Bradford Huang Contraction Co
- Based in
- San Francisco
- On San Francisco permits
- Jun 2006 to Nov 2025
- Last 24 months
- 6 permits filed
38 permits since 2000: 31 completed, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 26, 2025 | Completed final sign-off Jun 2026 | 170 Ocean Av | adding a new full bath to create a new master bedroom.Details
adding a new full bath to create a new master bedroom. | $15,000 |
| Oct 7, 2025 | Completed final sign-off May 2026 | 32 Santa Fe Av | 1st fl - add 2 bedrooms, 2 full bathrooms, entertainment room, gym, a kitchenette (2 burner), and a tankless water heaterDetails
1st fl - add 2 bedrooms, 2 full bathrooms, entertainment room, gym, a kitchenette (2 burner), and a tankless water heater | $50,000 |
| Apr 3, 2025 | Completed final sign-off Sep 2025 | 1930 Silver Av | rev 202503202696: 2/f: minor change in kitchen layout per plan.Details
rev 202503202696: 2/f: minor change in kitchen layout per plan. | |
| Mar 20, 2025 | Completed final sign-off Sep 2025 | 1930 Silver Av | rev 202412237344: 2/f: add full bathroom, remodel kitchen - move walls, living and dining rooms, bathroom. 1/f: add 2 bedrooms, 2 bathrooms, bar, replace mech.Details
rev 202412237344: 2/f: add full bathroom, remodel kitchen - move walls, living and dining rooms, bathroom. 1/f: add 2 bedrooms, 2 bathrooms, bar, replace mech. | $140,000 |
| Dec 23, 2024 | Completed final sign-off Sep 2025 | 1930 Silver Av | remodel 1 kitchen and 1 bathroom in-kind on 2/f.Details
remodel 1 kitchen and 1 bathroom in-kind on 2/f. | $40,000 |
| Dec 10, 2024 | Completed final sign-off May 2025 | 28 Waterville St | revision to pa # 2024-0711-6250 add bathroom to (e) shed at the rear. reconfigure first fl entry.Details
revision to pa # 2024-0711-6250 add bathroom to (e) shed at the rear. reconfigure first fl entry. | $20,000 |
| Jan 25, 2024 | Completed final sign-off Feb 2024 | 2074 Bancroft Av | to obtain final inspection for work approved under pa#201902052132 & 201912099056. all work complete.Details
to obtain final inspection for work approved under pa#201902052132 & 201912099056. all work complete. | |
| Apr 15, 2022 | Completed final sign-off Sep 2023 | 517 Ulloa St | kitchen & bathroom remodel on 2nd fl (replace in kind, no change in layout). decay repair as in kind and destructive test/ sheetrock removal to expose decay (no struc. work). no exterior work.Details
kitchen & bathroom remodel on 2nd fl (replace in kind, no change in layout). decay repair as in kind and destructive test/ sheetrock removal to expose decay (no struc. work). no exterior work. | $20,000 |
| Oct 15, 2021 | Completed final sign-off Oct 2021 | 1383 14th Av | revise pa 2020-0716-0342 revise 1st floor bathroom and add sink. move laundry to garageDetails
revise pa 2020-0716-0342 revise 1st floor bathroom and add sink. move laundry to garage | |
| Mar 31, 2021 | Completed final sign-off Dec 2024 | 1906 Greenwich St | add one dormer at rear. change door at front to window and add 210 sq ft roof deck, reconfigure interior stairs, add bthroom, bedroom, and laundry on 1st floor. remove 2 bed and relocate 1/2 bath on 2nd floor. add 2 bed, 2 bath on third floor.Details
add one dormer at rear. change door at front to window and add 210 sq ft roof deck, reconfigure interior stairs, add bthroom, bedroom, and laundry on 1st floor. remove 2 bed and relocate 1/2 bath on 2nd floor. add 2 bed, 2 bath on third floor. | $280,000 |
| Jan 8, 2021 | Completed final sign-off Nov 2021 | 1900 Carroll Av | construction revision to pa# 201912301003. new electrical at equipment.Details
construction revision to pa# 201912301003. new electrical at equipment. | |
| Oct 14, 2020 | Completed final sign-off Aug 2021 | 1286 45th Av | as built revision to pa #2019-1231-1117: add sliding door on 1st floor, replace windows on 2nd floor (same size & type, and location). reconfigure 2nd floor bathroom & closet area.Details
as built revision to pa #2019-1231-1117: add sliding door on 1st floor, replace windows on 2nd floor (same size & type, and location). reconfigure 2nd floor bathroom & closet area. | $1,000 |
| Feb 25, 2020 | Never finaled issued Mar 2020, no final | 1945 Carroll Av | comply with nov# 202016001&202014828 per plans. legalization of (e) equipment platform and storage racks, per plans structural strengthening of (e) equipment platform and storage rack. deffered submittal: fire sprnklr of equip. platform & storage rack, mepDetails
comply with nov# 202016001&202014828 per plans. legalization of (e) equipment platform and storage racks, per plans structural strengthening of (e) equipment platform and storage rack. deffered submittal: fire sprnklr of equip. platform & storage rack, mep | $60,000 |
| Feb 11, 2020 | Completed final sign-off Jan 2021 | 1945 Carroll Av | to comply with nov# 202014828. removal of existing two illegal storage sheds not part of main building.Details
to comply with nov# 202014828. removal of existing two illegal storage sheds not part of main building. | $5,000 |
| Dec 31, 2019 | Completed final sign-off Aug 2021 | 1286 45th Av | new two bedroom, two bathroom on first floor. new bathroom on second floor. remove interior stairs. comply with complaint 201956541Details
new two bedroom, two bathroom on first floor. new bathroom on second floor. remove interior stairs. comply with complaint 201956541 | $180,000 |
| Dec 30, 2019 | Completed final sign-off Nov 2021 | 1900 Carroll Av | egress and accessibility improvement. equipment installation change of use from s2 to s1/f1Details
egress and accessibility improvement. equipment installation change of use from s2 to s1/f1 | $92,636 |
| Dec 20, 2019 | Completed final sign-off Oct 2020 | 350 Prague St | comply w/ nov #201901795 & 201902308: convert ground floor space into habitable space. 2 bedrooms, 2 bathrooms.Details
comply w/ nov #201901795 & 201902308: convert ground floor space into habitable space. 2 bedrooms, 2 bathrooms. | $20,000 |
| Dec 9, 2019 | Expired or cancelled expired Mar 2022 | 2074 Bancroft Av | revision to pa# 2019-0205-2132. unit 2047: new dekc at rear. unit 2047a: add one bedroom.Details
revision to pa# 2019-0205-2132. unit 2047: new dekc at rear. unit 2047a: add one bedroom. | $5,000 |
| Nov 20, 2019 | Never finaled issued Nov 2019, no final | 1906 Greenwich St | kitchen remodel. (1) bathroom remodel,decay repari as in kind on first floor. front windows to be wood with original dry rot removed inside.Details
kitchen remodel. (1) bathroom remodel,decay repari as in kind on first floor. front windows to be wood with original dry rot removed inside. | |
| May 31, 2019 | Completed final sign-off Sep 2019 | 419 28th Av | revise to pa# 2018-0525-0262.Details
revise to pa# 2018-0525-0262. | |
| May 8, 2019 | Completed final sign-off Jun 2019 | 3107 Franklin St | as built revision to pa 2017-0922-9310.Details
as built revision to pa 2017-0922-9310. | $30,000 |
| Feb 5, 2019 | Expired or cancelled expired Mar 2022 | 2074 Bancroft Av | per unit legalization ord# 43-14, legalize of dwelling unit installed w/o permit. comply w/ nov# 201804991 and 201890208. 1st flr: kitchen, living room, 1 full bath and 1 bedroom.Details
per unit legalization ord# 43-14, legalize of dwelling unit installed w/o permit. comply w/ nov# 201804991 and 201890208. 1st flr: kitchen, living room, 1 full bath and 1 bedroom. | $60,000 |
| Jan 22, 2019 | Completed final sign-off Sep 2019 | 2162 35th Av | 1/f: add 2 bedrooms, 2 full bathrooms andmedia room. 2/f: convert (e) diningt o office, remodel (e) bathroom and add 1 bathroom.Details
1/f: add 2 bedrooms, 2 full bathrooms andmedia room. 2/f: convert (e) diningt o office, remodel (e) bathroom and add 1 bathroom. | $55,000 |
| Oct 24, 2018 | Completed final sign-off Mar 2020 | 28 Waterville St | legalize unit per ord# 43-14 w/ two bedrooms & two bathrooms.Details
legalize unit per ord# 43-14 w/ two bedrooms & two bathrooms. | $75,000 |
| Jun 22, 2018 | Never finaled issued Jun 2018, no final | 167 Venus St | change the hardwood floorsDetails
change the hardwood floors | $2,000 |
| Jun 22, 2018 | Never finaled issued Jun 2018, no final | 1474 Palou Av | change the hardwood floors on the main fl.Details
change the hardwood floors on the main fl. | $2,000 |
| May 29, 2018 | Completed final sign-off Aug 2018 | 663 22nd Av | as built revision 200606093592 reconfigure room and bathroomsDetails
as built revision 200606093592 reconfigure room and bathrooms | |
| May 25, 2018 | Completed final sign-off Sep 2019 | 419 28th Av | revision to 201709067038. new deck at rear, remove non used sprinkler system on first floorDetails
revision to 201709067038. new deck at rear, remove non used sprinkler system on first floor | $20,000 |
| Mar 7, 2018 | Completed final sign-off Mar 2020 | 28 Waterville St | new bathroom and partition wall on 2nd fl. remodel kitchen. gr fl rooms to be legalized on separate permit, no work gr fl. structural upgrade on 1/fDetails
new bathroom and partition wall on 2nd fl. remodel kitchen. gr fl rooms to be legalized on separate permit, no work gr fl. structural upgrade on 1/f | $25,000 |
| Sep 22, 2017 | Completed final sign-off Jun 2019 | 3107 Franklin St | add washer and dryer and remodel bath on 2nd fl. new bedroom, family rm, laundry and bath on 1st flDetails
add washer and dryer and remodel bath on 2nd fl. new bedroom, family rm, laundry and bath on 1st fl | $85,000 |
| Sep 6, 2017 | Completed final sign-off Sep 2019 | 419 28th Av | two new bathrooms on 3rd floor, remodel ktichen & relcoate half bathroom on 2nd floor, new family room, bathroom & bedroom on first floor. new stair from 1st floor to 2nd floor.Details
two new bathrooms on 3rd floor, remodel ktichen & relcoate half bathroom on 2nd floor, new family room, bathroom & bedroom on first floor. new stair from 1st floor to 2nd floor. | $130,000 |
| May 2, 2017 | Completed final sign-off May 2017 | 2418 16th Av | convert 1st fl 1/2 bath to full bath, reconfigure bath, closet new wine bar 1st fl. new closet, shelf 2ndf l, reconfigure bath, closet. remove deck, remove wall 3rd fl new shelf. retaiing wall replacement at rearDetails
convert 1st fl 1/2 bath to full bath, reconfigure bath, closet new wine bar 1st fl. new closet, shelf 2ndf l, reconfigure bath, closet. remove deck, remove wall 3rd fl new shelf. retaiing wall replacement at rear | $18,000 |
| Sep 9, 2016 | Completed final sign-off Jan 2018 | 88 Valparaiso St | legalize unit per no.43-14 legalize kitchen, bathroom (2) bedroom and living room on first floor. sprinkler under separate permit.Details
legalize unit per no.43-14 legalize kitchen, bathroom (2) bedroom and living room on first floor. sprinkler under separate permit. | $20,000 |
| Jun 29, 2016 | Expired or cancelled cancelled Nov 2016 | 207 Brussels St | change tile in the kitchen, change hard wood floor in the main floor and change cabinetDetails
change tile in the kitchen, change hard wood floor in the main floor and change cabinet | $21,501 |
| Mar 7, 2016 | Completed final sign-off Apr 2016 | 2418 16th Av | repair stairs - front less tha 50% in kindDetails
repair stairs - front less tha 50% in kind | $2,000 |
| Mar 4, 2016 | Completed final sign-off Jan 2018 | 88 Valparaiso St | bathroom remodel: replace tiles. to comply with complaint #201602991.Details
bathroom remodel: replace tiles. to comply with complaint #201602991. | $1,800 |
| Nov 5, 2015 | Completed final sign-off Apr 2017 | 2418 16th Av | revise building permit #9501921. add bathroom, media room, laundry room, and bedroom at ground level. add one bedroom and one half bathroom to 1st floor, add one bathroom at 2nd floor, add one story deck at rear of bldg and reduce rear pop out and lightwell. interior demo less than 75%. no work visbDetails
revise building permit #9501921. add bathroom, media room, laundry room, and bedroom at ground level. add one bedroom and one half bathroom to 1st floor, add one bathroom at 2nd floor, add one story deck at rear of bldg and reduce rear pop out and lightwell. interior demo less than 75%. no work visb | $65,000 |
| Jun 9, 2006 | Completed final sign-off Aug 2018 | 663 22nd Av | rear 3 story addition of a single family dwelling. electrical, plumbing & mechanical under separate permits.Details
rear 3 story addition of a single family dwelling. electrical, plumbing & mechanical under separate permits. | $180,000 |