Bro Builders Renovations
- Based in
- Oakland
- On San Francisco permits
- Feb 2022 to Mar 2026
- Last 24 months
- 4 permits filed
12 permits since 2000: 10 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 16, 2026 | In progress issued Jun 2026 | 186 Lippard Av | add two 2nd floor bedrooms and bathroom at rear of the house.Details
add two 2nd floor bedrooms and bathroom at rear of the house. | $150,000 |
| Nov 10, 2025 | Completed final sign-off Sep 2026 | 250 Ortega St | interior kitchen remodel, reconfigure hallway bathroom and rear bedroom bathroom at second floor (top second floor)Details
interior kitchen remodel, reconfigure hallway bathroom and rear bedroom bathroom at second floor (top second floor) | $40,000 |
| Jul 3, 2025 | Completed final sign-off Aug 2025 | 250 Ortega St | remodel kitchen, paint cabinets, new counter top, new stove, hood, and sink, new outlets.Details
remodel kitchen, paint cabinets, new counter top, new stove, hood, and sink, new outlets. | $4,500 |
| Mar 28, 2025 | Completed final sign-off Sep 2026 | 250 Ortega St | lower floor -remodel bathroom replace vanity, toilet, and shower tub. for new shower pan install new floor tile and shower walls tile. 4 led lights,replace bathroom fan like for like. no removal of wallsDetails
lower floor -remodel bathroom replace vanity, toilet, and shower tub. for new shower pan install new floor tile and shower walls tile. 4 led lights,replace bathroom fan like for like. no removal of walls | $5,000 |
| Aug 10, 2023 | Completed final sign-off Oct 2023 | 1200 48th Av | bathroom remodel (35 sq ft) like to like. no structural/layout change. no removal of wallsDetails
bathroom remodel (35 sq ft) like to like. no structural/layout change. no removal of walls | $17,000 |
| Oct 28, 2022 | Completed final sign-off Jan 2023 | 2068 03rd St | one 63 sq ft master bath remodel on 3rd floor. no structural no changes to walls or openings. replace existing with (n) curbless shower, toilet, and vanity. all (n) fixtures and finishes.Details
one 63 sq ft master bath remodel on 3rd floor. no structural no changes to walls or openings. replace existing with (n) curbless shower, toilet, and vanity. all (n) fixtures and finishes. | $14,500 |
| Oct 27, 2022 | Completed final sign-off Sep 2023 | 391 Lansdale Av | one (1) bathroom remodel. in kind, no structural or wall layout changes. 51 sq. ft.Details
one (1) bathroom remodel. in kind, no structural or wall layout changes. 51 sq. ft. | $16,000 |
| Sep 29, 2022 | Never finaled issued Sep 2022, no final | 60 Temescal Tr | two bathroom remodel: one master bath- like for like. one guest bath 70 sqft remove ada tub and install shower. no structural/ no changes to walls or openings.Details
two bathroom remodel: one master bath- like for like. one guest bath 70 sqft remove ada tub and install shower. no structural/ no changes to walls or openings. | $45,000 |
| Sep 13, 2022 | Completed final sign-off Dec 2022 | 1438 Valencia St | one bathroom remodel, like for like, no wall, structural or layout changes.Details
one bathroom remodel, like for like, no wall, structural or layout changes. | $13,000 |
| Jun 24, 2022 | Completed final sign-off Oct 2022 | 436 Alvarado St | complete 1 bathroom remodel like for like move tub to drain, no walls or layout changeDetails
complete 1 bathroom remodel like for like move tub to drain, no walls or layout change | $22,000 |
| Jun 7, 2022 | Completed final sign-off Oct 2022 | 25 Miraloma Dr | 1 bathroom remodel like for like: no walls or layout change: toilet- convert into a wall mounted toilet tub to tubDetails
1 bathroom remodel like for like: no walls or layout change: toilet- convert into a wall mounted toilet tub to tub | $20,000 |
| Feb 7, 2022 | Completed final sign-off Oct 2022 | 25 Miraloma Dr | demo of existing concrete block fence. construction of new 6 ft fence with 3 ft concrete block wall and 3 ft wrought iron bar. installation of new iron gate.Details
demo of existing concrete block fence. construction of new 6 ft fence with 3 ft concrete block wall and 3 ft wrought iron bar. installation of new iron gate. | $15,000 |