Buffington Victoriano Construction
- Based in
- Dublin
- On San Francisco permits
- Apr 2014 to Apr 2014
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 17, 2014 | Completed final sign-off May 2014 | 160 Everson St | work location on the front elevation of the building. removal and replacement of existing aluminum s.g.d with new fleetwood aluminum sgd. tie in and patch existing roof membrane at the deck location to sgd. remove and replace shingle siding as requried.Details
work location on the front elevation of the building. removal and replacement of existing aluminum s.g.d with new fleetwood aluminum sgd. tie in and patch existing roof membrane at the deck location to sgd. remove and replace shingle siding as requried. | $5,000 |