Brachi Construction
- Based in
- Richmond
- On San Francisco permits
- Dec 2018 to Nov 2019
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 12, 2019 | Completed final sign-off Mar 2020 | 380 Monterey Bl | unit 304 aka unit 17 (pts): remodel kitchen--replace caibnets, appliances in-kind. add stacked washer/dryer. replace fixtures & finished. bathroom: new fixtures & finishes & retiling.Details
unit 304 aka unit 17 (pts): remodel kitchen--replace caibnets, appliances in-kind. add stacked washer/dryer. replace fixtures & finished. bathroom: new fixtures & finishes & retiling. | $12,000 |
| Dec 5, 2018 | Completed final sign-off Mar 2019 | 6260 Geary Bl | minor tenant improvement: replace 2 new shampoo sinks, upgrade new electrical panel for the workshop. replace new tile floor. replace new toiliet. replace in-kind & same location. no walls or layout modifications.Details
minor tenant improvement: replace 2 new shampoo sinks, upgrade new electrical panel for the workshop. replace new tile floor. replace new toiliet. replace in-kind & same location. no walls or layout modifications. | $5,000 |