i for use as dph drug sobering center and assoicated administrative service offices for same. fire alarm, fire sprinkler, two way comm system and evac signage deferred.

Open the permit page

$2,100,000
Jul 1, 2021Completed
final sign-off Feb 2022
1890 Chestnut Stprovide waterproofing repairs at southwesr corner's reading area. repair sealant joist btw storefront, brick wall and concrete curb. repoint (e) mortar joinst w/ concave joinst at limited location indicated in the drawing. clean & seal brick w/ water sealant at all exterior brick
Details
Permit
202107013595
Status
complete
Filed
Jul 1, 2021
Permit issued
Aug 10, 2021
Final sign-off
Feb 15, 2022
Declared cost
$620,000
Address
1890 Chestnut St

provide waterproofing repairs at southwesr corner's reading area. repair sealant joist btw storefront, brick wall and concrete curb. repoint (e) mortar joinst w/ concave joinst at limited location indicated in the drawing. clean & seal brick w/ water sealant at all exterior brick

Open the permit page

$620,000
Aug 10, 2020Completed
final sign-off Jan 2021
200 Cashmere Ststructutral for new metal stair. ref pa #201912300899
Details
Permit
202008101495
Status
complete
Filed
Aug 10, 2020
Permit issued
Sep 24, 2020
Final sign-off
Jan 15, 2021
Declared cost
$5,000
Address
200 Cashmere St

structutral for new metal stair. ref pa #201912300899

Open the permit page

$5,000
Jun 11, 2020Completed
final sign-off Mar 2021
820 Bryant Stto demolish a type 5, 1 story, restaurent bldg.
Details
Permit
202006118463
Status
complete
Filed
Jun 11, 2020
Permit issued
Nov 20, 2020
Final sign-off
Mar 11, 2021
Declared cost
$200,000
Address
820 Bryant St

to demolish a type 5, 1 story, restaurent bldg.

Open the permit page

$200,000
May 21, 2019Never finaled
issued Sep 2019, no final
730 Stanyan Stto demolish a 1-story, type 3 restaurant w/ 1 basement.
Details
Permit
201905211318
Status
issued
Filed
May 21, 2019
Permit issued
Sep 5, 2019
Declared cost
$250,000
Address
730 Stanyan St

to demolish a 1-story, type 3 restaurant w/ 1 basement.

Open the permit page

$250,000
Apr 2, 2019Completed
final sign-off Feb 2020
3255 21st Stelectrical works associated with the replacement of parking access & revenue control systems (parcs) equipement for the garage parcs equipments are not part of this permit application
Details
Permit
201904026902
Status
complete
Filed
Apr 2, 2019
Permit issued
Jun 14, 2019
Final sign-off
Feb 27, 2020
Declared cost
$332,126
Address
3255 21st St

electrical works associated with the replacement of parking access & revenue control systems (parcs) equipement for the garage parcs equipments are not part of this permit application

Open the permit page

$332,126
Mar 28, 2018Completed
final sign-off Mar 2019
42 Hoff Stelectrical works associated with the replacement of parking access & revenue control systems (parcs) equipment for the garage, parcs equipments are not part of this permit application
Details
Permit
201803284814
Status
complete
Filed
Mar 28, 2018
Permit issued
Jan 22, 2019
Final sign-off
Mar 19, 2019
Declared cost
$123,000
Address
42 Hoff St

electrical works associated with the replacement of parking access & revenue control systems (parcs) equipment for the garage, parcs equipments are not part of this permit application

Open the permit page

$123,000
Mar 28, 2018Completed
final sign-off May 2019
415 07th Stelectrical works associated with the replacement of parking access & revenue control systems (parcs) equipment for the garage, parcs equipments are not part of this permit application
Details
Permit
201803284812
Status
complete
Filed
Mar 28, 2018
Permit issued
Jan 22, 2019
Final sign-off
May 1, 2019
Declared cost
$166,100
Address
415 07th St

electrical works associated with the replacement of parking access & revenue control systems (parcs) equipment for the garage, parcs equipments are not part of this permit application

Open the permit page

$166,100
Jun 16, 2017Completed
final sign-off Apr 2021
250 Clay Stelectrical works associated with the replacement of parking access and revenue control system (parcs) equipment for the garage. parcs equipt not part of this application.
Details
Permit
201706169608
Status
complete
Filed
Jun 16, 2017
Permit issued
Sep 17, 2020
Final sign-off
Apr 7, 2021
Declared cost
$245,115
Address
250 Clay St

electrical works associated with the replacement of parking access and revenue control system (parcs) equipment for the garage. parcs equipt not part of this application.

Open the permit page

$245,115
Jun 16, 2017Completed
final sign-off Jul 2021
255 03rd Stelectrical works associated with the replacement of parking access and revenue control system (parcs) equipment for the garage.
Details
Permit
201706169595
Status
complete
Filed
Jun 16, 2017
Permit issued
Jan 21, 2021
Final sign-off
Jul 1, 2021
Declared cost
$217,470
Address
255 03rd St

electrical works associated with the replacement of parking access and revenue control system (parcs) equipment for the garage.

Open the permit page

$217,470