Brellin Company
- Based in
- San Rafael
- On San Francisco permits
- Jun 2000 to Dec 2024
- Last 24 months
- 1 permit filed
22 permits since 2000: 16 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 16, 2024 | Completed final sign-off Jan 2025 | 3916 Sacramento St | replace lap siding on top level ne and nw corners with cement siding (500sf) not visible from street.Details
replace lap siding on top level ne and nw corners with cement siding (500sf) not visible from street. | $18,000 |
| Feb 15, 2022 | Never finaled issued Mar 2022, no final | 2400 Steiner St | unit #4: (4th floor only) kitchen & bathroom renovations including upgrading utilitys throughout. all work in unit #4 only. insullate walls & ceiling. new sheetrock.Details
unit #4: (4th floor only) kitchen & bathroom renovations including upgrading utilitys throughout. all work in unit #4 only. insullate walls & ceiling. new sheetrock. | $360,000 |
| Aug 3, 2018 | Completed final sign-off Jul 2019 | 3916 Sacramento St | construct new roof deck. new internal staircase from 3rd floor to new roof deck.Details
construct new roof deck. new internal staircase from 3rd floor to new roof deck. | $100,000 |
| Mar 15, 2018 | Completed final sign-off Feb 2019 | 3138 Franklin St | move w/d to hall closet, kitchen remodeol. add 1/2 bath in old laundry closetDetails
move w/d to hall closet, kitchen remodeol. add 1/2 bath in old laundry closet | $60,000 |
| May 25, 2017 | Completed final sign-off Jul 2017 | 3916 Sacramento St | install & paint new siding over existing siding. new hardie plank lap siding to be painted to match existing color. new siding to be applied on north & west walls only. no street facing walls to be affected.Details
install & paint new siding over existing siding. new hardie plank lap siding to be painted to match existing color. new siding to be applied on north & west walls only. no street facing walls to be affected. | $4,000 |
| Mar 30, 2017 | Completed final sign-off Jul 2017 | 3916 Sacramento St | remove 12 street facing windows. install 12 new windows with operation and color same as existing. new windows are to be wood with aluminum clading. max u-factor 0.32Details
remove 12 street facing windows. install 12 new windows with operation and color same as existing. new windows are to be wood with aluminum clading. max u-factor 0.32 | $3,000 |
| Feb 22, 2017 | Completed final sign-off May 2017 | 3918 Sacramento St | remove/replace rotted windows & affected siding w/same size windows (12); not visible to street.Details
remove/replace rotted windows & affected siding w/same size windows (12); not visible to street. | $3,500 |
| Oct 10, 2014 | Never finaled issued Oct 2014, no final | 125 Santa Paula Av | remove existing conc. patio and dry stack rock retaining wall. install new patios, stepping stones, conc retaining wall, barbeque with water, gas & electrical. replace rear patio door with new.Details
remove existing conc. patio and dry stack rock retaining wall. install new patios, stepping stones, conc retaining wall, barbeque with water, gas & electrical. replace rear patio door with new. | $24,000 |
| Feb 12, 2014 | Expired or cancelled expired Dec 2016 | 2760 Bush St | voluntary replace interior wooden guardrail and stair handrail, voluntary upgrade exterior front stairway by adding additional stringer to existing stringer, repair/replace treads/risers if needed, repair existing tree planter on sidewalk, replace/repair concrete in sidewalk as needed.Details
voluntary replace interior wooden guardrail and stair handrail, voluntary upgrade exterior front stairway by adding additional stringer to existing stringer, repair/replace treads/risers if needed, repair existing tree planter on sidewalk, replace/repair concrete in sidewalk as needed. | $5,000 |
| Jan 16, 2014 | Completed final sign-off Jan 2014 | 2736 Bush St | revision to pa201305076245; to install gas stove and sink in cabinet on (e) roof deck.Details
revision to pa201305076245; to install gas stove and sink in cabinet on (e) roof deck. | $1,500 |
| Jul 3, 2013 | Completed final sign-off Jul 2013 | 1150 Stanyan St | to obtain final inspection for work approved under pa# 201004210722. all work is complete.Details
to obtain final inspection for work approved under pa# 201004210722. all work is complete. | |
| May 7, 2013 | Never finaled issued Jul 2013, no final | 2736 Bush St | remove extg deck guardrails and replace with new wind guard guardrails. addtion of non enclosing screen walls at roof deck and master deck. replacement of extg exterior glass door. not visible from street.Details
remove extg deck guardrails and replace with new wind guard guardrails. addtion of non enclosing screen walls at roof deck and master deck. replacement of extg exterior glass door. not visible from street. | $3,000 |
| Jan 4, 2013 | Completed final sign-off Feb 2013 | 2734 Bush St | remove & replace front stairs, replace iwth wood framed stairs, same foot rpint. add light plug for under stair storage.Details
remove & replace front stairs, replace iwth wood framed stairs, same foot rpint. add light plug for under stair storage. | $10,000 |
| Apr 21, 2010 | Never finaled issued Apr 2010, no final | 1150 Stanyan St | demo existing fixtures & surfaces in two bathrooms, install new fixtures and tile on 1st & 2nd floors. no walls will be moved ot structural altered.Details
demo existing fixtures & surfaces in two bathrooms, install new fixtures and tile on 1st & 2nd floors. no walls will be moved ot structural altered. | $14,500 |
| Oct 19, 2009 | Completed final sign-off Dec 2009 | 2734 Bush St | repair rotten deck joists ar rear deck, retain (e) size & style, repair is less than 50%, repair in kindDetails
repair rotten deck joists ar rear deck, retain (e) size & style, repair is less than 50%, repair in kind | $5,000 |
| Sep 26, 2008 | Completed final sign-off Sep 2008 | 57 Rodgers St | replace cabinets & appliances 1 kitchen. no change to walls doors or windows.Details
replace cabinets & appliances 1 kitchen. no change to walls doors or windows. | $8,350 |
| Jul 10, 2008 | Completed final sign-off Dec 2008 | 1751 Lyon St | kitchen and bath remodel. minor wall changes, new floors, new cabinets, countertop. new fixtures and appliances, new stair handrailDetails
kitchen and bath remodel. minor wall changes, new floors, new cabinets, countertop. new fixtures and appliances, new stair handrail | $75,000 |
| Jul 30, 2007 | Completed final sign-off Sep 2007 | 3138 Franklin St | bathroom remodel at 2nd fl.Details
bathroom remodel at 2nd fl. | $125,000 |
| Jun 5, 2007 | Completed final sign-off Jun 2007 | 3138 Franklin St | replace garage slab. min 3 1/2" slab. 1/2 rebar. 18" o/c each direction.Details
replace garage slab. min 3 1/2" slab. 1/2 rebar. 18" o/c each direction. | $12,500 |
| Oct 24, 2006 | Completed final sign-off Feb 2007 | 2866 Pine St | replace reduced decking & rail on 2nd fl roof deck. replace in kind at rear of house. not visible from street.Details
replace reduced decking & rail on 2nd fl roof deck. replace in kind at rear of house. not visible from street. | $4,290 |
| Aug 21, 2000 | Expired or cancelled expired Jan 2001 | 3426 Broderick St | revision to app# 2000/06/08/2203 1). no steel at garage entry 2). no new wall west end of bathroomDetails
revision to app# 2000/06/08/2203 1). no steel at garage entry 2). no new wall west end of bathroom | |
| Jun 8, 2000 | Completed final sign-off Apr 2001 | 3426 Broderick St | garage remodel-new steel frameDetails
garage remodel-new steel frame | $100,000 |