Bruce Construction
- Based in
- San Bruno
- On San Francisco permits
- Mar 2006 to Jan 2014
- Last 24 months
- 0 permits filed
64 permits since 2000: 57 completed, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 2, 2014 | Completed final sign-off Feb 2014 | 2687 37th Av | remodel bathroom including new plumbing fixtures, new cultured marble shower, new drywall, new gfci outlet, repair dry rot as necessary.Details
remodel bathroom including new plumbing fixtures, new cultured marble shower, new drywall, new gfci outlet, repair dry rot as necessary. | $20,000 |
| Aug 13, 2013 | Completed final sign-off Oct 2013 | 732 Treat Av | to obtain final inspection for work approved under pa #9300152. all work is complete.Details
to obtain final inspection for work approved under pa #9300152. all work is complete. | |
| Aug 13, 2013 | Completed final sign-off Oct 2013 | 732 Treat Av | partial foundation replacement as per plan, replacement of 4 windows @ ground floor rear of bldg.Details
partial foundation replacement as per plan, replacement of 4 windows @ ground floor rear of bldg. | $25,000 |
| May 17, 2013 | Completed final sign-off Jul 2013 | 3060 23rd Av | kitchen remodel including remove & replace cabinets, appliances, counters, floors. upgrade electrical and plumbing to make code compliant. no change on walls.Details
kitchen remodel including remove & replace cabinets, appliances, counters, floors. upgrade electrical and plumbing to make code compliant. no change on walls. | $25,000 |
| Jan 22, 2013 | Completed final sign-off Feb 2013 | 101 Tingley St | patch and repair damaged stucco, replace damaged framing and drywall as necessary, framing to be repaired is 4 ft by 8 ftDetails
patch and repair damaged stucco, replace damaged framing and drywall as necessary, framing to be repaired is 4 ft by 8 ft | $4,000 |
| Oct 25, 2012 | Completed final sign-off Jan 2013 | 1938 33rd Av | revision to appl #2012.10.18.2356 - install kitchen cabinets (one section of cabinet), update kitchen electrical as required by code, install new counter & sink, lighting to comply with cec 150(k) partial remodel only.Details
revision to appl #2012.10.18.2356 - install kitchen cabinets (one section of cabinet), update kitchen electrical as required by code, install new counter & sink, lighting to comply with cec 150(k) partial remodel only. | $8,000 |
| Oct 18, 2012 | Completed final sign-off Jan 2013 | 1938 33rd Av | remove & replace bathroom plumbing fixtures in one bathroom. remove & replace tile shower & floor with cultured marble. move furnace duct work in kitchen flue if possible to allow removal of flue chase. this work is to be done on 2nd floor.Details
remove & replace bathroom plumbing fixtures in one bathroom. remove & replace tile shower & floor with cultured marble. move furnace duct work in kitchen flue if possible to allow removal of flue chase. this work is to be done on 2nd floor. | $6,000 |
| Mar 28, 2012 | Completed final sign-off Apr 2012 | 3400 Laguna St | #103- remove bathtub and cultured marble surround and replace with cultured marble shower pan and cultured marble wall surround.Details
#103- remove bathtub and cultured marble surround and replace with cultured marble shower pan and cultured marble wall surround. | $8,000 |
| Feb 13, 2012 | Completed final sign-off Apr 2012 | 2563 39th Av | remodel ground floor bathroom and bedroom, new plumbing fixtures, new tile, new drywall & insul. upgrade plumbing & electrical per code. replace existing patio door in existing opening from bedroom to backyard. (in kind).Details
remodel ground floor bathroom and bedroom, new plumbing fixtures, new tile, new drywall & insul. upgrade plumbing & electrical per code. replace existing patio door in existing opening from bedroom to backyard. (in kind). | $20,000 |
| Oct 3, 2011 | Completed final sign-off Nov 2011 | 3535 Divisadero St | remodel bathroom, remove and replace plumbing and electrical fixtures. update plumbing and electrical as needed. remove & replace 4 windows, no change on walls & openings. 2 front windows paintable fiberglass, back window vinyl.Details
remodel bathroom, remove and replace plumbing and electrical fixtures. update plumbing and electrical as needed. remove & replace 4 windows, no change on walls & openings. 2 front windows paintable fiberglass, back window vinyl. | $10,000 |
| Jul 5, 2011 | Completed final sign-off Aug 2011 | 277 Hermann St | remodel bathroom, including r & r bathtub, tile, etc. update plumbing & electrical as necessary, replace all plumbing fixtures, replace one existing lightwell window in kind, (e) sash to remain.Details
remodel bathroom, including r & r bathtub, tile, etc. update plumbing & electrical as necessary, replace all plumbing fixtures, replace one existing lightwell window in kind, (e) sash to remain. | $20,000 |
| Nov 24, 2010 | Completed final sign-off Jan 2011 | 1354 26th Av | remove and replace floor covering, walls covering and ceiling in bathroom, remove and replace fixtures, update electrical ; provide high efficacy lights or manual on occupany sensorsDetails
remove and replace floor covering, walls covering and ceiling in bathroom, remove and replace fixtures, update electrical ; provide high efficacy lights or manual on occupany sensors | $10,000 |
| Nov 9, 2010 | Completed final sign-off Sep 2011 | 318 Hearst Av | to comply with nov.#200920441. legalize (e) storage room & bathroom removal dtd. 9-20-10Details
to comply with nov.#200920441. legalize (e) storage room & bathroom removal dtd. 9-20-10 | $5,000 |
| Sep 21, 2010 | Completed final sign-off Nov 2010 | 1685 Plymouth Av | remodel bathroom, remove & replace bathtub, pedestal sink and toilet. update plumbing and electrical as necessaryDetails
remodel bathroom, remove & replace bathtub, pedestal sink and toilet. update plumbing and electrical as necessary | $10,000 |
| Aug 12, 2010 | Completed final sign-off Oct 2010 | 3400 Laguna St | unit #411p:remove bathtub & replace w/ shower pan, remove & replace shower valve & cultured marble wall cover. no work to lighting or exhaust system.Details
unit #411p:remove bathtub & replace w/ shower pan, remove & replace shower valve & cultured marble wall cover. no work to lighting or exhaust system. | $8,500 |
| Jun 17, 2010 | Completed final sign-off Nov 2010 | 1568 Union St | remove & replace insulation & drywall damaged by sprinkler line leak in unit above @ walls & clg. by family rm.Details
remove & replace insulation & drywall damaged by sprinkler line leak in unit above @ walls & clg. by family rm. | $10,000 |
| Jun 7, 2010 | Completed final sign-off Aug 2010 | 1283 Church St | remove and replace kitchen cabinets, counter, sink and faucet, and range. install under cabinet lights. new lighting change must comply with cec 150 k. no structural changes.Details
remove and replace kitchen cabinets, counter, sink and faucet, and range. install under cabinet lights. new lighting change must comply with cec 150 k. no structural changes. | $15,000 |
| May 28, 2010 | Completed final sign-off Aug 2010 | 2531 16th Av | remove and replace three wood windows in front of house. repair dry rot and stucco as necessary, repair drywall (plaster) and trim as necessaryDetails
remove and replace three wood windows in front of house. repair dry rot and stucco as necessary, repair drywall (plaster) and trim as necessary | $10,000 |
| Apr 12, 2010 | Completed final sign-off Jun 2010 | 2563 39th Av | remove and repalce all fixtures and drywall in kitchen, new appliances, cabinets and floors. update all mechanical, plumbing and electrical to accomodate new fixtures in kitchen/. at least 50% high efficacy lighting (by wattage).Details
remove and repalce all fixtures and drywall in kitchen, new appliances, cabinets and floors. update all mechanical, plumbing and electrical to accomodate new fixtures in kitchen/. at least 50% high efficacy lighting (by wattage). | $26,600 |
| Aug 20, 2009 | Completed final sign-off Oct 2009 | 1691 25th Av | remove existing bedroom & bathroom from garage. construct new bedroom & bathroom in garage. update electrical & plumbing; level existing slab with 3"-5" of new concrete over existing slab.Details
remove existing bedroom & bathroom from garage. construct new bedroom & bathroom in garage. update electrical & plumbing; level existing slab with 3"-5" of new concrete over existing slab. | $50,000 |
| Jun 16, 2009 | Completed final sign-off Aug 2009 | 942 Stanyan St | renew pa# 2008/07/07/6043 to obtain final inspection. all work has been completed.Details
renew pa# 2008/07/07/6043 to obtain final inspection. all work has been completed. | |
| May 20, 2009 | Completed final sign-off Jul 2009 | 379 30th Av | remove and replace the following: tiled shower pan with one piece pan, wall tile over shower pan, window in side walal of shower (window is currently aluminum and is visible only in backyard, drywall under tile, and shower valve in wall. install occupancy sensor for ceiling light. no structural workDetails
remove and replace the following: tiled shower pan with one piece pan, wall tile over shower pan, window in side walal of shower (window is currently aluminum and is visible only in backyard, drywall under tile, and shower valve in wall. install occupancy sensor for ceiling light. no structural work | $15,000 |
| Apr 30, 2009 | Completed final sign-off Jul 2009 | 468 42nd Av | remodel bathroom. remove & replace bathtub, shower, toilet, 2 windows (lightwell) wooden windows, tile, fixtures & faucets, vanity cabinet, doors, drywall, insulation, plumbing & electrical.Details
remodel bathroom. remove & replace bathtub, shower, toilet, 2 windows (lightwell) wooden windows, tile, fixtures & faucets, vanity cabinet, doors, drywall, insulation, plumbing & electrical. | $25,000 |
| Mar 23, 2009 | Completed final sign-off Jun 2009 | 301 Bryant St | remove/replace wall tile, one piece shower pan, vanity & counter. repair floor tile as necessary. patch drywall as necessary. add gfci outlet, add 3 recess lights, remove/replace plumbing fixtures (shower valve, 2 lavatory faucets)Details
remove/replace wall tile, one piece shower pan, vanity & counter. repair floor tile as necessary. patch drywall as necessary. add gfci outlet, add 3 recess lights, remove/replace plumbing fixtures (shower valve, 2 lavatory faucets) | $8,500 |
| Aug 12, 2008 | Completed final sign-off Sep 2008 | 712 24th Av | remove & replace stucco at front of house entire front. remove & replace 3 aluminum windows with vinyl windows. remove & replace 2 front doors. move weatherhead under separate electrical permit. doors solid wood.Details
remove & replace stucco at front of house entire front. remove & replace 3 aluminum windows with vinyl windows. remove & replace 2 front doors. move weatherhead under separate electrical permit. doors solid wood. | $24,950 |
| Jul 7, 2008 | Expired or cancelled expired Feb 2009 | 942 Stanyan St | renew pa# 2006/12/04/9050 for final inspection only.Details
renew pa# 2006/12/04/9050 for final inspection only. | |
| May 5, 2008 | Completed final sign-off Jul 2008 | 3037 Quintara St | remove & replace kitchen drywall, cabinets, fixtures, counters & appliances. update plumbing & electrical as necessary. repair dry rot if present. no structural changes. no structure. 50% of wattage of lighting to fluorescent.Details
remove & replace kitchen drywall, cabinets, fixtures, counters & appliances. update plumbing & electrical as necessary. repair dry rot if present. no structural changes. no structure. 50% of wattage of lighting to fluorescent. | $33,500 |
| Apr 21, 2008 | Completed final sign-off May 2008 | 239 Magellan Av | replace 11 windows with same (wood) windows. client supplied andersen windows. no framing, no size changes, no ext. work.Details
replace 11 windows with same (wood) windows. client supplied andersen windows. no framing, no size changes, no ext. work. | $13,000 |
| Mar 28, 2008 | Completed final sign-off Jul 2008 | 44 Vulcan Sw | remodel bathroom, incl replac shower pan & tile walls, replace toilet, countertop, lavatory, floor cover (tile to granite). update electrical and paint walls and ceiling. dry wall patch adn dryrot repair as necessary. electrical and plumbing under separate permits.Details
remodel bathroom, incl replac shower pan & tile walls, replace toilet, countertop, lavatory, floor cover (tile to granite). update electrical and paint walls and ceiling. dry wall patch adn dryrot repair as necessary. electrical and plumbing under separate permits. | $20,000 |
| Mar 14, 2008 | Completed final sign-off Sep 2008 | 301 Bryant St | work @ unit# 103 only. remove and replace kitchen cabinets and counters in same configuration. no framing, no structural, no mechanical changes. elec and plumbing trim under separate permits.Details
work @ unit# 103 only. remove and replace kitchen cabinets and counters in same configuration. no framing, no structural, no mechanical changes. elec and plumbing trim under separate permits. | $20,000 |
| Feb 28, 2008 | Completed final sign-off May 2008 | 579 Myra Wy | remodel kitchen and bathrm, including replacement of all cabinets, fixtures, counters, and wall and floor tile. plumbing/elec sep permit. no structural.Details
remodel kitchen and bathrm, including replacement of all cabinets, fixtures, counters, and wall and floor tile. plumbing/elec sep permit. no structural. | $55,300 |
| Jan 29, 2008 | Completed final sign-off May 2008 | 28 Roselyn Tr | remodel bathroom. remove and replace vanity, sink , toilet, tile floor, shower surround. upgdate plumbing and electrical. provide fluorescent light or occupancy sensors in bathroom. provide an exhaust fan w/ bd.d. terminating min 3' from opening/ pl.Details
remodel bathroom. remove and replace vanity, sink , toilet, tile floor, shower surround. upgdate plumbing and electrical. provide fluorescent light or occupancy sensors in bathroom. provide an exhaust fan w/ bd.d. terminating min 3' from opening/ pl. | $28,000 |
| Jan 24, 2008 | Expired or cancelled expired Jan 2011 | 241 Jones St | install 2 new doors in storage area, install 3 new outlets, new wall shelves, carpet, drywall patches, new paint.Details
install 2 new doors in storage area, install 3 new outlets, new wall shelves, carpet, drywall patches, new paint. | $15,000 |
| Jan 11, 2008 | Completed final sign-off Jan 2008 | 946 Stanyan St | to renew for final only pa# 200612290780Details
to renew for final only pa# 200612290780 | |
| Dec 3, 2007 | Completed final sign-off Jan 2008 | 2531 16th Av | remove 8 aluminum windows in rear of home & replace with new vinyl windows. repair dry rot as necessary.Details
remove 8 aluminum windows in rear of home & replace with new vinyl windows. repair dry rot as necessary. | $5,000 |
| Oct 11, 2007 | Completed final sign-off Jan 2008 | 1863 22nd Av | replace dryrot damaged framing as part of bathroom remodel. update plumbing & electrical as needed to bring into code compliance. replace all fixtures. revision to pa#200710034457.Details
replace dryrot damaged framing as part of bathroom remodel. update plumbing & electrical as needed to bring into code compliance. replace all fixtures. revision to pa#200710034457. | $5,000 |
| Sep 24, 2007 | Completed final sign-off Nov 2007 | 276 21st Av | remove & replace tile around bathtub & on floor. remove & replace vanity counter, lavatories, & faucets. remove & replace shower faucet. remove & replace toilet. patch drywall, paint all surfaces. (no change to partitions or windows)Details
remove & replace tile around bathtub & on floor. remove & replace vanity counter, lavatories, & faucets. remove & replace shower faucet. remove & replace toilet. patch drywall, paint all surfaces. (no change to partitions or windows) | $20,000 |
| Aug 20, 2007 | Completed final sign-off Oct 2007 | 3535 Divisadero St | remodel bathroom & adjacent 1/2 bathroom. reframe shower wall same location in main bathroom. remove & replace 2 toilets, 2 vanities & faucets & 1 shower. remove 2 windows in lightwell & replace with dual glaze vinyl windows (min u 0.67) can't be seen from street. same size & location. reframeDetails
remodel bathroom & adjacent 1/2 bathroom. reframe shower wall same location in main bathroom. remove & replace 2 toilets, 2 vanities & faucets & 1 shower. remove 2 windows in lightwell & replace with dual glaze vinyl windows (min u 0.67) can't be seen from street. same size & location. reframe | $28,000 |
| Jul 24, 2007 | Completed final sign-off Sep 2007 | 301 Bryant St | work @ unit# 103 only. replace pedestal lavatory w/ cabinet lavatory. replace light bar w/ mirror light. replace lavatory faucet w/wall mounted faucet. patch drywall. install new tile behind lavatory.Details
work @ unit# 103 only. replace pedestal lavatory w/ cabinet lavatory. replace light bar w/ mirror light. replace lavatory faucet w/wall mounted faucet. patch drywall. install new tile behind lavatory. | $5,000 |
| Jul 6, 2007 | Completed final sign-off Sep 2007 | 3882 23rd St | work in unit#3884. remove & replace kitchen cabinets, counters, fixtures, appliances, and drywall. update plumbing & electrical as necessary by separate licensed contractors under plumb/elect permits. 50% of wattage to be fluorescent.Details
work in unit#3884. remove & replace kitchen cabinets, counters, fixtures, appliances, and drywall. update plumbing & electrical as necessary by separate licensed contractors under plumb/elect permits. 50% of wattage to be fluorescent. | $41,000 |
| Jun 19, 2007 | Completed final sign-off Jan 2008 | 1863 22nd Av | new deck and stairs at rear. 1 kitchen and 1 bathroom remodel. all cabinets,fixtures, appliances, drywall. update plumbing and elec. no structural work.replace headers at 3 openings in lightwell with new 4x12. 2 doors and 1 window to be permanent openings.Details
new deck and stairs at rear. 1 kitchen and 1 bathroom remodel. all cabinets,fixtures, appliances, drywall. update plumbing and elec. no structural work.replace headers at 3 openings in lightwell with new 4x12. 2 doors and 1 window to be permanent openings. | $84,000 |
| Jun 11, 2007 | Completed final sign-off Jun 2007 | 1687 29th Av | renew app #200603166874 for final inspectionDetails
renew app #200603166874 for final inspection | |
| Jun 8, 2007 | Completed final sign-off Aug 2007 | 239 Magellan Av | install new andersen solid wood window in (e) opening on side of house. patch stucco exterior. provide electrical updates under separate permit. insulate & re-drywall interior. not visible from street.Details
install new andersen solid wood window in (e) opening on side of house. patch stucco exterior. provide electrical updates under separate permit. insulate & re-drywall interior. not visible from street. | $6,000 |
| May 7, 2007 | Completed final sign-off Jul 2007 | 2033 Taylor St | remove & replace kitchen cabinets, counters, gas range, sink & faucet, 6 window in lightwell (not visible from street). update plumbing & electrical as needed. patch drywall as needed. work in unit# 2033 taylor only.Details
remove & replace kitchen cabinets, counters, gas range, sink & faucet, 6 window in lightwell (not visible from street). update plumbing & electrical as needed. patch drywall as needed. work in unit# 2033 taylor only. | $25,000 |
| Apr 20, 2007 | Completed final sign-off Aug 2007 | 2346 29th Av | legalize/remove substandard construction and replace with new construction. existing light well in fill on two floor on south p/l. remodel (e) bathroom, replace all fixtures and tile. replace one (e) window in bath per complaint dated 4-19-07. clarification of pa# 200612049049Details
legalize/remove substandard construction and replace with new construction. existing light well in fill on two floor on south p/l. remodel (e) bathroom, replace all fixtures and tile. replace one (e) window in bath per complaint dated 4-19-07. clarification of pa# 200612049049 | $10,000 |
| Feb 1, 2007 | Expired or cancelled expired Feb 2009 | 946 Stanyan St | strap water heater. replace laundry plmg lines to comply with nov 200673066. install new pedestal lavy, install new 60,000 btu forced air furnace, replace rotted closet bend toiletDetails
strap water heater. replace laundry plmg lines to comply with nov 200673066. install new pedestal lavy, install new 60,000 btu forced air furnace, replace rotted closet bend toilet | $7,000 |
| Feb 1, 2007 | Completed final sign-off Feb 2007 | 5160 Diamond Heights Bl | replace 1 kchn cbnt, counters, appli8ances, plmg, fixtures, replace 1 bath cbnts, counter, fuacet. replace kchn and bath receptacles with g f i's . replace toilet, carpets and vinyl(kchn and bath flooringDetails
replace 1 kchn cbnt, counters, appli8ances, plmg, fixtures, replace 1 bath cbnts, counter, fuacet. replace kchn and bath receptacles with g f i's . replace toilet, carpets and vinyl(kchn and bath flooring | $15,000 |
| Dec 29, 2006 | Expired or cancelled expired May 2008 | 946 Stanyan St | repair dry rot and remove & replace bathtub and shower valve and walal cover. (no lihgting change)Details
repair dry rot and remove & replace bathtub and shower valve and walal cover. (no lihgting change) | $5,000 |
| Dec 4, 2006 | Expired or cancelled expired Feb 2009 | 942 Stanyan St | remodel existing kitchen, bathroom, & toilet room. update and repair all plumbing & electrical. remove & repair dryrot damage as necessary. repair/replace interior doors. install new pocket door tracks x3.. repair/replace wood windows w/new wood windows as necessary. install new elect. panel. no strDetails
remodel existing kitchen, bathroom, & toilet room. update and repair all plumbing & electrical. remove & repair dryrot damage as necessary. repair/replace interior doors. install new pocket door tracks x3.. repair/replace wood windows w/new wood windows as necessary. install new elect. panel. no str | $78,000 |
| Dec 4, 2006 | Completed final sign-off Aug 2007 | 2346 29th Av | kitchen remodel with hew 1 hr. fire wall, replacement of old floor joists. addition of half bath. adding 2 skylightsDetails
kitchen remodel with hew 1 hr. fire wall, replacement of old floor joists. addition of half bath. adding 2 skylights | $40,000 |
| Nov 20, 2006 | Completed final sign-off Feb 2007 | 710 Bay St | replace (e) aluminum window in bathroom, lightwell with one hour glass block in kind opening & same size.Details
replace (e) aluminum window in bathroom, lightwell with one hour glass block in kind opening & same size. | $850 |
| Nov 10, 2006 | Completed final sign-off Feb 2007 | 710 Bay St | remodel bathroom. replace all plumbing lines and fixtures (bath, toilet, lavatory) and hook to (e) main waste in lightwell. replace all electrical. new drywall, tile, floor lover, etc. repair dry rot as necessary in bathroom. lighting to be fluorescent or on occupant sersors.Details
remodel bathroom. replace all plumbing lines and fixtures (bath, toilet, lavatory) and hook to (e) main waste in lightwell. replace all electrical. new drywall, tile, floor lover, etc. repair dry rot as necessary in bathroom. lighting to be fluorescent or on occupant sersors. | $20,000 |
| Oct 16, 2006 | Completed final sign-off Dec 2006 | 185 Otsego Av | install 6 new vinyl wndw and 1 patio door over extg original aluminum frames(z flange retrofit)Details
install 6 new vinyl wndw and 1 patio door over extg original aluminum frames(z flange retrofit) | $7,000 |
| Oct 4, 2006 | Completed final sign-off Mar 2007 | 512 Bella Vista Wy | remove top portion of 3 studs in wall between kitchen & living room. install 4x40 header to allow for open pass through. revision to pa# 200607126783.Details
remove top portion of 3 studs in wall between kitchen & living room. install 4x40 header to allow for open pass through. revision to pa# 200607126783. | $500 |
| Sep 19, 2006 | Never finaled issued Sep 2006, no final | 1683 29th Av | replace in kind (e) conc. ftg (cracked with no rebar) w/ in 3'long max same w/ #4 vert's @12" o.c. +3#5 horiz dowels in(n) conc. no other change only @ south pl garage w/ no change to ground nor upper floors.Details
replace in kind (e) conc. ftg (cracked with no rebar) w/ in 3'long max same w/ #4 vert's @12" o.c. +3#5 horiz dowels in(n) conc. no other change only @ south pl garage w/ no change to ground nor upper floors. | $200 |
| Sep 6, 2006 | Never finaled issued Sep 2006, no final | 1687 29th Av | rev. to fixture layout in master bath and groundfloor bath, lighting schedule and rcp update, rev. to (e) concrete post footingsDetails
rev. to fixture layout in master bath and groundfloor bath, lighting schedule and rcp update, rev. to (e) concrete post footings | $1,000 |
| Jul 17, 2006 | Completed final sign-off Mar 2007 | 512 Bella Vista Wy | remove & replace cabinets, countertops, fixtures, wall coverings, floor coveings and appliances update plumbing & electrical as necessary. repair and dry rot/inselt damage sicovered paint at coclusin. at kitchen.Details
remove & replace cabinets, countertops, fixtures, wall coverings, floor coveings and appliances update plumbing & electrical as necessary. repair and dry rot/inselt damage sicovered paint at coclusin. at kitchen. | $21,000 |
| Jul 17, 2006 | Completed final sign-off Dec 2006 | 3535 Divisadero St | remove & replace cabinets, countertops, fixtures, wall coverings, floor coverings,and appliances, update plumbing & electrical as necessary. repair any dry rot/insect damage discovered paint at conclusion at kitchen.Details
remove & replace cabinets, countertops, fixtures, wall coverings, floor coverings,and appliances, update plumbing & electrical as necessary. repair any dry rot/insect damage discovered paint at conclusion at kitchen. | $24,000 |
| Jul 17, 2006 | Completed final sign-off Dec 2006 | 651 Laguna Honda Bl | replace (4 windows in kitchen w/same size windows add headers and jack studs to each opening. at rear/side rear.Details
replace (4 windows in kitchen w/same size windows add headers and jack studs to each opening. at rear/side rear. | $3,500 |
| Jul 11, 2006 | Completed final sign-off Jan 2007 | 2531 16th Av | remodel kitchen & bathroom-remove/replace cabinets, countertop, walls, floors & coverings. update plumbing & electrical as needed. remove & repair dry rot as needed.Details
remodel kitchen & bathroom-remove/replace cabinets, countertop, walls, floors & coverings. update plumbing & electrical as needed. remove & repair dry rot as needed. | $28,000 |
| Jun 20, 2006 | Completed final sign-off Dec 2006 | 651 Laguna Honda Bl | remove cabinets, appliances, fixtures, drywall, finish floor from kitchen. replace all of above with new material. replace dry-rotted framing as necessary.Details
remove cabinets, appliances, fixtures, drywall, finish floor from kitchen. replace all of above with new material. replace dry-rotted framing as necessary. | $15,000 |
| May 1, 2006 | Completed final sign-off Mar 2007 | 15 Hearst Av | replace 75ft of fence ranging in height from 4-6ft. one section (24ft) to have 2-3ft lattice over fence (exists on old fence). excavate ar rear door to expose dry rot anbd repair dry rot as necessary (24 inches max retained soil).Details
replace 75ft of fence ranging in height from 4-6ft. one section (24ft) to have 2-3ft lattice over fence (exists on old fence). excavate ar rear door to expose dry rot anbd repair dry rot as necessary (24 inches max retained soil). | $7,500 |
| Mar 2, 2006 | Completed final sign-off Mar 2016 | 784 Andover St | erect 3 stories 2 dwelling units bldg.Details
erect 3 stories 2 dwelling units bldg. | $425,000 |
| Mar 2, 2006 | Completed final sign-off Mar 2016 | 794 Andover St | to erect 3 story 2 family dwelling.Details
to erect 3 story 2 family dwelling. | $500,000 |