Branz Built
- Based in
- San Mateo
- On San Francisco permits
- Jul 2025 to Oct 2025
- Last 24 months
- 3 permits filed
3 permits since 2000: 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 16, 2025 | In progress issued Oct 2025 | 46 Calgary St | replace/reseal exterior windows, u=0.3max. (3) windows visible from street. replace rear exterior siding. replace exterior doors. all like for like.Details
replace/reseal exterior windows, u=0.3max. (3) windows visible from street. replace rear exterior siding. replace exterior doors. all like for like. | $15,000 |
| Oct 15, 2025 | In progress issued Oct 2025 | 46 Calgary St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $11,000 |
| Jul 10, 2025 | In progress issued Jul 2025 | 1415 Chestnut St | garage 2025wall repairDetails
garage 2025wall repair | $5,000 |