Brother & Brother Builders
- Based in
- San Jose
- On San Francisco permits
- Mar 2017 to Nov 2025
- Last 24 months
- 2 permits filed
16 permits since 2000: 10 completed, 2 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 26, 2025 | In progress issued Nov 2025 | 258 Cumberland St | recommencement and completion of work approved under pa 201703151554.Details
recommencement and completion of work approved under pa 201703151554. | $300,000 |
| Nov 4, 2025 | In progress issued Nov 2025 | 258 Cumberland St | recommencement and conpletion of work approved under 202305167872.Details
recommencement and conpletion of work approved under 202305167872. | $60,000 |
| Oct 12, 2023 | Completed final sign-off Sep 2024 | 1057 Prague St | expand/remodel kitchen on 2/f, structural strengthening to compensate for wall removal.Details
expand/remodel kitchen on 2/f, structural strengthening to compensate for wall removal. | $60,000 |
| May 16, 2023 | Never finaled issued Jun 2023, no final | 258 Cumberland St | revision to pa#201703151554. for conditional use application to address sf planning complaint #2021-0003487 enf for additional demo resulting from field conditionDetails
revision to pa#201703151554. for conditional use application to address sf planning complaint #2021-0003487 enf for additional demo resulting from field condition | $20,000 |
| May 6, 2021 | Completed final sign-off Jul 2021 | 28 Montcalm St | in-kind kitchen remodel (no change to the floor or walls) like for like. replacing everything in the same locatoins. subpanel replacements 125a to 125a,mp.Details
in-kind kitchen remodel (no change to the floor or walls) like for like. replacing everything in the same locatoins. subpanel replacements 125a to 125a,mp. | $25,000 |
| May 3, 2021 | Never finaled issued May 2021, no final | 39 Progress St | master bathroom remodel. tub to shower. remove existing shower and leave a closet instead. replace toilet & vanity. add 2 recessed lights.Details
master bathroom remodel. tub to shower. remove existing shower and leave a closet instead. replace toilet & vanity. add 2 recessed lights. | $25,000 |
| Mar 25, 2021 | Completed final sign-off Feb 2022 | 3347 Divisadero St | in-kind kitchen & (3) bathroom remodel, no change to floor plan/walls, like-for-like, all same locations, add recessed lighting.Details
in-kind kitchen & (3) bathroom remodel, no change to floor plan/walls, like-for-like, all same locations, add recessed lighting. | $55,000 |
| Feb 18, 2021 | Completed final sign-off Jul 2021 | 260 King St | unit #425: complete bathroom remodel like-for-likeDetails
unit #425: complete bathroom remodel like-for-like | $25,000 |
| Feb 8, 2021 | Completed final sign-off May 2021 | 141 St Marys Av | in kind bathroom remodel no change to the floor plan or walls. hallway bathroom. like to like, replacing everything in the same locations. add 2 led lights.Details
in kind bathroom remodel no change to the floor plan or walls. hallway bathroom. like to like, replacing everything in the same locations. add 2 led lights. | $25,000 |
| Oct 29, 2020 | Completed final sign-off Aug 2021 | 838 Darien Wy | stucco repair at rear and sides of the house. non street visible.Details
stucco repair at rear and sides of the house. non street visible. | $25,000 |
| Oct 14, 2020 | Completed final sign-off Feb 2021 | 25 Camp St | in-kind bathroom remodel. no change to plan or walls. like for like. replacing everything at same locations. add 3 recessed lights.Details
in-kind bathroom remodel. no change to plan or walls. like for like. replacing everything at same locations. add 3 recessed lights. | $22,775 |
| Aug 11, 2020 | Completed final sign-off Aug 2021 | 838 Darien Wy | stucco repair @ front of the house. stucco only.Details
stucco repair @ front of the house. stucco only. | $25,000 |
| Jun 25, 2020 | Completed final sign-off Dec 2020 | 5810 Mission St | bathroom remodel. like for like. replacing tub, vanity, toilet, and fan. add 3 led lights.Details
bathroom remodel. like for like. replacing tub, vanity, toilet, and fan. add 3 led lights. | $15,000 |
| Oct 31, 2018 | Completed final sign-off Mar 2019 | 100 Beaumont Av | unit a: bathroom remodel, like-for-like, 7'x8', no framing/altered, new plumbing/electrical/fixture updateDetails
unit a: bathroom remodel, like-for-like, 7'x8', no framing/altered, new plumbing/electrical/fixture update | $4,500 |
| Jun 12, 2018 | Expired or cancelled cancelled Jul 2026 | 680 Los Palmos Dr | horizontal addition. at 2/fl: extend (e) faily room & add closet. at 3/fl: add 2 (n) bedrooms, (n) bath and (n) laundry and interior remodel.Details
horizontal addition. at 2/fl: extend (e) faily room & add closet. at 3/fl: add 2 (n) bedrooms, (n) bath and (n) laundry and interior remodel. | $80,000 |
| Mar 15, 2017 | Never finaled issued Jun 2019, no final | 258 Cumberland St | horizontal & vertical additions to an existing 2-story single family dwelling. add 2 bedrooms & 3 bathrooms.Details
horizontal & vertical additions to an existing 2-story single family dwelling. add 2 bedrooms & 3 bathrooms. | $200,000 |