- 0 permits filed
21 permits since 2000: 19 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 3, 2014 | Completed final sign-off Nov 2014 | 225 30th St | revision to appl #2013.0509.6526 - to reflect install of 3 purcell cabinets original as shown 8 purcell cabinets. no change to rf report. at&t mobility macro wireless facility.Details
revision to appl #2013.0509.6526 - to reflect install of 3 purcell cabinets original as shown 8 purcell cabinets. no change to rf report. at&t mobility macro wireless facility. | |
| May 9, 2013 | Completed final sign-off Nov 2014 | 225 30th St | at&t will be placing a new wireless communication facility on the building. including antenna and related equipment to enhance coverage to their network.Details
at&t will be placing a new wireless communication facility on the building. including antenna and related equipment to enhance coverage to their network. | $125,000 |
| Feb 12, 2013 | Completed final sign-off Sep 2013 | 1801 Broadway | installation of an unmanned wireless facility per case number 2011.1005cDetails
installation of an unmanned wireless facility per case number 2011.1005c | $50,000 |
| Jul 23, 2012 | Completed final sign-off Mar 2013 | 2300 Chestnut St | modification to an unmanned wireless telecommunication facility consisting of 8 equipment cabinets and nine 9 antennasDetails
modification to an unmanned wireless telecommunication facility consisting of 8 equipment cabinets and nine 9 antennas | $125,000 |
| Dec 19, 2011 | Completed final sign-off Jan 2012 | 291 Duboce Av | revision to pa# 2011-1108-8540-framing of removed 2 interior doors & 3 interior windows, installation of soundproofing/insulation, sheetrock & paint. also including structural bracing, framing & 1 hour fire complianceDetails
revision to pa# 2011-1108-8540-framing of removed 2 interior doors & 3 interior windows, installation of soundproofing/insulation, sheetrock & paint. also including structural bracing, framing & 1 hour fire compliance | $3,750 |
| Nov 29, 2011 | Completed final sign-off Dec 2011 | 291 Duboce Av | demolition of (e) office space including 2 doors, 3 interior windows, ceiling, interior wall board & insulation. relocate electrical, demo (e) wood floor to (e) slab below in accordance with ab-017Details
demolition of (e) office space including 2 doors, 3 interior windows, ceiling, interior wall board & insulation. relocate electrical, demo (e) wood floor to (e) slab below in accordance with ab-017 | $6,700 |
| Nov 8, 2011 | Completed final sign-off Mar 2012 | 291 Duboce Av | ground floor -conversion of (e) office space to future wireless equip rm :unmaned telecommunication facility (at&t) w/ 6 radio cabinets,2 equip racks,3 battery back up cabinets in a t.i.space, 7 antennas, 2 roof mounted appalenant cable & cable trays w/in frp screen & 5 mounted to an (e) penthouse.Details
ground floor -conversion of (e) office space to future wireless equip rm :unmaned telecommunication facility (at&t) w/ 6 radio cabinets,2 equip racks,3 battery back up cabinets in a t.i.space, 7 antennas, 2 roof mounted appalenant cable & cable trays w/in frp screen & 5 mounted to an (e) penthouse. | $125,000 |
| Oct 7, 2011 | Completed final sign-off Sep 2012 | 121 Steuart St | at&t . revision to pa# 2011.08.16.2569 to relocate 4 antennas from roof to facade.Details
at&t . revision to pa# 2011.08.16.2569 to relocate 4 antennas from roof to facade. | $125,000 |
| Jun 29, 2011 | Completed final sign-off Nov 2011 | 333 Battery St | installatiomn of new indoor at&t telecomunications, das equipment: three das cabs, one rbs 2106 cab, 2 rbs 3106 cab, two 19" racks, 6 rru 11 units, 1 purcell 6601 cab, 1 rba 72 cab, 1 elec, cab, and 1 telco box all w/in a 10' x 27" fenced areaDetails
installatiomn of new indoor at&t telecomunications, das equipment: three das cabs, one rbs 2106 cab, 2 rbs 3106 cab, two 19" racks, 6 rru 11 units, 1 purcell 6601 cab, 1 rba 72 cab, 1 elec, cab, and 1 telco box all w/in a 10' x 27" fenced area | $16,000 |
| Oct 16, 2009 | Expired or cancelled expired Sep 2012 | 2973 16th St | at & t proposes to install a new unmanned telecom facility consisting of a new lease area with 9 new 2206 cabinets, 3 rbs cabinets, 6 3418 cabinets, 3 argus cabinets, 6 battery back up units & 3 new 23" equipment racks. build architectural fire rated partitions & door & mep as noted on plans.Details
at & t proposes to install a new unmanned telecom facility consisting of a new lease area with 9 new 2206 cabinets, 3 rbs cabinets, 6 3418 cabinets, 3 argus cabinets, 6 battery back up units & 3 new 23" equipment racks. build architectural fire rated partitions & door & mep as noted on plans. | $25,000 |
| Sep 9, 2008 | Completed final sign-off Jan 2009 | 865 Market St | installing equipment cabinets to distributed antenna systemDetails
installing equipment cabinets to distributed antenna system | $70,000 |
| Mar 15, 2005 | Completed final sign-off May 2005 | 1201 Green St | field change to original pa# 2004/06/01/5235. chicklet atenna to be remove from facade of 1st floorDetails
field change to original pa# 2004/06/01/5235. chicklet atenna to be remove from facade of 1st floor | $10,000 |
| Dec 17, 2004 | Expired or cancelled expired Oct 2006 | 2145 19th Av | installation & operation of 1 pair of omni antennas for the aws network. the associated equipmentDetails
installation & operation of 1 pair of omni antennas for the aws network. the associated equipment | $70,000 |
| Dec 16, 2004 | Completed final sign-off Jul 2005 | 2395 29th Av | installation & operation of (1) pair of omni antennas mounted to an (e) bldg. the associatedDetails
installation & operation of (1) pair of omni antennas mounted to an (e) bldg. the associated | $60,000 |
| Dec 9, 2004 | Completed final sign-off May 2005 | 1111 California St | install&operate 1 pair of rinch omni antennas,2 micro cabinets locate east parapet .......Details
install&operate 1 pair of rinch omni antennas,2 micro cabinets locate east parapet ....... | $50,000 |
| Sep 30, 2004 | Completed final sign-off Jul 2005 | 2118 Fillmore St | installation + operation or antenas & associated equipment for the at & t wireless network. the antDetails
installation + operation or antenas & associated equipment for the at & t wireless network. the ant | $50,000 |
| Aug 27, 2004 | Completed final sign-off Apr 2005 | 2322 Lombard St | install & operation of antennas +associated equipment for at&t wireless network.the antennas willDetails
install & operation of antennas +associated equipment for at&t wireless network.the antennas will | $70,000 |
| Jul 29, 2004 | Completed final sign-off May 2005 | 985 Geneva Av | installation of cellular telephone equipment on roof of existing bldngDetails
installation of cellular telephone equipment on roof of existing bldng | $95,000 |
| Jul 19, 2004 | Completed final sign-off Sep 2005 | 950 Market St | construct a telecommunications facility including a 7'x18' equip. area within the bsmnt of the extgDetails
construct a telecommunications facility including a 7'x18' equip. area within the bsmnt of the extg | $70,000 |
| Jun 1, 2004 | Completed final sign-off May 2005 | 1201 Green St | construct telecommunications facility including microcell radio equipment cabinet located in basemeDetails
construct telecommunications facility including microcell radio equipment cabinet located in baseme | $70,000 |
| Dec 31, 2003 | Completed final sign-off Apr 2005 | 5 Embarcadero Center | construct a cellular wireless facility consisting of an equipment cabinets and 2 2' antennas to beDetails
construct a cellular wireless facility consisting of an equipment cabinets and 2 2' antennas to be | $30,000 |