Bruce Baldwin Const
- Based in
- Sacramento
- On San Francisco permits
- Feb 2015 to Feb 2015
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 23, 2015 | Never finaled issued May 2015, no final | 1262 28th Av | kitchen remodel:remove and replace cabinets, counter tops, and appliances, additional lighing will be installed. electrical will be upgraded as necessary. gfci, additional receptacles as required. new flooring, paint, and trim.Details
kitchen remodel:remove and replace cabinets, counter tops, and appliances, additional lighing will be installed. electrical will be upgraded as necessary. gfci, additional receptacles as required. new flooring, paint, and trim. | $70,000 |