Britton Builders Incorporated
- Based in
- San Francisco
- On San Francisco permits
- Aug 2019 to Jun 2022
- Last 24 months
- 0 permits filed
10 permits since 2000: 5 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 28, 2022 | Expired or cancelled cancelled Jan 2026 | 1740 Cesar Chavez St | rev to pa# 2021-0406-7991: suite 200 updating finishes in break areas 1512 sf new drinking fountain added plumbing per drinking no ada work structural work under permit 2021-0406-7991Details
rev to pa# 2021-0406-7991: suite 200 updating finishes in break areas 1512 sf new drinking fountain added plumbing per drinking no ada work structural work under permit 2021-0406-7991 | |
| Nov 22, 2021 | Expired or cancelled expired Nov 2024 | 998 Geneva Av | repair damage caused by car accident on 11/8/2021: per nov#202184144. reframe structure and window opening, use existing windows. patch stucco and paint in kind. repair in-kind.Details
repair damage caused by car accident on 11/8/2021: per nov#202184144. reframe structure and window opening, use existing windows. patch stucco and paint in kind. repair in-kind. | $5,000 |
| Aug 9, 2021 | Completed final sign-off Feb 2022 | 980 Teresita Bl | remove and replace (e) street facing window in (e) opening with new wood window. repair dry rot framing as required patch and repair stucco at exterior. patch and repair sheetrock and interior. new window to be aluminum clad wood. max u-factor less than or equal to 0.30.Details
remove and replace (e) street facing window in (e) opening with new wood window. repair dry rot framing as required patch and repair stucco at exterior. patch and repair sheetrock and interior. new window to be aluminum clad wood. max u-factor less than or equal to 0.30. | $15,000 |
| Jan 21, 2021 | Completed final sign-off Jul 2023 | 555 Teresita Bl | 1 of 3 bathroom remodel on 2nd fl. remove & replace (e) finishes & fixtures. (e) locations to remain. replace (e) wood french door at 2nd fl bedroom. front porch remove (e) posts, slab on grade, retaining walls & railing. (n) post, foundation, steps & metal railing.Details
1 of 3 bathroom remodel on 2nd fl. remove & replace (e) finishes & fixtures. (e) locations to remain. replace (e) wood french door at 2nd fl bedroom. front porch remove (e) posts, slab on grade, retaining walls & railing. (n) post, foundation, steps & metal railing. | $35,000 |
| Oct 13, 2020 | Never finaled issued Sep 2021, no final | 122 Tiffany Av | revision to pa #201607011423, 201908169052, 20190427852: add mech room @ 1/f. move exterior stair east for door. move stair on front facade to align w/stair adjacent to mech room. revise exterior stair layout at south stair adjacent to #140a & 140b.Details
revision to pa #201607011423, 201908169052, 20190427852: add mech room @ 1/f. move exterior stair east for door. move stair on front facade to align w/stair adjacent to mech room. revise exterior stair layout at south stair adjacent to #140a & 140b. | |
| Oct 13, 2020 | Completed final sign-off Jul 2023 | 555 Teresita Bl | remodel existing second floor bathroom. move non-load bearing wall. move sink. remodel showerDetails
remodel existing second floor bathroom. move non-load bearing wall. move sink. remodel shower | $11,000 |
| Mar 3, 2020 | Completed final sign-off Jul 2020 | 2710 Market St | unit 1 - kitchen remodel - remove & replace cabinets in-kind. new sheetrock @ unit corridor property line wall. previously wood paneling. two layers of sheetrock to be provided. total area of new sheetrock @ corridor roughly 160 sfDetails
unit 1 - kitchen remodel - remove & replace cabinets in-kind. new sheetrock @ unit corridor property line wall. previously wood paneling. two layers of sheetrock to be provided. total area of new sheetrock @ corridor roughly 160 sf | $2,500 |
| Oct 9, 2019 | Expired or cancelled expired Nov 2022 | 122 Tiffany Av | temporary shoring as req'd for work as approved under pa 2016-0701-1423Details
temporary shoring as req'd for work as approved under pa 2016-0701-1423 | $40,000 |
| Aug 22, 2019 | Completed final sign-off May 2025 | 3351 Cesar Chavez St | soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4 | $60,000 |
| Aug 16, 2019 | Never finaled issued Mar 2020, no final | 122 Tiffany Av | add new dwelling unit on the ground floor per ordinance 162-16.Details
add new dwelling unit on the ground floor per ordinance 162-16. | $90,000 |