Branko Kruslin Painting
- Based in
- Redwood City
- On San Francisco permits
- Jul 2008 to Jul 2008
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2008 | Completed final sign-off Dec 2008 | 784 Wisconsin St | install sheetrock over exposed lumber in ceiling in level 3 master bedroom, level 2 living area. 3rd fl remove walk in closet in master bedroom, replace with closet cabinets. 2nd fl, open walls at pantry around kit entrance,replace cabinets. install recessed lighing on 2nd fl and clg fan on 3rd fl.Details
install sheetrock over exposed lumber in ceiling in level 3 master bedroom, level 2 living area. 3rd fl remove walk in closet in master bedroom, replace with closet cabinets. 2nd fl, open walls at pantry around kit entrance,replace cabinets. install recessed lighing on 2nd fl and clg fan on 3rd fl. | $17,800 |