Bright Eagles Construction
- Based in
- San Jose
- On San Francisco permits
- Sep 2013 to Sep 2013
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 19, 2013 | Never finaled issued Sep 2013, no final | 205 09th St | this permit is for all rooms. replace doors. install floors over existing, patch sheet rock, replace (e) conduit & replace w/romex behind walls. paint. minimum 1-3/4" forty five minute fire rated doors. to comply with his nov's 200236439, 201244401, 201313221, 201314151.Details
this permit is for all rooms. replace doors. install floors over existing, patch sheet rock, replace (e) conduit & replace w/romex behind walls. paint. minimum 1-3/4" forty five minute fire rated doors. to comply with his nov's 200236439, 201244401, 201313221, 201314151. | $100,000 |